Notice of Availability of Environmental Assessment, 60383 [2015-25384]

Download as PDF 60383 Federal Register / Vol. 80, No. 193 / Tuesday, October 6, 2015 / Notices basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the application. Agencies may obtain copies of the application directly from the applicant. A copy of any motion to intervene or protest must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: September 29, 2015. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13704–002; Project No. 13701– 002, et. al.] Notice of Availability of Environmental Assessment [FR Doc. 2015–25382 Filed 10–5–15; 8:45 am] BILLING CODE 6717–01–P tkelley on DSK3SPTVN1PROD with NOTICES Arkabutla Lake Hydroelectric Project ............................................................................................................................... Sardis Lake Hydroelectric Project .................................................................................................................................... Enid Lake Hydroelectric Project ....................................................................................................................................... Grenada Lake Hydroelectric Project ................................................................................................................................ In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations, 18 Code of Federal Regulations part 380, the Office of Energy Projects has reviewed applications for original licenses for the Arkabutla Lake Hydroelectric Project (FERC Project No. 13704–002), Sardis Lake Hydroelectric Project (FERC Project No. 13701–002), Enid Lake Hydroelectric Project (FERC Project No. 13703–002), and Grenada Lake Hydroelectric Project (FERC Project No. 13702–002). The proposed projects would be constructed at the U.S. Army Corps of Engineers’ (Corps’) existing Arkabutla, Sardis, Enid, and Grenada dams located within the Yazoo River Basin in Mississippi. The Arkabutla Lake Hydroelectric Project would be near the town of Hernando, Mississippi, in Tate and DeSoto Counties on the Coldwater River at river mile (RM) 86. The Sardis Lake Hydroelectric Project would be located near the town of Sardis, Mississippi, in Panola County on the Little Tallahatchie River at RM 69. The Enid Lake Hydroelectric Project would be located near the town of Enid, Mississippi, in Yalobusha County on the Yocona River at RM 14.5. The Grenada Lake Hydroelectric Project would be located near the town of Grenada, Mississippi, in Grenada County on the Yalobusha River at RM 47.3. The projects would occupy a total of 172.7 acres of federal land administered by the Corps. Staff has prepared a multi-project environmental assessment (EA) that analyzes the potential environmental effects of constructing and operating the four projects. Based on staff’s analysis VerDate Sep<11>2014 18:31 Oct 05, 2015 Jkt 238001 with appropriate environmental protection measures, constructing and operating the projects would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll-free at 1–866–208–3676, or for TTY, 202–502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to these or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, 202–502–8659. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include: ‘‘Arkabutla Lake Hydroelectric Project No. 13704– 002, Sardis Lake Hydroelectric Project No. 13701–002, Enid Lake Hydroelectric Project No. 13703–002, and Grenada PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 [Project [Project [Project [Project No. No. No. No. 13704–002] 13701–002] 13703–002] 13702–002] Lake Hydroelectric Project No. 13702– 002’’ as appropriate, on the first page of any comments. For further information, contact Jeanne Edwards at 202–502–6181 or by email at jeanne.edwards@ferc.gov. Dated: September 30, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–25384 Filed 10–5–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [OMB Control No. 9000–00XX; Docket No. 2015–0055; Sequence 49] Information Collection; Payment to Small Business Subcontractors Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Interim rule. AGENCIES: Under the provisions of the Paperwork Reduction Act, the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB), a request to review and approve a new information collection requirement regarding Payment of Subcontractors. DATES: Submit comments on or before December 7, 2015. ADDRESSES: Submit comments identified by Information Collection SUMMARY: E:\FR\FM\06OCN1.SGM 06OCN1

Agencies

[Federal Register Volume 80, Number 193 (Tuesday, October 6, 2015)]
[Notices]
[Page 60383]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25384]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13704-002; Project No. 13701-002, et. al.]


Notice of Availability of Environmental Assessment

 
----------------------------------------------------------------------------------------------------------------
 
----------------------------------------------------------------------------------------------------------------
Arkabutla Lake Hydroelectric Project.......................  [Project No. 13704-002]
Sardis Lake Hydroelectric Project..........................  [Project No. 13701-002]
Enid Lake Hydroelectric Project............................  [Project No. 13703-002]
Grenada Lake Hydroelectric Project.........................  [Project No. 13702-002]
----------------------------------------------------------------------------------------------------------------

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission (Commission or FERC) 
regulations, 18 Code of Federal Regulations part 380, the Office of 
Energy Projects has reviewed applications for original licenses for the 
Arkabutla Lake Hydroelectric Project (FERC Project No. 13704-002), 
Sardis Lake Hydroelectric Project (FERC Project No. 13701-002), Enid 
Lake Hydroelectric Project (FERC Project No. 13703-002), and Grenada 
Lake Hydroelectric Project (FERC Project No. 13702-002). The proposed 
projects would be constructed at the U.S. Army Corps of Engineers' 
(Corps') existing Arkabutla, Sardis, Enid, and Grenada dams located 
within the Yazoo River Basin in Mississippi. The Arkabutla Lake 
Hydroelectric Project would be near the town of Hernando, Mississippi, 
in Tate and DeSoto Counties on the Coldwater River at river mile (RM) 
86. The Sardis Lake Hydroelectric Project would be located near the 
town of Sardis, Mississippi, in Panola County on the Little 
Tallahatchie River at RM 69. The Enid Lake Hydroelectric Project would 
be located near the town of Enid, Mississippi, in Yalobusha County on 
the Yocona River at RM 14.5. The Grenada Lake Hydroelectric Project 
would be located near the town of Grenada, Mississippi, in Grenada 
County on the Yalobusha River at RM 47.3. The projects would occupy a 
total of 172.7 acres of federal land administered by the Corps.
    Staff has prepared a multi-project environmental assessment (EA) 
that analyzes the potential environmental effects of constructing and 
operating the four projects. Based on staff's analysis with appropriate 
environmental protection measures, constructing and operating the 
projects would not constitute a major federal action that would 
significantly affect the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
www.ferc.gov using the ``eLibrary'' link. Enter the docket number, 
excluding the last three digits, in the docket number field to access 
the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to these or other pending projects. For assistance, contact 
FERC Online Support.
    Any comments should be filed within 30 days from the date of this 
notice. The Commission strongly encourages electronic filing. Please 
file comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, 202-502-8659. In lieu of electronic filing, 
please send a paper copy to: Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426. The first page 
of any filing should include: ``Arkabutla Lake Hydroelectric Project 
No. 13704-002, Sardis Lake Hydroelectric Project No. 13701-002, Enid 
Lake Hydroelectric Project No. 13703-002, and Grenada Lake 
Hydroelectric Project No. 13702-002'' as appropriate, on the first page 
of any comments.
    For further information, contact Jeanne Edwards at 202-502-6181 or 
by email at jeanne.edwards@ferc.gov.

    Dated: September 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25384 Filed 10-5-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.