Salvatore & Michelle Shifrin; Mansfield Hollow Hydro, LLC; Notice of Transfer of Exemption, 59764 [2015-25010]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
59764
Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
VerDate Sep<11>2014
20:43 Oct 01, 2015
Jkt 238001
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant named in this public notice.
Dated: September 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12551–008]
Salvatore & Michelle Shifrin; Mansfield
Hollow Hydro, LLC; Notice of Transfer
of Exemption
1. By letter filed November 26, 2014,
and supplemented on July 23, 2015,
Mansfield Hollow Hydro, LLC
(Mansfield Hydro) informed the
Commission that the exemption from
licensing for the Mansfield Hollow
Hydroelectric Project No. 12551, had
been transferred to Mansfield Hydro.1
The project is located on the Natchaug
River in Tolland County, Connecticut.
2. The exemption was originally
issued to Salvatore and Michelle Shifrin
(Shifrins) on June 17, 2009.2 The
November 26, 2014 letter gave notice
that the Shifrins had leased the right to
operate the project to Mansfield Hydro.
The July 23, 2015 filing contained a
copy of the lease showing that all
project lands and facilities were also
leased to Mansfield Hydro, with
exception of the five 100-kilowatt
turbines, which Mansfield Hydro owns.
3. The transfer of an exemption does
not require Commission approval. Thus,
the Shifrins’ lease of project properties
and operating rights to Mansfield Hydro
effectively transferred the exemption to
Mansfield Hydro.
4. Mansfield Hydro is the exemptee of
the Mansfield Hollow Hydroelectric
Project No. 12551. The exemptee’s
1 O’Connell Energy Group made the filing on
behalf of Mansfield Hydro, which is owned by
O’Connell Development Group, Inc.
2 127 FERC ¶ 62,216, Order Granting Exemption
From Licensing (5 MW or Less) (2009).
Frm 00045
Fmt 4703
Sfmt 4703
Dated: September 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–25010 Filed 10–1–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5596–018]
[FR Doc. 2015–25011 Filed 10–1–15; 8:45 am]
PO 00000
contact is: Stephen Fisk, General
Manager, Mansfield Hollow Hydro, LLC,
c/o O’Connell Energy Group, 57 Suffolk
Street, Suite 200, Holyoke, MA 01040.
Town of Bedford, Virginia; Notice of
Application for Amendment and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Request to
permanently amend the minimum flow
requirement in bypass reach.
b. Project No.: 5596–018.
c. Date Filed: May 22, 2015.
d. Applicant: Town of Bedford,
Virginia.
e. Name of Project: Bedford
Hydroelectric Project.
f. Location: The project is located on
the James River in Bedford and Amherst
Counties, Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Charles P.
Kolakowski, Town Manager, Town of
Bedford, 215 East Main Street, Bedford,
VA 24523; telephone: (540) 587–6002.
i. FERC Contact: Kurt Powers,
telephone: (202) 502–8949, and email
address: kurt.powers@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 15
days from the issuance date of this
notice by the Commission.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 80, Number 191 (Friday, October 2, 2015)]
[Notices]
[Page 59764]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25010]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12551-008]
Salvatore & Michelle Shifrin; Mansfield Hollow Hydro, LLC; Notice
of Transfer of Exemption
1. By letter filed November 26, 2014, and supplemented on July 23,
2015, Mansfield Hollow Hydro, LLC (Mansfield Hydro) informed the
Commission that the exemption from licensing for the Mansfield Hollow
Hydroelectric Project No. 12551, had been transferred to Mansfield
Hydro.\1\ The project is located on the Natchaug River in Tolland
County, Connecticut.
---------------------------------------------------------------------------
\1\ O'Connell Energy Group made the filing on behalf of
Mansfield Hydro, which is owned by O'Connell Development Group, Inc.
---------------------------------------------------------------------------
2. The exemption was originally issued to Salvatore and Michelle
Shifrin (Shifrins) on June 17, 2009.\2\ The November 26, 2014 letter
gave notice that the Shifrins had leased the right to operate the
project to Mansfield Hydro. The July 23, 2015 filing contained a copy
of the lease showing that all project lands and facilities were also
leased to Mansfield Hydro, with exception of the five 100-kilowatt
turbines, which Mansfield Hydro owns.
---------------------------------------------------------------------------
\2\ 127 FERC ] 62,216, Order Granting Exemption From Licensing
(5 MW or Less) (2009).
---------------------------------------------------------------------------
3. The transfer of an exemption does not require Commission
approval. Thus, the Shifrins' lease of project properties and operating
rights to Mansfield Hydro effectively transferred the exemption to
Mansfield Hydro.
4. Mansfield Hydro is the exemptee of the Mansfield Hollow
Hydroelectric Project No. 12551. The exemptee's contact is: Stephen
Fisk, General Manager, Mansfield Hollow Hydro, LLC, c/o O'Connell
Energy Group, 57 Suffolk Street, Suite 200, Holyoke, MA 01040.
Dated: September 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-25010 Filed 10-1-15; 8:45 am]
BILLING CODE 6717-01-P