Salvatore & Michelle Shifrin; Mansfield Hollow Hydro, LLC; Notice of Transfer of Exemption, 59764 [2015-25010]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 59764 Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely VerDate Sep<11>2014 20:43 Oct 01, 2015 Jkt 238001 notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant named in this public notice. Dated: September 25, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12551–008] Salvatore & Michelle Shifrin; Mansfield Hollow Hydro, LLC; Notice of Transfer of Exemption 1. By letter filed November 26, 2014, and supplemented on July 23, 2015, Mansfield Hollow Hydro, LLC (Mansfield Hydro) informed the Commission that the exemption from licensing for the Mansfield Hollow Hydroelectric Project No. 12551, had been transferred to Mansfield Hydro.1 The project is located on the Natchaug River in Tolland County, Connecticut. 2. The exemption was originally issued to Salvatore and Michelle Shifrin (Shifrins) on June 17, 2009.2 The November 26, 2014 letter gave notice that the Shifrins had leased the right to operate the project to Mansfield Hydro. The July 23, 2015 filing contained a copy of the lease showing that all project lands and facilities were also leased to Mansfield Hydro, with exception of the five 100-kilowatt turbines, which Mansfield Hydro owns. 3. The transfer of an exemption does not require Commission approval. Thus, the Shifrins’ lease of project properties and operating rights to Mansfield Hydro effectively transferred the exemption to Mansfield Hydro. 4. Mansfield Hydro is the exemptee of the Mansfield Hollow Hydroelectric Project No. 12551. The exemptee’s 1 O’Connell Energy Group made the filing on behalf of Mansfield Hydro, which is owned by O’Connell Development Group, Inc. 2 127 FERC ¶ 62,216, Order Granting Exemption From Licensing (5 MW or Less) (2009). Frm 00045 Fmt 4703 Sfmt 4703 Dated: September 25, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–25010 Filed 10–1–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5596–018] [FR Doc. 2015–25011 Filed 10–1–15; 8:45 am] PO 00000 contact is: Stephen Fisk, General Manager, Mansfield Hollow Hydro, LLC, c/o O’Connell Energy Group, 57 Suffolk Street, Suite 200, Holyoke, MA 01040. Town of Bedford, Virginia; Notice of Application for Amendment and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Request to permanently amend the minimum flow requirement in bypass reach. b. Project No.: 5596–018. c. Date Filed: May 22, 2015. d. Applicant: Town of Bedford, Virginia. e. Name of Project: Bedford Hydroelectric Project. f. Location: The project is located on the James River in Bedford and Amherst Counties, Virginia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Charles P. Kolakowski, Town Manager, Town of Bedford, 215 East Main Street, Bedford, VA 24523; telephone: (540) 587–6002. i. FERC Contact: Kurt Powers, telephone: (202) 502–8949, and email address: kurt.powers@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 15 days from the issuance date of this notice by the Commission. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the E:\FR\FM\02OCN1.SGM 02OCN1

Agencies

[Federal Register Volume 80, Number 191 (Friday, October 2, 2015)]
[Notices]
[Page 59764]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25010]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12551-008]


Salvatore & Michelle Shifrin; Mansfield Hollow Hydro, LLC; Notice 
of Transfer of Exemption

    1. By letter filed November 26, 2014, and supplemented on July 23, 
2015, Mansfield Hollow Hydro, LLC (Mansfield Hydro) informed the 
Commission that the exemption from licensing for the Mansfield Hollow 
Hydroelectric Project No. 12551, had been transferred to Mansfield 
Hydro.\1\ The project is located on the Natchaug River in Tolland 
County, Connecticut.
---------------------------------------------------------------------------

    \1\ O'Connell Energy Group made the filing on behalf of 
Mansfield Hydro, which is owned by O'Connell Development Group, Inc.
---------------------------------------------------------------------------

    2. The exemption was originally issued to Salvatore and Michelle 
Shifrin (Shifrins) on June 17, 2009.\2\ The November 26, 2014 letter 
gave notice that the Shifrins had leased the right to operate the 
project to Mansfield Hydro. The July 23, 2015 filing contained a copy 
of the lease showing that all project lands and facilities were also 
leased to Mansfield Hydro, with exception of the five 100-kilowatt 
turbines, which Mansfield Hydro owns.
---------------------------------------------------------------------------

    \2\ 127 FERC ] 62,216, Order Granting Exemption From Licensing 
(5 MW or Less) (2009).
---------------------------------------------------------------------------

    3. The transfer of an exemption does not require Commission 
approval. Thus, the Shifrins' lease of project properties and operating 
rights to Mansfield Hydro effectively transferred the exemption to 
Mansfield Hydro.
    4. Mansfield Hydro is the exemptee of the Mansfield Hollow 
Hydroelectric Project No. 12551. The exemptee's contact is: Stephen 
Fisk, General Manager, Mansfield Hollow Hydro, LLC, c/o O'Connell 
Energy Group, 57 Suffolk Street, Suite 200, Holyoke, MA 01040.

    Dated: September 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-25010 Filed 10-1-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.