Safety Zone; Saint-Gobain Performance Plastics Celebration Fireworks; Lake Erie, Cleveland, OH, 56386-56388 [2015-23536]

Download as PDF 56386 Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Rules and Regulations environment. This rule involves establishment of a temporary safety zone to protect persons and property from potential hazards associated with the scheduled New Athens Drag Boat Race taking place on the Kaskaskia River. This rule is categorically excluded from further review under paragraph 34(g) of Figure 2–1 of the Commandant Instruction. An environmental analysis checklist supporting this determination and a Categorical Exclusion Determination are available in the docket where indicated under ADDRESSES. We seek any comments or information that may lead to the discovery of a significant environmental impact from this rule. Coast Guard Sector Upper Mississippi River at (314) 269–2332. (3) All persons and vessels shall comply with the instruction of the COTP Upper Mississippi River and designated on-scene personnel. (d) Informational broadcasts. The COTP Upper Mississippi River or a designated representative will inform the public through Local Notice to Mariners of the enforcement period for the safety zone as well as any changes in the planned and published dates and times of enforcement. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call LT Stephanie Pitts, Chief of Waterways Management, U.S. Coast Guard Marine Safety Unit Cleveland; telephone 216– 937–0128. If you have questions on viewing the docket, call Ms. Cheryl Collins, Program Manager, Docket Operations, telephone 202–366–9826 or 1–800–647–5527. SUPPLEMENTARY INFORMATION: Dated: August 13, 2015. M. L. Malloy, Captain, U.S. Coast Guard, Captain of the Port Sector Upper Mississippi River. Table of Acronyms List of Subjects in 33 CFR Part 165 [FR Doc. 2015–23535 Filed 9–17–15; 8:45 am] DHS Department of Homeland Security FR Federal Register NPRM Notice of Proposed Rulemaking TFR Temporary Final Rule Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways. For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows: BILLING CODE 9110–04–P A. Regulatory History and Information DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS RIN 1625–AA00 1. The authority citation for part 165 continues to read as follows: ■ Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5; Department of Homeland Security Delegation No. 0170.1. 2. A new temporary § 165.T08–0777 is added to read as follows: ■ tkelley on DSK3SPTVN1PROD with RULES § 165.T08–0777 Safety Zone; Kaskaskia River between MM 28 and 29; New Athens, IL. (a) Location. The following area is a safety zone: All waters of the Kaskaskia River between MM 28 and 29, New Athens, IL. (b) Effective and enforcement period. This rule is effective from 8:00 a.m. until 6:00 p.m. on September 19, 2015 and September 20, 2015. This rule will be enforced with actual notice from 8:00 a.m. until 6:00 p.m. on September 19, 2015 and September 20, 2015. (c) Regulations. (1) In accordance with the general regulations in § 165.23, entry into, movement within, or departure from this zone is prohibited unless authorized by the COTP Upper Mississippi River or a designated representative. (2) Persons or vessels requiring entry into, departure from, or movement within a regulated area must request permission from the COTP Upper Mississippi River or a designated representative. They may be contacted on VHF–FM Channel 16, or through VerDate Sep<11>2014 16:42 Sep 17, 2015 Jkt 235001 [Docket Number USCG–2015–0833] Safety Zone; Saint-Gobain Performance Plastics Celebration Fireworks; Lake Erie, Cleveland, OH Coast Guard, DHS. Temporary final rule. AGENCY: ACTION: The Coast Guard is establishing a temporary safety zone in Lake Erie, Cleveland, OH. This safety zone is intended to restrict vessels from a portion of Lake Erie during the SaintGobain Performance Plastics Celebration fireworks display. This temporary safety zone is necessary to protect mariners and vessels from the navigational hazards associated with a fireworks display. SUMMARY: This rule will be effective from 9:15 p.m. until 10:05 p.m. on September 19, 2015. ADDRESSES: Documents mentioned in this preamble are part of docket [USCG– 2015–0833]. To view documents mentioned in this preamble as being available in the docket, go to https:// www.regulations.gov, type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this rulemaking. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. DATES: PO 00000 Frm 00018 Fmt 4700 Sfmt 4700 The Coast Guard is issuing this temporary final rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are ‘‘impracticable, unnecessary, or contrary to the public interest.’’ Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because doing so would be impracticable and contrary to the public interest. The final details for this event were not known to the Coast Guard until there was insufficient time remaining before the event to publish an NPRM. Thus, delaying the effective date of this rule to wait for a comment period to run would be both impracticable and contrary to the public interest because it would inhibit the Coast Guard’s ability to protect spectators and vessels from the hazards associated with a maritime fireworks display. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this temporary rule effective less than 30 days after publication in the Federal Register. For the same reasons discussed in the preceding paragraph, waiting for a 30 day notice period to run would be impracticable and contrary to the public interest. B. Basis and Purpose The legal basis and authorities for this rule are found in 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5; and Department of Homeland Security Delegation No. 0170.1, which collectively authorize the E:\FR\FM\18SER1.SGM 18SER1 Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Rules and Regulations Coast Guard to establish and define regulatory safety zones. Between 9:15 p.m. and 10:05 p.m. on September 19, 2015, a fireworks display will be held on the shoreline of Lake Erie in Cleveland, OH. It is anticipated that numerous vessels will be in the immediate vicinity of the launch point. The Captain of the Port Buffalo has determined that such a launch proximate to a gathering of watercraft poses a significant risk to public safety and property. Such hazards include premature and accidental detonations, dangerous projectiles, and falling or burning debris. C. Discussion of the Final Rule With the aforementioned hazards in mind, the Captain of the Port Buffalo has determined that this temporary safety zone is necessary to ensure the safety of spectators and vessels during the Saint-Gobain Performance Plastics Celebration fireworks display. This zone will be effective and enforced from 9:15 p.m. until 10:05 p.m. on September 19, 2015. This zone will encompass all waters of Lake Erie; Cleveland, OH within a 280-foot radius of position 41° 30′34.23″ N. and 81°41′56.3″ W. (NAD 83). Entry into, transiting, or anchoring within the safety zone is prohibited unless authorized by the Captain of the Port Buffalo or his designated on-scene representative. The Captain of the Port or his designated on-scene representative may be contacted via VHF Channel 16. tkelley on DSK3SPTVN1PROD with RULES D. Regulatory Analyses We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on these statutes and executive orders. 1. Regulatory Planning and Review This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Executive Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders. We conclude that this rule is not a significant regulatory action because we anticipate that it will have minimal impact on the economy, will not interfere with other agencies, will not adversely alter the budget of any grant VerDate Sep<11>2014 16:42 Sep 17, 2015 Jkt 235001 or loan recipients, and will not raise any novel legal or policy issues. The safety zone created by this rule will be relatively small and enforced for a relatively short time. Also, the safety zone is designed to minimize its impact on navigable waters. Under certain conditions, moreover, vessels may still transit through the safety zone when permitted by the Captain of the Port. 2. Impact on Small Entities Under the Regulatory Flexibility Act (5 U.S.C. 601–612), we have considered the impact of this rule on small entities. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. This rule will affect the following entities, some of which might be small entities: The owners or operators of vessels intending to transit or anchor in a portion of Lake Erie; Cleveland, OH on the evening of September 19, 2015. This safety zone will not have a significant economic impact on a substantial number of small entities for the following reasons: This safety zone would be effective, and thus subject to enforcement, for only 50 minutes late in the day. Traffic may be allowed to pass through the zone with the permission of the Captain of the Port. The Captain of the Port can be reached via VHF channel 16. Before the enforcement of the zone, we would issue local Broadcast Notice to Mariners. 3. Assistance for Small Entities Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104–121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section above. Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency’s responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1– PO 00000 Frm 00019 Fmt 4700 Sfmt 4700 56387 888–REG–FAIR (1–888–734–3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard. 4. Collection of Information This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501–3520). 5. Federalism A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and determined that this rule does not have implications for federalism. 6. Protest Activities The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places, or vessels. 7. Unfunded Mandates Reform Act The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531–1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble. 8. Taking of Private Property This rule will not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights. 9. Civil Justice Reform This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden. 10. Protection of Children We have analyzed this rule under Executive Order 13045, Protection of E:\FR\FM\18SER1.SGM 18SER1 56388 Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Rules and Regulations Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children. 11. Indian Tribal Governments This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes. 12. Energy Effects This action is not a ‘‘significant energy action’’ under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. 13. Technical Standards This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards. tkelley on DSK3SPTVN1PROD with RULES 14. Environment We have analyzed this rule under Department of Homeland Security Management Directive 023–01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321–4370f), and have determined that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves the establishment of a safety zone and, therefore it is categorically excluded from further review under paragraph 34(g) of Figure 2–1 of the Commandant Instruction. An environmental analysis checklist supporting this determination and a Categorical Exclusion Determination are available in the docket where indicated under ADDRESSES. We seek any comments or information that may lead to the discovery of a significant environmental impact from this rule. List of Subjects in 33 CFR Part 165 Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways. For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows: VerDate Sep<11>2014 16:42 Sep 17, 2015 Jkt 235001 PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS DEPARTMENT OF HOMELAND SECURITY 1. The authority citation for part 165 continues to read as follows: Coast Guard ■ Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5; Department of Homeland Security Delegation No. 0170.1. 2. Section 165.T09–0833 is added to read as follows: ■ § 165.T09–0833 Safety Zone; Saint-Gobain Performance Plastics Celebration Fireworks, Lake Erie; Cleveland, OH. (a) Location. This zone will encompass all waters of Lake Erie; Cleveland, OH within a 280-foot radius of position 41°30′34.23″ N. and 81°41′56.3″ W. (NAD 83). (b) Effective and Enforcement Period. This regulation is effective and will be enforced on September 19, 2015 from 9:15 p.m. until 10:05 p.m. (c) Regulations. (1) In accordance with the general regulations in § 165.23 of this part, entry into, transiting, or anchoring within this safety zone is prohibited unless authorized by the Captain of the Port Buffalo or his designated on-scene representative. (2) This safety zone is closed to all vessel traffic, except as may be permitted by the Captain of the Port Buffalo or his designated on-scene representative. (3) The ‘‘on-scene representative’’ of the Captain of the Port Buffalo is any Coast Guard commissioned, warrant or petty officer who has been designated by the Captain of the Port Buffalo to act on his behalf. (4) Vessel operators desiring to enter or operate within the safety zone shall contact the Captain of the Port Buffalo or his on-scene representative to obtain permission to do so. The Captain of the Port Buffalo or his on-scene representative may be contacted via VHF Channel 16. Vessel operators given permission to enter or operate in the safety zone must comply with all directions given to them by the Captain of the Port Buffalo, or his on-scene representative. Dated: August 27, 2015. B. W. Roche, Captain, U.S. Coast Guard, Captain of the Port Buffalo. [FR Doc. 2015–23536 Filed 9–17–15; 8:45 am] BILLING CODE 9110–04–P 33 CFR Part 165 [Docket Number USCG–2015–0570] RIN 1625–AA00 Safety Zone; 520 Bridge Construction, Lake Washington, Seattle, WA ACTION: The Coast Guard is establishing a temporary safety zone on Lake Washington around the east span of the 520 Bridge in Seattle, Washington due to ongoing construction. The safety zone is necessary to ensure the safety of the maritime public and workers involved in the bridge construction when construction barges are located in the east span of the bridge. The safety zone will prohibit any person or vessel from entering or remaining in the safety zone unless authorized by the Captain of the Port or his Designated Representative. SUMMARY: This rule is effective without actual notice from September 18, 2015 through October 5, 2015. For the purposes of enforcement, actual notice will be used from September 5, 2015 until September 18, 2015. ADDRESSES: To view documents mentioned in this preamble as being available in the docket, go to https:// www.regulations.gov, type USCG–2015– 0570 in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this rule. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email Ryan Griffin, Waterways Management Division, Coast Guard Sector Puget Sound; telephone (206) 217–6051, email SectorPugetSoundWWM@uscg.mil. If you have questions on viewing or submitting material to the docket, call Ms. Cheryl Collins, Program Manager, Docket Operations, telephone 202–366– 9826. SUPPLEMENTARY INFORMATION: DATES: I. Table of Abbreviations CFR PO 00000 Frm 00020 Fmt 4700 Coast Guard, DHS. Temporary final rule. AGENCY: Sfmt 4700 E:\FR\FM\18SER1.SGM Code of Federal Regulations 18SER1

Agencies

[Federal Register Volume 80, Number 181 (Friday, September 18, 2015)]
[Rules and Regulations]
[Pages 56386-56388]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-23536]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 165

[Docket Number USCG-2015-0833]
RIN 1625-AA00


Safety Zone; Saint-Gobain Performance Plastics Celebration 
Fireworks; Lake Erie, Cleveland, OH

AGENCY: Coast Guard, DHS.

ACTION: Temporary final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a temporary safety zone in 
Lake Erie, Cleveland, OH. This safety zone is intended to restrict 
vessels from a portion of Lake Erie during the Saint-Gobain Performance 
Plastics Celebration fireworks display. This temporary safety zone is 
necessary to protect mariners and vessels from the navigational hazards 
associated with a fireworks display.

DATES: This rule will be effective from 9:15 p.m. until 10:05 p.m. on 
September 19, 2015.

ADDRESSES: Documents mentioned in this preamble are part of docket 
[USCG-2015-0833]. To view documents mentioned in this preamble as being 
available in the docket, go to https://www.regulations.gov, type the 
docket number in the ``SEARCH'' box and click ``SEARCH.'' Click on Open 
Docket Folder on the line associated with this rulemaking. You may also 
visit the Docket Management Facility in Room W12-140 on the ground 
floor of the Department of Transportation West Building, 1200 New 
Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call LT Stephanie Pitts, Chief of Waterways Management, U.S. Coast 
Guard Marine Safety Unit Cleveland; telephone 216-937-0128. If you have 
questions on viewing the docket, call Ms. Cheryl Collins, Program 
Manager, Docket Operations, telephone 202-366-9826 or 1-800-647-5527.

SUPPLEMENTARY INFORMATION:

Table of Acronyms

DHS Department of Homeland Security
FR Federal Register
NPRM Notice of Proposed Rulemaking
TFR Temporary Final Rule

A. Regulatory History and Information

    The Coast Guard is issuing this temporary final rule without prior 
notice and opportunity to comment pursuant to authority under section 
4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This 
provision authorizes an agency to issue a rule without prior notice and 
opportunity to comment when the agency for good cause finds that those 
procedures are ``impracticable, unnecessary, or contrary to the public 
interest.'' Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good 
cause exists for not publishing a notice of proposed rulemaking (NPRM) 
with respect to this rule because doing so would be impracticable and 
contrary to the public interest. The final details for this event were 
not known to the Coast Guard until there was insufficient time 
remaining before the event to publish an NPRM. Thus, delaying the 
effective date of this rule to wait for a comment period to run would 
be both impracticable and contrary to the public interest because it 
would inhibit the Coast Guard's ability to protect spectators and 
vessels from the hazards associated with a maritime fireworks display.
    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause 
exists for making this temporary rule effective less than 30 days after 
publication in the Federal Register. For the same reasons discussed in 
the preceding paragraph, waiting for a 30 day notice period to run 
would be impracticable and contrary to the public interest.

B. Basis and Purpose

    The legal basis and authorities for this rule are found in 33 
U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5; 
and Department of Homeland Security Delegation No. 0170.1, which 
collectively authorize the

[[Page 56387]]

Coast Guard to establish and define regulatory safety zones.
    Between 9:15 p.m. and 10:05 p.m. on September 19, 2015, a fireworks 
display will be held on the shoreline of Lake Erie in Cleveland, OH. It 
is anticipated that numerous vessels will be in the immediate vicinity 
of the launch point. The Captain of the Port Buffalo has determined 
that such a launch proximate to a gathering of watercraft poses a 
significant risk to public safety and property. Such hazards include 
premature and accidental detonations, dangerous projectiles, and 
falling or burning debris.

C. Discussion of the Final Rule

    With the aforementioned hazards in mind, the Captain of the Port 
Buffalo has determined that this temporary safety zone is necessary to 
ensure the safety of spectators and vessels during the Saint-Gobain 
Performance Plastics Celebration fireworks display. This zone will be 
effective and enforced from 9:15 p.m. until 10:05 p.m. on September 19, 
2015. This zone will encompass all waters of Lake Erie; Cleveland, OH 
within a 280-foot radius of position 41[deg] 30'34.23'' N. and 
81[deg]41'56.3'' W. (NAD 83).
    Entry into, transiting, or anchoring within the safety zone is 
prohibited unless authorized by the Captain of the Port Buffalo or his 
designated on-scene representative. The Captain of the Port or his 
designated on-scene representative may be contacted via VHF Channel 16.

D. Regulatory Analyses

    We developed this rule after considering numerous statutes and 
executive orders related to rulemaking. Below we summarize our analyses 
based on these statutes and executive orders.

1. Regulatory Planning and Review

    This rule is not a significant regulatory action under section 3(f) 
of Executive Order 12866, Regulatory Planning and Review, as 
supplemented by Executive Order 13563, Improving Regulation and 
Regulatory Review, and does not require an assessment of potential 
costs and benefits under section 6(a)(3) of Executive Order 12866 or 
under section 1 of Executive Order 13563. The Office of Management and 
Budget has not reviewed it under those Orders.
    We conclude that this rule is not a significant regulatory action 
because we anticipate that it will have minimal impact on the economy, 
will not interfere with other agencies, will not adversely alter the 
budget of any grant or loan recipients, and will not raise any novel 
legal or policy issues. The safety zone created by this rule will be 
relatively small and enforced for a relatively short time. Also, the 
safety zone is designed to minimize its impact on navigable waters. 
Under certain conditions, moreover, vessels may still transit through 
the safety zone when permitted by the Captain of the Port.

2. Impact on Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have 
considered the impact of this rule on small entities. The Coast Guard 
certifies under 5 U.S.C. 605(b) that this rule will not have a 
significant economic impact on a substantial number of small entities. 
The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not 
have a significant economic impact on a substantial number of small 
entities. This rule will affect the following entities, some of which 
might be small entities: The owners or operators of vessels intending 
to transit or anchor in a portion of Lake Erie; Cleveland, OH on the 
evening of September 19, 2015.
    This safety zone will not have a significant economic impact on a 
substantial number of small entities for the following reasons: This 
safety zone would be effective, and thus subject to enforcement, for 
only 50 minutes late in the day. Traffic may be allowed to pass through 
the zone with the permission of the Captain of the Port. The Captain of 
the Port can be reached via VHF channel 16. Before the enforcement of 
the zone, we would issue local Broadcast Notice to Mariners.

3. Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement 
Fairness Act of 1996 (Pub. L. 104-121), we want to assist small 
entities in understanding this rule. If the rule would affect your 
small business, organization, or governmental jurisdiction and you have 
questions concerning its provisions or options for compliance, please 
contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section above.
    Small businesses may send comments on the actions of Federal 
employees who enforce, or otherwise determine compliance with, Federal 
regulations to the Small Business and Agriculture Regulatory 
Enforcement Ombudsman and the Regional Small Business Regulatory 
Fairness Boards. The Ombudsman evaluates these actions annually and 
rates each agency's responsiveness to small business. If you wish to 
comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR 
(1-888-734-3247). The Coast Guard will not retaliate against small 
entities that question or complain about this rule or any policy or 
action of the Coast Guard.

4. Collection of Information

    This rule will not call for a new collection of information under 
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

5. Federalism

    A rule has implications for federalism under Executive Order 13132, 
Federalism, if it has a substantial direct effect on the States, on the 
relationship between the national government and the States, or on the 
distribution of power and responsibilities among the various levels of 
government. We have analyzed this rule under that Order and determined 
that this rule does not have implications for federalism.

6. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. 
Protesters are asked to contact the person listed in the FOR FURTHER 
INFORMATION CONTACT section to coordinate protest activities so that 
your message can be received without jeopardizing the safety or 
security of people, places, or vessels.

7. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) 
requires Federal agencies to assess the effects of their discretionary 
regulatory actions. In particular, the Act addresses actions that may 
result in the expenditure by a State, local, or tribal government, in 
the aggregate, or by the private sector of $100,000,000 (adjusted for 
inflation) or more in any one year. Though this rule will not result in 
such an expenditure, we do discuss the effects of this rule elsewhere 
in this preamble.

8. Taking of Private Property

    This rule will not cause a taking of private property or otherwise 
have taking implications under Executive Order 12630, Governmental 
Actions and Interference with Constitutionally Protected Property 
Rights.

9. Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) 
of Executive Order 12988, Civil Justice Reform, to minimize litigation, 
eliminate ambiguity, and reduce burden.

10. Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection 
of

[[Page 56388]]

Children from Environmental Health Risks and Safety Risks. This rule is 
not an economically significant rule and does not create an 
environmental risk to health or risk to safety that may 
disproportionately affect children.

11. Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 
13175, Consultation and Coordination with Indian Tribal Governments, 
because it does not have a substantial direct effect on one or more 
Indian tribes, on the relationship between the Federal Government and 
Indian tribes, or on the distribution of power and responsibilities 
between the Federal Government and Indian tribes.

12. Energy Effects

    This action is not a ``significant energy action'' under Executive 
Order 13211, Actions Concerning Regulations That Significantly Affect 
Energy Supply, Distribution, or Use.

13. Technical Standards

    This rule does not use technical standards. Therefore, we did not 
consider the use of voluntary consensus standards.

14. Environment

    We have analyzed this rule under Department of Homeland Security 
Management Directive 023-01 and Commandant Instruction M16475.lD, which 
guide the Coast Guard in complying with the National Environmental 
Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have determined 
that this action is one of a category of actions that do not 
individually or cumulatively have a significant effect on the human 
environment. This rule involves the establishment of a safety zone and, 
therefore it is categorically excluded from further review under 
paragraph 34(g) of Figure 2-1 of the Commandant Instruction. An 
environmental analysis checklist supporting this determination and a 
Categorical Exclusion Determination are available in the docket where 
indicated under ADDRESSES. We seek any comments or information that may 
lead to the discovery of a significant environmental impact from this 
rule.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

    For the reasons discussed in the preamble, the Coast Guard amends 
33 CFR part 165 as follows:

PART 165--REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

0
1. The authority citation for part 165 continues to read as follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 
6.04-6, and 160.5; Department of Homeland Security Delegation No. 
0170.1.

0
2. Section 165.T09-0833 is added to read as follows:


Sec.  165.T09-0833  Safety Zone; Saint-Gobain Performance Plastics 
Celebration Fireworks, Lake Erie; Cleveland, OH.

    (a) Location. This zone will encompass all waters of Lake Erie; 
Cleveland, OH within a 280-foot radius of position 41[deg]30'34.23'' N. 
and 81[deg]41'56.3'' W. (NAD 83).
    (b) Effective and Enforcement Period. This regulation is effective 
and will be enforced on September 19, 2015 from 9:15 p.m. until 10:05 
p.m.
    (c) Regulations. (1) In accordance with the general regulations in 
Sec.  165.23 of this part, entry into, transiting, or anchoring within 
this safety zone is prohibited unless authorized by the Captain of the 
Port Buffalo or his designated on-scene representative.
    (2) This safety zone is closed to all vessel traffic, except as may 
be permitted by the Captain of the Port Buffalo or his designated on-
scene representative.
    (3) The ``on-scene representative'' of the Captain of the Port 
Buffalo is any Coast Guard commissioned, warrant or petty officer who 
has been designated by the Captain of the Port Buffalo to act on his 
behalf.
    (4) Vessel operators desiring to enter or operate within the safety 
zone shall contact the Captain of the Port Buffalo or his on-scene 
representative to obtain permission to do so. The Captain of the Port 
Buffalo or his on-scene representative may be contacted via VHF Channel 
16. Vessel operators given permission to enter or operate in the safety 
zone must comply with all directions given to them by the Captain of 
the Port Buffalo, or his on-scene representative.

    Dated: August 27, 2015.
B. W. Roche,
Captain, U.S. Coast Guard, Captain of the Port Buffalo.
[FR Doc. 2015-23536 Filed 9-17-15; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.