Notice of Availability of Environmental Assessment, 60383 [2015-25384]
Download as PDF
60383
Federal Register / Vol. 80, No. 193 / Tuesday, October 6, 2015 / Notices
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the application.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any motion to intervene or
protest must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: September 29, 2015.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13704–002; Project No. 13701–
002, et. al.]
Notice of Availability of Environmental
Assessment
[FR Doc. 2015–25382 Filed 10–5–15; 8:45 am]
BILLING CODE 6717–01–P
tkelley on DSK3SPTVN1PROD with NOTICES
Arkabutla Lake Hydroelectric Project ...............................................................................................................................
Sardis Lake Hydroelectric Project ....................................................................................................................................
Enid Lake Hydroelectric Project .......................................................................................................................................
Grenada Lake Hydroelectric Project ................................................................................................................................
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations, 18 Code of Federal
Regulations part 380, the Office of
Energy Projects has reviewed
applications for original licenses for the
Arkabutla Lake Hydroelectric Project
(FERC Project No. 13704–002), Sardis
Lake Hydroelectric Project (FERC
Project No. 13701–002), Enid Lake
Hydroelectric Project (FERC Project No.
13703–002), and Grenada Lake
Hydroelectric Project (FERC Project No.
13702–002). The proposed projects
would be constructed at the U.S. Army
Corps of Engineers’ (Corps’) existing
Arkabutla, Sardis, Enid, and Grenada
dams located within the Yazoo River
Basin in Mississippi. The Arkabutla
Lake Hydroelectric Project would be
near the town of Hernando, Mississippi,
in Tate and DeSoto Counties on the
Coldwater River at river mile (RM) 86.
The Sardis Lake Hydroelectric Project
would be located near the town of
Sardis, Mississippi, in Panola County on
the Little Tallahatchie River at RM 69.
The Enid Lake Hydroelectric Project
would be located near the town of Enid,
Mississippi, in Yalobusha County on the
Yocona River at RM 14.5. The Grenada
Lake Hydroelectric Project would be
located near the town of Grenada,
Mississippi, in Grenada County on the
Yalobusha River at RM 47.3. The
projects would occupy a total of 172.7
acres of federal land administered by
the Corps.
Staff has prepared a multi-project
environmental assessment (EA) that
analyzes the potential environmental
effects of constructing and operating the
four projects. Based on staff’s analysis
VerDate Sep<11>2014
18:31 Oct 05, 2015
Jkt 238001
with appropriate environmental
protection measures, constructing and
operating the projects would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, 202–502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to these or other pending
projects. For assistance, contact FERC
Online Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659. In lieu of electronic
filing, please send a paper copy to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. The first page of
any filing should include: ‘‘Arkabutla
Lake Hydroelectric Project No. 13704–
002, Sardis Lake Hydroelectric Project
No. 13701–002, Enid Lake Hydroelectric
Project No. 13703–002, and Grenada
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
[Project
[Project
[Project
[Project
No.
No.
No.
No.
13704–002]
13701–002]
13703–002]
13702–002]
Lake Hydroelectric Project No. 13702–
002’’ as appropriate, on the first page of
any comments.
For further information, contact
Jeanne Edwards at 202–502–6181 or by
email at jeanne.edwards@ferc.gov.
Dated: September 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–25384 Filed 10–5–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[OMB Control No. 9000–00XX; Docket No.
2015–0055; Sequence 49]
Information Collection; Payment to
Small Business Subcontractors
Department of Defense (DoD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Interim rule.
AGENCIES:
Under the provisions of the
Paperwork Reduction Act, the
Regulatory Secretariat Division will be
submitting to the Office of Management
and Budget (OMB), a request to review
and approve a new information
collection requirement regarding
Payment of Subcontractors.
DATES: Submit comments on or before
December 7, 2015.
ADDRESSES: Submit comments
identified by Information Collection
SUMMARY:
E:\FR\FM\06OCN1.SGM
06OCN1
Agencies
[Federal Register Volume 80, Number 193 (Tuesday, October 6, 2015)]
[Notices]
[Page 60383]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25384]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13704-002; Project No. 13701-002, et. al.]
Notice of Availability of Environmental Assessment
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Arkabutla Lake Hydroelectric Project....................... [Project No. 13704-002]
Sardis Lake Hydroelectric Project.......................... [Project No. 13701-002]
Enid Lake Hydroelectric Project............................ [Project No. 13703-002]
Grenada Lake Hydroelectric Project......................... [Project No. 13702-002]
----------------------------------------------------------------------------------------------------------------
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission or FERC)
regulations, 18 Code of Federal Regulations part 380, the Office of
Energy Projects has reviewed applications for original licenses for the
Arkabutla Lake Hydroelectric Project (FERC Project No. 13704-002),
Sardis Lake Hydroelectric Project (FERC Project No. 13701-002), Enid
Lake Hydroelectric Project (FERC Project No. 13703-002), and Grenada
Lake Hydroelectric Project (FERC Project No. 13702-002). The proposed
projects would be constructed at the U.S. Army Corps of Engineers'
(Corps') existing Arkabutla, Sardis, Enid, and Grenada dams located
within the Yazoo River Basin in Mississippi. The Arkabutla Lake
Hydroelectric Project would be near the town of Hernando, Mississippi,
in Tate and DeSoto Counties on the Coldwater River at river mile (RM)
86. The Sardis Lake Hydroelectric Project would be located near the
town of Sardis, Mississippi, in Panola County on the Little
Tallahatchie River at RM 69. The Enid Lake Hydroelectric Project would
be located near the town of Enid, Mississippi, in Yalobusha County on
the Yocona River at RM 14.5. The Grenada Lake Hydroelectric Project
would be located near the town of Grenada, Mississippi, in Grenada
County on the Yalobusha River at RM 47.3. The projects would occupy a
total of 172.7 acres of federal land administered by the Corps.
Staff has prepared a multi-project environmental assessment (EA)
that analyzes the potential environmental effects of constructing and
operating the four projects. Based on staff's analysis with appropriate
environmental protection measures, constructing and operating the
projects would not constitute a major federal action that would
significantly affect the quality of the human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
www.ferc.gov using the ``eLibrary'' link. Enter the docket number,
excluding the last three digits, in the docket number field to access
the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
202-502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to these or other pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice. The Commission strongly encourages electronic filing. Please
file comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, 202-502-8659. In lieu of electronic filing,
please send a paper copy to: Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. The first page
of any filing should include: ``Arkabutla Lake Hydroelectric Project
No. 13704-002, Sardis Lake Hydroelectric Project No. 13701-002, Enid
Lake Hydroelectric Project No. 13703-002, and Grenada Lake
Hydroelectric Project No. 13702-002'' as appropriate, on the first page
of any comments.
For further information, contact Jeanne Edwards at 202-502-6181 or
by email at jeanne.edwards@ferc.gov.
Dated: September 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25384 Filed 10-5-15; 8:45 am]
BILLING CODE 6717-01-P