Combined Notice of Filings #1, 57602-57603 [2015-24238]

Download as PDF 57602 Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: September 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–24243 Filed 9–23–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–569–008; ER13–712–008; ER10–1849–007; ER11–2037–007; ER12–2227– 007;ER10–1852–011; ER10–1887–007; ER10–1920– 009;ER10–1928–009; ER10–1952–007; ER12–1228– 009;ER10–1961–007; ER14–2707–004; ER10–2720– 009;ER11–4428–009; ER12–1880–008; ER12–895– 007;ER10–1971–021; ER14–2710–004; ER15–58–002;ER15– 30–002; ER14–2708–005; ER14–2709– 004;ER13–2474–003 Applicants: Blackwell Wind, LLC, Cimarron Wind Energy, LLC, Elk City Wind, LLC, Elk City II Wind, LLC, Ensign Wind, LLC Florida Power & Light Company, FPL Energy Cowboy Wind, LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, Gray County Wind Energy, LLC, High Majestic Wind II, LLC, High Majestic Wind Energy Center, LLC, Mammoth Plains Wind Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC, Minco Wind Interconnection Services, LLC, NextEra Energy Power Marketing, LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind Interconnection Services, LLC, Seiling Wind Interconnection Services, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Steel Flats Wind Project, LLC VerDate Sep<11>2014 16:45 Sep 23, 2015 Jkt 235001 Description: Notification of Change in Status of NextEra Resources Entities. Filed Date: 9/17/15. Accession Number: 20150917–5156. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER13–2073–002. Applicants: Source Power & Gas LLC. Description: Notification of Change in Status by Source Power & Gas LLC. Filed Date: 9/17/15. Accession Number: 20150917–5148. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER14–649–004. Applicants: Midcontinent Independent System Operator, Inc., Entergy Services, Inc. Description: Compliance filing: 2015– 09–17_Entergy Attachment O Compliance Filing ER13–948 to be effective 11/1/2015. Filed Date: 9/17/15. Accession Number: 20150917–5114. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–883–003. Applicants: Southern California Edison Company. Description: Tariff Amendment: Executed GIA and Executed Distrib Serv Agmt with San Gorgonio Westwinds II, LLC to be effective 1/20/2015. Filed Date: 9/18/15. Accession Number: 20150918–5003. Comments Due: 5 p.m. ET 10/9/15. Docket Numbers: ER15–2662–000. Applicants: PacifiCorp. Description: Section 205(d) Rate Filing: Dugway Non-Conforming SGIA to be effective 9/9/2015. Filed Date: 9/17/15. Accession Number: 20150917–5116. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2663–000. Applicants: Entergy Gulf States Louisiana, L.L.C. Description: Compliance filing: EGSL Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5119. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2664–000. Applicants: Entergy Louisiana, LLC. Description: Compliance filing: ELL Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5122. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2665–000. Applicants: Entergy Mississippi, Inc. Description: Compliance filing: EMI Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5123. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2666–000. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Applicants: Entergy New Orleans, Inc. Description: Compliance filing: ENOI Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5124. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2667–000. Applicants: Entergy Texas, Inc. Description: Compliance filing: ETI Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5125. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2668–000. Applicants: Land of the Sky MT, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Tariff, Blanket Approval and Waivers to be effective 10/1/2015. Filed Date: 9/17/15. Accession Number: 20150917–5144. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2669–000. Applicants: Southwest Power Pool, Inc. Description: Notice of Cancellation of Firm Point-To-Point Transmission Service Agreement No. 1487 of Southwest Power Pool, Inc. Filed Date: 9/18/15. Accession Number: 20150918–5054. Comments Due: 5 p.m. ET 10/9/15. Docket Numbers: ER15–2670–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) Rate Filing: 2015–09–18_SA 2698 OTPNorthern States Power Company 1st Rev GIA (J262/J263) to be effective 9/19/ 2015. Filed Date: 9/18/15. Accession Number: 20150918–5089. Comments Due: 5 p.m. ET 10/9/15. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES15–70–000. Applicants: Georgia Power Company. Description: Application of Georgia Power Company for authorization to issue securities. Filed Date: 9/17/15. Accession Number: 20150917–5147. Comments Due: 5 p.m. ET 10/8/15. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD15–7–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Interconnection Reliability Operations and Coordination Reliability Standards. E:\FR\FM\24SEN1.SGM 24SEN1 Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices Filed Date: 9/16/15. Accession Number: 20150916–5156. Comments Due: 5 p.m. ET 10/19/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–24238 Filed 9–23–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2960–005] tkelley on DSK3SPTVN1PROD with NOTICES City of Gonzales, Texas; Notice of Intent to File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests Type of Filing: Notice of Intent to File License Application for a New License and Commencing Pre-filing Process. Project No.: 2960–005. Dated Filed: July 24, 2015. Submitted By: City of Gonzales, Texas. Name of Project: Gonzales Project. Location: On the Guadalupe River, in Gonzales County, Texas. The project occupies no federal land. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. Potential Applicant Contact: Allen Barnes, City of Gonzales, P.O. Box 547, Gonzales, TX 78629. FERC Contact: Rachel McNamara at (202) 502–8340 or email at rachel.mcnamara@ferc.gov. Cooperating agencies: Federal, state, local, and tribal agencies with VerDate Sep<11>2014 16:45 Sep 23, 2015 Jkt 235001 jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See 94 FERC 61,076 (2001). With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402 and (b) the State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. With this notice, we are designating the City of Gonzales, Texas as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. The City of Gonzales, Texas filed with the Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18 CFR 5.6 of the Commission’s regulations. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. With this notice, we are soliciting comments on the PAD and Commission’s staff Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 57603 cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2960–005. All filings with the Commission must bear the appropriate heading: ‘‘Comments on Pre-Application Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by November 21, 2015. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: Daytime Scoping Meeting Date: Thursday, October 22, 2015. Time: 10:30 a.m. E:\FR\FM\24SEN1.SGM 24SEN1

Agencies

[Federal Register Volume 80, Number 185 (Thursday, September 24, 2015)]
[Notices]
[Pages 57602-57603]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24238]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-569-008; ER13-712-008; ER10-1849-007;
    ER11-2037-007; ER12-2227-007;ER10-1852-011;
    ER10-1887-007; ER10-1920-009;ER10-1928-009;
    ER10-1952-007; ER12-1228-009;ER10-1961-007;
    ER14-2707-004; ER10-2720-009;ER11-4428-009;
    ER12-1880-008; ER12-895-007;ER10-1971-021;
    ER14-2710-004; ER15-58-002;ER15-30-002;
    ER14-2708-005; ER14-2709-004;ER13-2474-003
    Applicants: Blackwell Wind, LLC, Cimarron Wind Energy, LLC, Elk 
City Wind, LLC, Elk City II Wind, LLC, Ensign Wind, LLC Florida Power & 
Light Company, FPL Energy Cowboy Wind, LLC, FPL Energy Oklahoma Wind, 
LLC, FPL Energy Sooner Wind, LLC, Gray County Wind Energy, LLC, High 
Majestic Wind II, LLC, High Majestic Wind Energy Center, LLC, Mammoth 
Plains Wind Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco 
Wind III, LLC, Minco Wind Interconnection Services, LLC, NextEra Energy 
Power Marketing, LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind 
Interconnection Services, LLC, Seiling Wind Interconnection Services, 
LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Steel Flats Wind Project, 
LLC
    Description: Notification of Change in Status of NextEra Resources 
Entities.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5156.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER13-2073-002.
    Applicants: Source Power & Gas LLC.
    Description: Notification of Change in Status by Source Power & Gas 
LLC.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5148.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER14-649-004.
    Applicants: Midcontinent Independent System Operator, Inc., Entergy 
Services, Inc.
    Description: Compliance filing: 2015-09-17_Entergy Attachment O 
Compliance Filing ER13-948 to be effective 11/1/2015.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5114.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-883-003.
    Applicants: Southern California Edison Company.
    Description: Tariff Amendment: Executed GIA and Executed Distrib 
Serv Agmt with San Gorgonio Westwinds II, LLC to be effective 1/20/
2015.
    Filed Date: 9/18/15.
    Accession Number: 20150918-5003.
    Comments Due: 5 p.m. ET 10/9/15.

    Docket Numbers: ER15-2662-000.
    Applicants: PacifiCorp.
    Description: Section 205(d) Rate Filing: Dugway Non-Conforming SGIA 
to be effective 9/9/2015.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5116.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2663-000.
    Applicants: Entergy Gulf States Louisiana, L.L.C.
    Description: Compliance filing: EGSL Compliance (ER14-73) 9-17-2015 
to be effective 12/19/2013.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5119.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2664-000.
    Applicants: Entergy Louisiana, LLC.
    Description: Compliance filing: ELL Compliance (ER14-73) 9-17-2015 
to be effective 12/19/2013.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5122.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2665-000.
    Applicants: Entergy Mississippi, Inc.
    Description: Compliance filing: EMI Compliance (ER14-73) 9-17-2015 
to be effective 12/19/2013.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5123.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2666-000.
    Applicants: Entergy New Orleans, Inc.
    Description: Compliance filing: ENOI Compliance (ER14-73) 9-17-2015 
to be effective 12/19/2013.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5124.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2667-000.
    Applicants: Entergy Texas, Inc.
    Description: Compliance filing: ETI Compliance (ER14-73) 9-17-2015 
to be effective 12/19/2013.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5125.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2668-000.
    Applicants: Land of the Sky MT, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Tariff, Blanket Approval and Waivers to be effective 10/1/2015.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5144.
    Comments Due: 5 p.m. ET 10/8/15.

    Docket Numbers: ER15-2669-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Notice of Cancellation of Firm Point-To-Point 
Transmission Service Agreement No. 1487 of Southwest Power Pool, Inc.
    Filed Date: 9/18/15.
    Accession Number: 20150918-5054.
    Comments Due: 5 p.m. ET 10/9/15.

    Docket Numbers: ER15-2670-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Section 205(d) Rate Filing: 2015-09-18_SA 2698 OTP-
Northern States Power Company 1st Rev GIA (J262/J263) to be effective 
9/19/2015.
    Filed Date: 9/18/15.
    Accession Number: 20150918-5089.
    Comments Due: 5 p.m. ET 10/9/15.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES15-70-000.
    Applicants: Georgia Power Company.
    Description: Application of Georgia Power Company for authorization 
to issue securities.
    Filed Date: 9/17/15.
    Accession Number: 20150917-5147.
    Comments Due: 5 p.m. ET 10/8/15.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RD15-7-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Petition of the North American Electric Reliability 
Corporation for Approval of Proposed Interconnection Reliability 
Operations and Coordination Reliability Standards.

[[Page 57603]]

    Filed Date: 9/16/15.
    Accession Number: 20150916-5156.
    Comments Due: 5 p.m. ET 10/19/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 18, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24238 Filed 9-23-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.