Actions Taken at September 10, 2015, Meeting, 58326-58327 [2015-24513]

Download as PDF 58326 Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices received will be posted without change; the Commission does not edit personal identifying information from submissions. You should submit only information that you wish to make available publicly. All submissions should refer to File Number SR–MIAX– 2015–57 and should be submitted on or before October 19, 2015. For the Commission, by the Division of Trading and Markets, pursuant to delegated authority.11 Robert W. Errett, Deputy Secretary. [FR Doc. 2015–24516 Filed 9–25–15; 8:45 am] BILLING CODE 8011–01–P SMALL BUSINESS ADMINISTRATION Notice of Surrender of License of Small Business Investment Company Pursuant to the authority granted to the United States Small Business Administration (‘‘SBA’’) under Section 309 of the Small Business Investment Act of 1958, as amended, and Section 107.1900 of the Small Business Administration Rules and Regulations, SBA by this notice declares null and void the license to function as a small business investment company under the Small Business Investment Company License No. 03/03–0240 issued to Innovation Ventures, L.P United States Small Business Administration. Dated: September 22, 2015. John R. Williams, Acting Associate Administrator, Office of Investment and Innovation. [FR Doc. 2015–24503 Filed 9–25–15; 8:45 am] BILLING CODE P SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at September 10, 2015, Meeting Susquehanna River Basin Commission. ACTION: Notice. AGENCY: As part of its regular business meeting held on September 10, 2015, in Binghamton, New York, the Commission took the following actions: (1) Approved or tabled the applications of certain water resources projects; (2) approved a request from Panda Power Funds for transfer of ownership of Hummel Station LLC; (3) accepted a settlement in lieu of penalty from tkelley on DSK3SPTVN1PROD with NOTICES SUMMARY: 11 17 CFR 200.30–3(a)(12). VerDate Sep<11>2014 17:19 Sep 25, 2015 Jkt 235001 Downs Racing L.P.; and (4) took additional actions, as set forth in the SUPPLEMENTARY INFORMATION below. DATES: September 10, 2015. ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street, Harrisburg, PA 17110–1788. FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436; email: joyler@ srbc.net. Regular mail inquiries may be sent to the above address. See also Commission Web site at www.srbc.net. SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects identified in the summary above and the listings below, the following items were also presented or acted upon at the business meeting: (1) Adoption of revisions to Resolution No. 2013–11; (2) release of proposed rulemaking to address shortcomings in the rules for transfer of approvals, create a category for minor modifications, establish a procedure for issuing general permits, and address other minor enhancements; (3) adoption of amendment of the Comprehensive Plan for the Water Resources of the Susquehanna River Basin; (5) approval of grants; (6) a report on delegated settlements with the following project sponsors, pursuant to SRBC Resolution 2014–15: Aqua Pennsylvania, Inc., in the amount of $6,000; Conyngham Borough Authority, in the amount of $5,000; Keister Miller Investments, LLC, in the amount of $2,000; Susquehanna Gas Field Services, LLC, in the amount of $2,500; and Wynding Brook, Inc. d/b/a Wynding Brook Golf Club, in the amount of $5,000; and (7) approval to extend the term of emergency certificates with Aqua Pennsylvania, Inc. to September 1, 2016, and with Furman Foods, Inc. to December 3, 2015. Compliance Matter The Commission approved a settlement in lieu of civil penalty for the following project: 1. Downs Racing L.P., Plains Township, Luzerne County, Pa.— $25,000. Project Applications Approved The Commission approved the following project applications: 1. Project Sponsor and Facility: Caernarvon Township Authority, Caernarvon Township, Berks County, Pa. Groundwater withdrawal of up to 0.673 mgd (30-day average) from Well 7. 2. Project Sponsor and Facility: Chetremon Golf Course, LLC, Burnside Township, Clearfield County, Pa. PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 Consumptive water use of up to 0.200 mgd (peak day). 3. Project Sponsor and Facility: Chetremon Golf Course, LLC (Irrigation Storage Pond), Burnside Township, Clearfield County, Pa. Surface water withdrawal of up to 0.200 mgd (peak day). 4. Project Sponsor and Facility: Chief Oil & Gas LLC (Loyalsock Creek), Forksville Borough, Sullivan County, Pa. Surface water withdrawal of up to 1.500 mgd (peak day). 5. Project Sponsor and Facility: JELD– WEN, inc. Fiber Division—PA, Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 0.252 mgd (30-day average) from Well 1. 6. Project Sponsor and Facility: JELD– WEN, inc. Fiber Division—PA, Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 0.252 mgd (30-day average) from Well 4. 7. Project Sponsor and Facility: JELD– WEN, inc. Fiber Division—PA, Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 0.323 mgd (30-day average) from Well 5. 8. Project Sponsor and Facility: JELD– WEN, inc. Fiber Division—PA, Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 0.323 mgd (30-day average) from Well 6. 9. Project Sponsor and Facility: JELD– WEN, inc. Fiber Division—PA, Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 0.345 mgd (30-day average) from Well 7. 10. Project Sponsor and Facility: JELD–WEN, inc. Fiber Division—PA, Wysox Township, Bradford County, Pa. Consumptive water use of up to 0.499 mgd (peak day). 11. Project Sponsor and Facility: Keister Miller Investments, LLC (West Branch Susquehanna River), Mahaffey Borough, Clearfield County, Pa. Surface water withdrawal of up to 1.000 mgd (peak day). 12. Project Sponsor and Facility: Lycoming County Water and Sewer Authority, Fairfield Township, Lycoming County, Pa. Groundwater withdrawal of up to 0.180 mgd (30-day average) from Production Well 3. 13. Project Sponsor and Facility: Moxie Freedom LLC, Salem Township, Luzerne County, Pa. Consumptive water use of up to 0.092 mgd (peak day). 14. Project Sponsor and Facility: Moxie Freedom LLC, Salem Township, Luzerne County, Pa. Groundwater withdrawal of up to 0.062 mgd (30-day average) from Production Well 1. 15. Project Sponsor and Facility: Seneca Resources Corporation (Marsh Creek), Delmar Township, Tioga County, Pa. Renewal of surface water E:\FR\FM\28SEN1.SGM 28SEN1 Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices tkelley on DSK3SPTVN1PROD with NOTICES withdrawal of up to 0.499 mgd (peak day) (Docket No. 20110907). 16. Project Sponsor and Facility: Shrewsbury Borough, York County, Pa. Renewal and modification to increase groundwater withdrawal by an additional 0.024 mgd (30-day average), for a total of up to 0.089 mgd (30-day average) from the Blouse Well (Docket No. 19820103). 17. Project Sponsor and Facility: Shrewsbury Borough, York County, Pa. Renewal of groundwater withdrawal of up to 0.099 mgd (30-day average) from the Smith Well (Docket No. 19811203). 18. Project Sponsor and Facility: Talisman Energy USA Inc. (Wappasening Creek), Windham Township, Bradford County, Pa. Renewal of surface water withdrawal of up to 1.000 mgd (peak day) (Docket No. 20110621). 19. Project Sponsor: UGI Development Company. Project Facility: Hunlock Creek Energy Center, Hunlock Township, Luzerne County, Pa. Modification to increase consumptive water use by an additional 1.526 mgd (peak day), for a total of up to 2.396 mgd (peak day) (Docket No. 20090916). 20. Project Sponsor and Facility: XTO Energy, Inc. (West Branch Susquehanna River), Chapman Township, Clinton County, Pa. Renewal of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 20110911). Project Applications Tabled The Commission tabled action on the following project applications: 1. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, Pa. Application for renewal of groundwater withdrawal of up to 0.320 mgd (30-day average) from Well 1 (Docket No. 19850901). 2. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, Pa. Application for renewal of groundwater withdrawal of up to 0.190 mgd (30-day average) from Well 4 (Docket No. 19850901). 3. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, Pa. Application for renewal of groundwater withdrawal of up to 0.090 mgd (30-day average) from Well 7 (Docket No. 19850901). 4. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Cresson Borough, Cambria County, Pa. Application for groundwater withdrawal from Argyle Stone Bridge VerDate Sep<11>2014 17:19 Sep 25, 2015 Jkt 235001 Well for inclusion in treatment of up to 6.300 mgd (30-day average) from four sources. 5. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Cresson Township, Cambria County, Pa. Application for groundwater withdrawal from Cresson No. 9 Well for inclusion in treatment of up to 6.300 mgd (30-day average) from four sources. 6. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria County, Pa. Application for groundwater withdrawal from Gallitzin Shaft Well 2A (Gallitzin Shaft #2) for inclusion in treatment of up to 6.300 mgd (30-day average) from four sources. 7. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria County, Pa. Application for groundwater withdrawal from Gallitzin Shaft Well 2B (Gallitzin Shaft #1) for inclusion in treatment of up to 6.300 mgd (30-day average) from four sources. 8. Project Sponsor and Facility: SWN Production Company, LLC (Tioga River), Hamilton Township, Tioga County, Pa. Application for surface water withdrawal of up to 2.000 mgd (peak day). Request for Conditional Transfer Approved The Commission approved the following request for conditional transfer: 1. Panda Power Funds request for transfer of ownership of Hummel Station LLC (Docket Nos. 20081222 and 20081222–2). Transferred dockets will include modification of conditions requiring mitigation of all consumptively used water. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: September 22, 2015. Stephanie L. Richardson, Secretary to the Commission. [FR Doc. 2015–24513 Filed 9–25–15; 8:45 am] BILLING CODE 7040–01–P PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 58327 DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. AGENCY: The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the United States (US) 101 Express Lanes Project from Post Miles 16.00 to 52.55 on US 101, and Post Miles 23.0 to 24.1 on State Route 85 in the County of Santa Clara, State of California. Those actions grant licenses, permits, and approvals for the project. DATES: By this notice, the FHWA, on behalf of Caltrans, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before February 25, 2016. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: For Caltrans: Cristin Hallissy, Branch Chief, Environmental Analysis Branch, California Department of Transportation, District 4, 111 Grand Avenue, Oakland, CA 94612; telephone 510–622–8717; email cristin.hallissy@ dot.ca.gov. Normal business hours for the Environmental Analysis Branch are 8:30 a.m. to 5:00 p.m. (Pacific Time). SUPPLEMENTARY INFORMATION: Effective July 1, 2007, the Federal Highway Administration (FHWA) assigned, and the California Department of Transportation (Caltrans) assumed, environmental responsibilities for this project pursuant to 23 U.S.C. 327. Notice is hereby given that the Caltrans has taken final agency actions subject to 23 U.S.C. 139(l)(1) by issuing licenses, permits, and approvals for the following highway project in the State of California: The US 101 Express Lanes Project would convert the existing northbound and southbound HighOccupancy Vehicle (HOV) lanes on US 101 to express lanes and add a second express lane in both directions between Cochrane Road in Morgan Hill to State Route 85 in San Jose, and between SUMMARY: E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 80, Number 187 (Monday, September 28, 2015)]
[Notices]
[Pages 58326-58327]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24513]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Actions Taken at September 10, 2015, Meeting

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: As part of its regular business meeting held on September 10, 
2015, in Binghamton, New York, the Commission took the following 
actions: (1) Approved or tabled the applications of certain water 
resources projects; (2) approved a request from Panda Power Funds for 
transfer of ownership of Hummel Station LLC; (3) accepted a settlement 
in lieu of penalty from Downs Racing L.P.; and (4) took additional 
actions, as set forth in the SUPPLEMENTARY INFORMATION below.

DATES: September 10, 2015.

ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street, 
Harrisburg, PA 17110-1788.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: 
joyler@srbc.net. Regular mail inquiries may be sent to the above 
address. See also Commission Web site at www.srbc.net.

SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects 
identified in the summary above and the listings below, the following 
items were also presented or acted upon at the business meeting: (1) 
Adoption of revisions to Resolution No. 2013-11; (2) release of 
proposed rulemaking to address shortcomings in the rules for transfer 
of approvals, create a category for minor modifications, establish a 
procedure for issuing general permits, and address other minor 
enhancements; (3) adoption of amendment of the Comprehensive Plan for 
the Water Resources of the Susquehanna River Basin; (5) approval of 
grants; (6) a report on delegated settlements with the following 
project sponsors, pursuant to SRBC Resolution 2014-15: Aqua 
Pennsylvania, Inc., in the amount of $6,000; Conyngham Borough 
Authority, in the amount of $5,000; Keister Miller Investments, LLC, in 
the amount of $2,000; Susquehanna Gas Field Services, LLC, in the 
amount of $2,500; and Wynding Brook, Inc. d/b/a Wynding Brook Golf 
Club, in the amount of $5,000; and (7) approval to extend the term of 
emergency certificates with Aqua Pennsylvania, Inc. to September 1, 
2016, and with Furman Foods, Inc. to December 3, 2015.

Compliance Matter

    The Commission approved a settlement in lieu of civil penalty for 
the following project:
    1. Downs Racing L.P., Plains Township, Luzerne County, Pa.--
$25,000.

Project Applications Approved

    The Commission approved the following project applications:
    1. Project Sponsor and Facility: Caernarvon Township Authority, 
Caernarvon Township, Berks County, Pa. Groundwater withdrawal of up to 
0.673 mgd (30-day average) from Well 7.
    2. Project Sponsor and Facility: Chetremon Golf Course, LLC, 
Burnside Township, Clearfield County, Pa. Consumptive water use of up 
to 0.200 mgd (peak day).
    3. Project Sponsor and Facility: Chetremon Golf Course, LLC 
(Irrigation Storage Pond), Burnside Township, Clearfield County, Pa. 
Surface water withdrawal of up to 0.200 mgd (peak day).
    4. Project Sponsor and Facility: Chief Oil & Gas LLC (Loyalsock 
Creek), Forksville Borough, Sullivan County, Pa. Surface water 
withdrawal of up to 1.500 mgd (peak day).
    5. Project Sponsor and Facility: JELD-WEN, inc. Fiber Division--PA, 
Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 
0.252 mgd (30-day average) from Well 1.
    6. Project Sponsor and Facility: JELD-WEN, inc. Fiber Division--PA, 
Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 
0.252 mgd (30-day average) from Well 4.
    7. Project Sponsor and Facility: JELD-WEN, inc. Fiber Division--PA, 
Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 
0.323 mgd (30-day average) from Well 5.
    8. Project Sponsor and Facility: JELD-WEN, inc. Fiber Division--PA, 
Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 
0.323 mgd (30-day average) from Well 6.
    9. Project Sponsor and Facility: JELD-WEN, inc. Fiber Division--PA, 
Wysox Township, Bradford County, Pa. Groundwater withdrawal of up to 
0.345 mgd (30-day average) from Well 7.
    10. Project Sponsor and Facility: JELD-WEN, inc. Fiber Division--
PA, Wysox Township, Bradford County, Pa. Consumptive water use of up to 
0.499 mgd (peak day).
    11. Project Sponsor and Facility: Keister Miller Investments, LLC 
(West Branch Susquehanna River), Mahaffey Borough, Clearfield County, 
Pa. Surface water withdrawal of up to 1.000 mgd (peak day).
    12. Project Sponsor and Facility: Lycoming County Water and Sewer 
Authority, Fairfield Township, Lycoming County, Pa. Groundwater 
withdrawal of up to 0.180 mgd (30-day average) from Production Well 3.
    13. Project Sponsor and Facility: Moxie Freedom LLC, Salem 
Township, Luzerne County, Pa. Consumptive water use of up to 0.092 mgd 
(peak day).
    14. Project Sponsor and Facility: Moxie Freedom LLC, Salem 
Township, Luzerne County, Pa. Groundwater withdrawal of up to 0.062 mgd 
(30-day average) from Production Well 1.
    15. Project Sponsor and Facility: Seneca Resources Corporation 
(Marsh Creek), Delmar Township, Tioga County, Pa. Renewal of surface 
water

[[Page 58327]]

withdrawal of up to 0.499 mgd (peak day) (Docket No. 20110907).
    16. Project Sponsor and Facility: Shrewsbury Borough, York County, 
Pa. Renewal and modification to increase groundwater withdrawal by an 
additional 0.024 mgd (30-day average), for a total of up to 0.089 mgd 
(30-day average) from the Blouse Well (Docket No. 19820103).
    17. Project Sponsor and Facility: Shrewsbury Borough, York County, 
Pa. Renewal of groundwater withdrawal of up to 0.099 mgd (30-day 
average) from the Smith Well (Docket No. 19811203).
    18. Project Sponsor and Facility: Talisman Energy USA Inc. 
(Wappasening Creek), Windham Township, Bradford County, Pa. Renewal of 
surface water withdrawal of up to 1.000 mgd (peak day) (Docket No. 
20110621).
    19. Project Sponsor: UGI Development Company. Project Facility: 
Hunlock Creek Energy Center, Hunlock Township, Luzerne County, Pa. 
Modification to increase consumptive water use by an additional 1.526 
mgd (peak day), for a total of up to 2.396 mgd (peak day) (Docket No. 
20090916).
    20. Project Sponsor and Facility: XTO Energy, Inc. (West Branch 
Susquehanna River), Chapman Township, Clinton County, Pa. Renewal of 
surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 
20110911).

Project Applications Tabled

    The Commission tabled action on the following project applications:
    1. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.320 mgd (30-day average) from Well 1 
(Docket No. 19850901).
    2. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.190 mgd (30-day average) from Well 4 
(Docket No. 19850901).
    3. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.090 mgd (30-day average) from Well 7 
(Docket No. 19850901).
    4. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Cresson Borough, Cambria County, 
Pa. Application for groundwater withdrawal from Argyle Stone Bridge 
Well for inclusion in treatment of up to 6.300 mgd (30-day average) 
from four sources.
    5. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Cresson Township, Cambria 
County, Pa. Application for groundwater withdrawal from Cresson No. 9 
Well for inclusion in treatment of up to 6.300 mgd (30-day average) 
from four sources.
    6. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria 
County, Pa. Application for groundwater withdrawal from Gallitzin Shaft 
Well 2A (Gallitzin Shaft #2) for inclusion in treatment of up to 6.300 
mgd (30-day average) from four sources.
    7. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria 
County, Pa. Application for groundwater withdrawal from Gallitzin Shaft 
Well 2B (Gallitzin Shaft #1) for inclusion in treatment of up to 6.300 
mgd (30-day average) from four sources.
    8. Project Sponsor and Facility: SWN Production Company, LLC (Tioga 
River), Hamilton Township, Tioga County, Pa. Application for surface 
water withdrawal of up to 2.000 mgd (peak day).

Request for Conditional Transfer Approved

    The Commission approved the following request for conditional 
transfer:
    1. Panda Power Funds request for transfer of ownership of Hummel 
Station LLC (Docket Nos. 20081222 and 20081222-2). Transferred dockets 
will include modification of conditions requiring mitigation of all 
consumptively used water.

    Authority:  Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: September 22, 2015.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2015-24513 Filed 9-25-15; 8:45 am]
BILLING CODE 7040-01-P