Clinton Power Station, Unit 1, 56498-56501 [2015-23632]
Download as PDF
56498
Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Notices
Place: National Science Foundation (NSF),
4201 Wilson Boulevard, Room 1235,
Arlington, VA 22230.
Note: CEOSE AC members will participate
virtually. If you are interested in attending
this meeting, you are required to attend in
person. To help facilitate your entry into the
building, please contact Victoria Fung
(vfung@nsf.gov) on or prior to October 13,
2015.
Type of Meeting: Open.
Contact Person: Dr. Bernice T. Anderson,
Senior Advisor and CEOSE Executive
Secretary, Office of Integrative Activities
(OIA), National Science Foundation, 4201
Wilson Boulevard, Arlington, VA 22230,
(703) 292–8040 (main), Email Address:
banderso@nsf.gov.
Minutes: Meeting minutes and other
information may be obtained from the CEOSE
Executive Secretary at the above address or
the Web site at https://www.nsf.gov/od/oia/
activities/ceose/index.jsp.
Purpose of Meeting: To study data,
programs, policies, and other information
pertinent to the National Science Foundation
and to provide advice and recommendations
concerning broadening participation in
science and engineering.
Agenda (Tentative): Please access CEOSE
Web site, https://www.nsf.gov/od/oia/
activities/ceose/index.jsp for final version.
Thursday, October 15, 2015
Opening Statement by the CEOSE Chair
Presentations and Discussions:
• Update of NSF Broadening Participation
Activities by the CEOSE Executive
Liaison
• Presentation of Inclusion across the
Nation of Communities of Learners that
have been Underrepresented for
Diversity in Engineering and Science
(NSF INCLUDES)
´
• Discussion with Dr. France Cordova,
Director and Dr. Richard Buckius, Chief
Operating Officer of the National Science
Foundation
• Reports of CEOSE Liaisons to NSF
Advisory Committees
• Updates by Federal Agency Liaisons
About Interagency Broadening
Participation Activities
• Presentation of NSF Evaluation and
Assessment Capability (EAC)
• Production of the 2015–2016 CEOSE
Biennial Report to Congress
Dated: September 14, 2015.
Crystal Robinson,
Committee Management Officer.
[FR Doc. 2015–23437 Filed 9–17–15; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–461; NRC–2015–0221]
Clinton Power Station, Unit 1
Nuclear Regulatory
Commission.
AGENCY:
VerDate Sep<11>2014
18:47 Sep 17, 2015
Jkt 235001
License amendment application;
opportunity to request a hearing and to
petition for leave to intervene.
ACTION:
The U.S. Nuclear Regulatory
Commission (NRC) has received an
application dated September 5, 2015,
from Exelon Generation Company, LLC,
for amendment of Clinton Power
Station, Unit 1. The application
proposes a one-time extension from 72
hours to 7 days of the technical
specification (TS) completion time [CT]
associated with the Division 2 (Div. 2)
Shutdown Service Water (SX)
Subsystem in support maintenance
activities.
SUMMARY:
Submit comments by October 19,
2015. Requests for a hearing or petition
for leave to intervene must be filed by
November 17, 2015.
ADDRESSES: Please refer to Docket ID
NRC–2015–0221 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0221. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Eva
A. Brown, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–2315; email:
Eva.Brown@nrc.gov.
DATES:
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering issuance of an
amendment to Facility Operating
License No. NPF–62, issued to Clinton
Power Station, Unit 1, located in DeWitt
County, Illinois. The proposed
amendment proposes a one-time
extension from 72 hours to 7 days of the
technical specification (TS) completion
time [CT] associated with the Division
2 (Div. 2) Shutdown Service Water (SX)
Subsystem in support maintenance
activities.
Before any issuance of the proposed
license amendment, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and NRC’s regulations.
The NRC has made a proposed
determination that the license
amendment request involves no
significant hazards consideration. Under
the NRC’s regulations in § 50.92 of Title
10 of the Code of Federal Regulations
(10 CFR), this means that operation of
the facility in accordance with the
proposed amendment would not (1)
involve a significant increase in the
probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed one-time change to the CT
for CPS TS 3.7.1 will not increase the
probability of an accident since it will only
extend the time period that one SX
subsystem can be out of service. The
extension of the time duration that one SX
subsystem is out of service has no direct
physical impact on the plant. The proposed
inoperable SX subsystem is normally in a
standby mode while CPS is in Mode 1, 2, or
3 and is not directly supporting plant
operation. Therefore, it can have no impact
on the plant that would make an accident
more likely to occur due to its inoperability.
The proposed change does not adversely
affect accident initiators or precursors, nor
does it alter the design assumptions,
conditions, or configuration of the facility or
the manner in which the plant is operated
and maintained.
The previously analyzed accidents are
initiated by the failure of plant structures,
systems, or components. The SX system is
not considered an initiator for any of these
previously analyzed events. The proposed
E:\FR\FM\18SEN1.SGM
18SEN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Notices
change does not have a detrimental impact
on the integrity of any plant structure,
system, or component that initiates an
analyzed event. No active or passive failure
mechanisms that could lead to an accident
are affected. The proposed change will not
alter the operation of, or otherwise increase
the failure probability of any plant
equipment that initiates an analyzed
accident. Therefore, the proposed change
does not involve a significant increase in the
probability of an accident previously
evaluated.
The proposed change does not alter or
prevent the ability of structures, systems, and
components (SSCs) from performing their
intended function to mitigate the
consequences of an initiating event within
the assumed acceptance limits. The proposed
change does not require any physical change
to any plant SSCs nor does it require any
change in systems or plant operations. The
proposed onetime increase in the CT is
consistent with the philosophy of the current
TS LCO which allows one SX subsystem to
be inoperable for 72 hours. This change only
extends the 72 hour CT to 7 days which has
been shown to be acceptable from a risk
perspective. The minimum equipment
required to mitigate the consequences of an
accident and/or safely shut down the plant
will be Operable or available during the
extended CT. The proposed change is
consistent with the safety analysis
assumptions and resultant consequences.
Based on the above, the proposed change
does not involve a significant increase in the
consequences of an accident previously
evaluated. Therefore, the proposed change
does not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes do not involve the
use or installation of new equipment and the
currently installed equipment will not be
operated in a new or different manner. No
new or different system interactions are
created and no new processes are introduced.
The proposed changes will not introduce any
new failure mechanisms, malfunctions, or
accident initiators not already considered in
the design and licensing bases. Based on this
evaluation, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change does not alter any
existing setpoints at which protective actions
are initiated and no new setpoints or
protective actions are introduced. The design
and operation of the SX system remains
unchanged. The risk associated with the
proposed increase in the time an SX pump
is allowed to be inoperable was evaluated
VerDate Sep<11>2014
18:47 Sep 17, 2015
Jkt 235001
using the risk-informed processes described
in RG 1.174 and RG 1.177. The risk was
shown to be acceptable. Based on this
evaluation, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the license
amendment request involves a No
Significant Hazards Consideration.
The NRC is seeking public comments
on this proposed determination that the
license amendment request involves no
significant hazards consideration. Any
comments received within 30 days after
the date of publication of this notice
will be considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day notice period if the Commission
concludes the amendment involves no
significant hazards consideration. In
addition, the Commission may issue the
amendment prior to the expiration of
the 30-day comment period should
circumstances change during the 30-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. Should the Commission take
action prior to the expiration of either
the comment period or the notice
period, it will publish in the Federal
Register a notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
II. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this Federal Register
notice, any person whose interest may
be affected by this proceeding and who
desires to participate as a party in the
proceeding must file a written request
for hearing or a petition for leave to
intervene specifying the contentions
which the person seeks to have litigated
in the hearing with respect to the
license amendment request. Requests
for hearing and petitions for leave to
intervene shall be filed in accordance
with the NRC’s ‘‘Agency Rules of
Practice and Procedure’’ in 10 CFR part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
56499
available at the NRC’s PDR. The NRC’s
regulations are accessible electronically
from the NRC Library on the NRC’s Web
site at https://www.nrc.gov/reading-rm/
doc-collections/cfr/.
As required by 10 CFR 2.309, a
request for hearing or petition for leave
to intervene must set forth with
particularity the interest of the
petitioner in the proceeding and how
that interest may be affected by the
results of the proceeding. The hearing
request or petition must specifically
explain the reasons why intervention
should be permitted, with particular
reference to the following general
requirements: (1) The name, address,
and telephone number of the requestor
or petitioner; (2) the nature of the
requestor’s/petitioner’s right under the
Act to be made a party to the
proceeding; (3) the nature and extent of
the requestor’s/petitioner’s property,
financial, or other interest in the
proceeding; and (4) the possible effect of
any decision or order which may be
entered in the proceeding on the
requestor’s/petitioner’s interest. The
hearing request or petition must also
include the specific contentions that the
requestor/petitioner seeks to have
litigated at the proceeding.
For each contention, the requestor/
petitioner must provide a specific
statement of the issue of law or fact to
be raised or controverted, as well as a
brief explanation of the basis for the
contention. Additionally, the requestor/
petitioner must demonstrate that the
issue raised by each contention is
within the scope of the proceeding and
is material to the findings that the NRC
must make to support the granting of a
license amendment in response to the
application. The hearing request or
petition must also include a concise
statement of the alleged facts or expert
opinion that support the contention and
on which the requestor/petitioner
intends to rely at the hearing, together
with references to those specific sources
and documents. The hearing request or
petition must provide sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact, including
references to specific portions of the
application for amendment that the
petitioner disputes and the supporting
reasons for each dispute. If the
requestor/petitioner believes that the
application for amendment fails to
contain information on a relevant matter
as required by law, the requestor/
petitioner must identify each failure and
the supporting reasons for the
requestor’s/petitioner’s belief. Each
contention must be one which, if
proven, would entitle the requestor/
E:\FR\FM\18SEN1.SGM
18SEN1
56500
Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
petitioner to relief. A requestor/
petitioner who does not satisfy these
requirements for at least one contention
will not be permitted to participate as a
party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing with respect to resolution of
that person’s admitted contentions,
including the opportunity to present
evidence and to submit a crossexamination plan for cross-examination
of witnesses, consistent with NRC
regulations, policies, and procedures.
The Atomic Safety and Licensing Board
will set the time and place for any
prehearing conferences and evidentiary
hearings, and the appropriate notices
will be provided.
Hearing requests or petitions for leave
to intervene must be filed no later than
60 days from the date of publication of
this notice. Requests for hearing,
petitions for leave to intervene, and
motions for leave to file new or
amended contentions that are filed after
the 60-day deadline will not be
entertained absent a determination by
the presiding officer that the filing
demonstrates good cause by satisfying
the three factors in 10 CFR
2.309(c)(1)(i)–(iii).
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment unless the Commission
finds an imminent danger to the health
or safety of the public, in which case it
will issue an appropriate order or rule
under 10 CFR part 2.
III. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
VerDate Sep<11>2014
18:47 Sep 17, 2015
Jkt 235001
under 10 CFR 2.315(c), must be filed in
accordance with the NRC’s E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC’s public Web site
at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Meta System Help Desk through
the ‘‘Contact Us’’ link located on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
E:\FR\FM\18SEN1.SGM
18SEN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Notices
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, in some
instances, a request to intervene will
require including information on local
residence in order to demonstrate a
proximity assertion of interest in the
proceeding. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice.
Requests for hearing, petitions for leave
to intervene, and motions for leave to
file new or amended contentions that
are filed after the 60-day deadline will
not be entertained absent a
determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i)–(iii).
For further details with respect to this
action, see the application for license
amendment dated September 11, 2015.
Attorney for licensee: Bradley J.
Fewell, Associate General Counsel,
Exelon Nuclear, 4300 Winfield Road,
Warrenville, IL 60555.
NRC Branch Chief: Travis L. Tate.
Dated at Rockville, Maryland, this 15th day
of September 2015.
VerDate Sep<11>2014
18:47 Sep 17, 2015
Jkt 235001
For the Nuclear Regulatory Commission.
Eva A. Brown,
Senior Project Manager, Plant Licensing III–
2 and Planning and Analysis Branch, Division
of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. 2015–23632 Filed 9–17–15; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 63–001–HLW; NRC–2015–0051]
Department of Energy; Yucca
Mountain, Nye County, Nevada;
Correction
Nuclear Regulatory
Commission.
ACTION: Draft supplement to
environmental impact statements;
extension of comment period, public
meeting, and correction.
AGENCY:
On August 21, 2015, the U.S.
Nuclear Regulatory Commission (NRC)
requested public comment on NUREG–
2184, the NRC staff’s draft ‘‘Supplement
to the U.S. Department of Energy’s
Environmental Impact Statement for a
Geologic Repository for the Disposal of
Spent Nuclear Fuel and High-Level
Radioactive Waste at Yucca Mountain,
Nye County, Nevada’’ (draft
supplement). The public comment
period was originally scheduled to close
on October 20, 2015. The NRC staff has
decided to extend the public comment
period to allow more time for members
of the public to develop and submit
their comments. The NRC is also
correcting its August 21, 2015, notice to
correct a meeting date and Web site
link.
DATES: The due date for comments on
the draft supplement is extended.
Comments should be filed no later than
November 20, 2015. Comments received
after this date will be considered, if it
is practical to do so, but the
Commission is able to ensure
consideration only for comments
received on or before this date.
The correction is effective September
18, 2015.
The NRC will hold a public meeting
via teleconference to accept comments
on the draft supplement on November
12, 2015, in addition to the
teleconference being held on October
15, 2015. For additional information
about this public meeting, see Section
III, ‘‘Public Meetings,’’ of this document.
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
SUMMARY:
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
56501
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0051. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Christine Pineda, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington DC 20555–0001; telephone:
301–415–6789; email: YMEIS_
Supplement@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2015–
0051 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0051.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in the SUPPLEMENTARY
INFORMATION section.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
E:\FR\FM\18SEN1.SGM
18SEN1
Agencies
[Federal Register Volume 80, Number 181 (Friday, September 18, 2015)]
[Notices]
[Pages 56498-56501]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-23632]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-461; NRC-2015-0221]
Clinton Power Station, Unit 1
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to request a hearing
and to petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has received an
application dated September 5, 2015, from Exelon Generation Company,
LLC, for amendment of Clinton Power Station, Unit 1. The application
proposes a one-time extension from 72 hours to 7 days of the technical
specification (TS) completion time [CT] associated with the Division 2
(Div. 2) Shutdown Service Water (SX) Subsystem in support maintenance
activities.
DATES: Submit comments by October 19, 2015. Requests for a hearing or
petition for leave to intervene must be filed by November 17, 2015.
ADDRESSES: Please refer to Docket ID NRC-2015-0221 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and
search for Docket ID NRC-2015-0221. Address questions about NRC dockets
to Carol Gallagher; telephone: 301-415-3463; email:
Carol.Gallagher@nrc.gov. For technical questions, contact the
individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced in this document
(if that document is available in ADAMS) is provided the first time
that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Eva A. Brown, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-2315; email: Eva.Brown@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering issuance of an amendment to Facility
Operating License No. NPF-62, issued to Clinton Power Station, Unit 1,
located in DeWitt County, Illinois. The proposed amendment proposes a
one-time extension from 72 hours to 7 days of the technical
specification (TS) completion time [CT] associated with the Division 2
(Div. 2) Shutdown Service Water (SX) Subsystem in support maintenance
activities.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in Sec. 50.92 of Title 10 of the Code of Federal
Regulations (10 CFR), this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed one-time change to the CT for CPS TS 3.7.1 will not
increase the probability of an accident since it will only extend
the time period that one SX subsystem can be out of service. The
extension of the time duration that one SX subsystem is out of
service has no direct physical impact on the plant. The proposed
inoperable SX subsystem is normally in a standby mode while CPS is
in Mode 1, 2, or 3 and is not directly supporting plant operation.
Therefore, it can have no impact on the plant that would make an
accident more likely to occur due to its inoperability. The proposed
change does not adversely affect accident initiators or precursors,
nor does it alter the design assumptions, conditions, or
configuration of the facility or the manner in which the plant is
operated and maintained.
The previously analyzed accidents are initiated by the failure
of plant structures, systems, or components. The SX system is not
considered an initiator for any of these previously analyzed events.
The proposed
[[Page 56499]]
change does not have a detrimental impact on the integrity of any
plant structure, system, or component that initiates an analyzed
event. No active or passive failure mechanisms that could lead to an
accident are affected. The proposed change will not alter the
operation of, or otherwise increase the failure probability of any
plant equipment that initiates an analyzed accident. Therefore, the
proposed change does not involve a significant increase in the
probability of an accident previously evaluated.
The proposed change does not alter or prevent the ability of
structures, systems, and components (SSCs) from performing their
intended function to mitigate the consequences of an initiating
event within the assumed acceptance limits. The proposed change does
not require any physical change to any plant SSCs nor does it
require any change in systems or plant operations. The proposed
onetime increase in the CT is consistent with the philosophy of the
current TS LCO which allows one SX subsystem to be inoperable for 72
hours. This change only extends the 72 hour CT to 7 days which has
been shown to be acceptable from a risk perspective. The minimum
equipment required to mitigate the consequences of an accident and/
or safely shut down the plant will be Operable or available during
the extended CT. The proposed change is consistent with the safety
analysis assumptions and resultant consequences. Based on the above,
the proposed change does not involve a significant increase in the
consequences of an accident previously evaluated. Therefore, the
proposed change does not involve a significant increase in the
probability or consequences of an accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes do not involve the use or installation of
new equipment and the currently installed equipment will not be
operated in a new or different manner. No new or different system
interactions are created and no new processes are introduced. The
proposed changes will not introduce any new failure mechanisms,
malfunctions, or accident initiators not already considered in the
design and licensing bases. Based on this evaluation, the proposed
change does not create the possibility of a new or different kind of
accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change does not alter any existing setpoints at
which protective actions are initiated and no new setpoints or
protective actions are introduced. The design and operation of the
SX system remains unchanged. The risk associated with the proposed
increase in the time an SX pump is allowed to be inoperable was
evaluated using the risk-informed processes described in RG 1.174
and RG 1.177. The risk was shown to be acceptable. Based on this
evaluation, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves a No Significant Hazards
Consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period should circumstances change during the 30-day comment period
such that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. Should the Commission take action
prior to the expiration of either the comment period or the notice
period, it will publish in the Federal Register a notice of issuance.
Should the Commission make a final No Significant Hazards Consideration
Determination, any hearing will take place after issuance. The
Commission expects that the need to take this action will occur very
infrequently.
II. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this Federal
Register notice, any person whose interest may be affected by this
proceeding and who desires to participate as a party in the proceeding
must file a written request for hearing or a petition for leave to
intervene specifying the contentions which the person seeks to have
litigated in the hearing with respect to the license amendment request.
Requests for hearing and petitions for leave to intervene shall be
filed in accordance with the NRC's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the NRC's PDR. The
NRC's regulations are accessible electronically from the NRC Library on
the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/.
As required by 10 CFR 2.309, a request for hearing or petition for
leave to intervene must set forth with particularity the interest of
the petitioner in the proceeding and how that interest may be affected
by the results of the proceeding. The hearing request or petition must
specifically explain the reasons why intervention should be permitted,
with particular reference to the following general requirements: (1)
The name, address, and telephone number of the requestor or petitioner;
(2) the nature of the requestor's/petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
requestor's/petitioner's property, financial, or other interest in the
proceeding; and (4) the possible effect of any decision or order which
may be entered in the proceeding on the requestor's/petitioner's
interest. The hearing request or petition must also include the
specific contentions that the requestor/petitioner seeks to have
litigated at the proceeding.
For each contention, the requestor/petitioner must provide a
specific statement of the issue of law or fact to be raised or
controverted, as well as a brief explanation of the basis for the
contention. Additionally, the requestor/petitioner must demonstrate
that the issue raised by each contention is within the scope of the
proceeding and is material to the findings that the NRC must make to
support the granting of a license amendment in response to the
application. The hearing request or petition must also include a
concise statement of the alleged facts or expert opinion that support
the contention and on which the requestor/petitioner intends to rely at
the hearing, together with references to those specific sources and
documents. The hearing request or petition must provide sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact, including references to specific
portions of the application for amendment that the petitioner disputes
and the supporting reasons for each dispute. If the requestor/
petitioner believes that the application for amendment fails to contain
information on a relevant matter as required by law, the requestor/
petitioner must identify each failure and the supporting reasons for
the requestor's/petitioner's belief. Each contention must be one which,
if proven, would entitle the requestor/
[[Page 56500]]
petitioner to relief. A requestor/petitioner who does not satisfy these
requirements for at least one contention will not be permitted to
participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions, including the opportunity to present evidence and to
submit a cross-examination plan for cross-examination of witnesses,
consistent with NRC regulations, policies, and procedures. The Atomic
Safety and Licensing Board will set the time and place for any
prehearing conferences and evidentiary hearings, and the appropriate
notices will be provided.
Hearing requests or petitions for leave to intervene must be filed
no later than 60 days from the date of publication of this notice.
Requests for hearing, petitions for leave to intervene, and motions for
leave to file new or amended contentions that are filed after the 60-
day deadline will not be entertained absent a determination by the
presiding officer that the filing demonstrates good cause by satisfying
the three factors in 10 CFR 2.309(c)(1)(i)-(iii).
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment unless the
Commission finds an imminent danger to the health or safety of the
public, in which case it will issue an appropriate order or rule under
10 CFR part 2.
III. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten 10 days prior to the filing deadline, the participant should
contact the Office of the Secretary by email at hearing.docket@nrc.gov,
or by telephone at 301-415-1677, to request (1) a digital
identification (ID) certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North,
[[Page 56501]]
11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking
and Adjudications Staff. Participants filing a document in this manner
are responsible for serving the document on all other participants.
Filing is considered complete by first-class mail as of the time of
deposit in the mail, or by courier, express mail, or expedited delivery
service upon depositing the document with the provider of the service.
A presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the
presiding officer subsequently determines that the reason for granting
the exemption from use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a request to intervene will require
including information on local residence in order to demonstrate a
proximity assertion of interest in the proceeding. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 60-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i)-(iii).
For further details with respect to this action, see the
application for license amendment dated September 11, 2015.
Attorney for licensee: Bradley J. Fewell, Associate General
Counsel, Exelon Nuclear, 4300 Winfield Road, Warrenville, IL 60555.
NRC Branch Chief: Travis L. Tate.
Dated at Rockville, Maryland, this 15th day of September 2015.
For the Nuclear Regulatory Commission.
Eva A. Brown,
Senior Project Manager, Plant Licensing III-2 and Planning and Analysis
Branch, Division of Operating Reactor Licensing, Office of Nuclear
Reactor Regulation.
[FR Doc. 2015-23632 Filed 9-17-15; 8:45 am]