Alcoa Power Generating, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 55843-55844 [2015-23320]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 180 / Thursday, September 17, 2015 / Notices
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) An existing 9-foothigh, 460-foot-long gravity dam; (2) a
proposed concrete powerhouse
approximately 100 feet long by 40 feet
wide housing eight low-head, horizontal
bulb turbines having a total installed
capacity of 1,992 kilowatts; (3) a
proposed concrete tailrace wall
extending approximately 100 feet
downstream; (4) a proposed 500-footlong, 12,700-volt transmission line
interconnecting with the local utility;
and (5) appurtenant facilities. The
proposed project would have an average
annual generation of about 10 megawatthours.
Applicant Contact: Mr. Mark
Boumansour, Gravity Renewables, Inc.,
1401 Walnut Street, Suite 220, Boulder,
CO 80302; phone: (303) 440–3378.
FERC Contact: Timothy Looney;
phone: (202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14706–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14706) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
VerDate Sep<11>2014
17:30 Sep 16, 2015
Jkt 235001
Dated: September 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–23323 Filed 9–16–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–108]
Alcoa Power Generating, Inc.; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for a
Temporary Variance from Minimum
Flow and Reservoir Level
Requirements—Article 33.
b. Project No.: 2197–108.
c. Date Filed: September 4, 2015.
d. Applicant: Alcoa Power
Generating, Inc. (licensee).
e. Name of Project: Yadkin
Hydroelectric Project.
f. Location: Davidson, Davie,
Montgomery, Rowan, and Stanly
counties, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mark Gross,
Vice President of Hydro Operations,
(704) 422–5774, or mark.gross@
alcoa.com.
i. FERC Contact: Alicia Burtner, (202)
502–8038, or alicia.burtner@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number (P–
2197–108) on any comments, motions,
or recommendations filed.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
55843
k. Description of Request: The
licensee requests a temporary variance
from the requirements of license Article
33, which mandates the implementation
of the Reservoir Operating Guides. The
requirements, as amended in 1968,
pertain to minimum flows and reservoir
levels at the four project developments.
The licensee is required to maintain a
minimum 900 cubic feet per second
(cfs) daily average flow and a 1,400 cfs
weekly average minimum flow. Article
33 also stipulates a rule curve relating
reservoir levels of the upstream High
Rock reservoir to the downstream Badin
(Narrows) reservoir level seasonally.
The licensee indicates that, as a result
of ongoing drought conditions
throughout the watershed, it consulted
with its Drought Management Team to
determine alternative operating
procedures to conserve water. The
licensee requests that the weekly
minimum flow requirement be reduced
to a 1,200 cfs average, and it outlines
additional modifications to daily and
weekly minimum flows based on
conditions, updated mid-month.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
E:\FR\FM\17SEN1.SGM
17SEN1
55844
Federal Register / Vol. 80, No. 180 / Thursday, September 17, 2015 / Notices
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to minimum flows
and/or impoundment levels at the
Yadkin Hydroelectric Project, which are
the subject of the variance. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: September 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–23320 Filed 9–16–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
[Docket No. ER15–2620–000]
Little Elk Wind Project, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding Little Elk
Wind Project, LLC’s application for
market-based rate authority, with an
VerDate Sep<11>2014
17:30 Sep 16, 2015
Jkt 235001
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
30, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–23322 Filed 9–16–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2631–000]
Odell Wind Farm, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Odell
Wind Farm, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
30, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\17SEN1.SGM
17SEN1
Agencies
[Federal Register Volume 80, Number 180 (Thursday, September 17, 2015)]
[Notices]
[Pages 55843-55844]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-23320]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2197-108]
Alcoa Power Generating, Inc.; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Request for a Temporary Variance from
Minimum Flow and Reservoir Level Requirements--Article 33.
b. Project No.: 2197-108.
c. Date Filed: September 4, 2015.
d. Applicant: Alcoa Power Generating, Inc. (licensee).
e. Name of Project: Yadkin Hydroelectric Project.
f. Location: Davidson, Davie, Montgomery, Rowan, and Stanly
counties, North Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mark Gross, Vice President of Hydro
Operations, (704) 422-5774, or mark.gross@alcoa.com.
i. FERC Contact: Alicia Burtner, (202) 502-8038, or
alicia.burtner@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 30 days from the issuance date of this notice by
the Commission.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project number (P-2197-108) on any comments,
motions, or recommendations filed.
k. Description of Request: The licensee requests a temporary
variance from the requirements of license Article 33, which mandates
the implementation of the Reservoir Operating Guides. The requirements,
as amended in 1968, pertain to minimum flows and reservoir levels at
the four project developments. The licensee is required to maintain a
minimum 900 cubic feet per second (cfs) daily average flow and a 1,400
cfs weekly average minimum flow. Article 33 also stipulates a rule
curve relating reservoir levels of the upstream High Rock reservoir to
the downstream Badin (Narrows) reservoir level seasonally. The licensee
indicates that, as a result of ongoing drought conditions throughout
the watershed, it consulted with its Drought Management Team to
determine alternative operating procedures to conserve water. The
licensee requests that the weekly minimum flow requirement be reduced
to a 1,200 cfs average, and it outlines additional modifications to
daily and weekly minimum flows based on conditions, updated mid-month.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must
[[Page 55844]]
be received on or before the specified comment date for the particular
application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to minimum flows and/or impoundment levels at the Yadkin Hydroelectric
Project, which are the subject of the variance. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: September 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-23320 Filed 9-16-15; 8:45 am]