PB Energy, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 55350 [2015-23146]
Download as PDF
55350
Federal Register / Vol. 80, No. 178 / Tuesday, September 15, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1432–013]
mstockstill on DSK4VPTVN1PROD with NOTICES
PB Energy, Inc.; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 1432–013.
c. Date Filed: August 31, 2015.
d. Submitted By: PB Energy, Inc.
e. Name of Project: Dry Spruce Bay
Project.
f. Location: On an unnamed creek
near Port Bailey in Kodiak Island
Borough, Alaska. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Robert
and Anita Shane, Director of
Administration, PB Energy, Inc., PO Box
KPY, Kodiak, Alaska 99697; (360) 633–
3719; email—anita99697@gmail.com.
i. FERC Contact: Ryan Hansen at (202)
502–8074; or email at ryan.hansen@
ferc.gov.
j. PB Energy, Inc. filed its request to
use the Traditional Licensing Process on
May 29, 2015. PB Energy, Inc. provided
public notice of its request on June 8,
2015. In a letter dated July 22, 2015, the
Director of the Division of Hydropower
Licensing approved PB Energy, Inc.’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Alaska State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. PB Energy, Inc. filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
VerDate Sep<11>2014
19:04 Sep 14, 2015
Jkt 235001
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
n. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 1432.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by May 31, 2018.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: September 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–23146 Filed 9–14–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14683–000]
Mr. Adam R. Rousselle, II; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 17, 2015, Mr. Adam R.
Rousselle, II, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Blue Marsh Dam Water Power Project
(project) to be located on Tulpehocken
Creek, near the town of Reading, Berks
County, Pennsylvania. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
PO 00000
Frm 00029
Fmt 4703
Sfmt 9990
The project would consist of the
following: (1) a proposed 6-footdiameter penstock; (2) a proposed
powerhouse containing two generating
units having a total installed capacity of
2,500 kilowatts; (3) a tailrace returning
flow to Tulpehocken Creek; (4) a
proposed 0.9-mile-long, 12.47-kilovolt
transmission line interconnecting with
the Pennsylvania Power Company
system; and (5) appurtenant facilities.
The proposed project would have an
average annual generation of about
9,943,000 kilowatt-hours, which would
be sold to a local utility.
Applicant Contact: Mr. Adam R.
Rousselle, II, 104 Autumn Trace Drive,
New Hope, PA 18938; phone: (215) 485–
1708.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14683–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14683) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–23152 Filed 9–14–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15SEN1.SGM
15SEN1
Agencies
[Federal Register Volume 80, Number 178 (Tuesday, September 15, 2015)]
[Notices]
[Page 55350]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-23146]
[[Page 55350]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1432-013]
PB Energy, Inc.; Notice of Intent To File License Application,
Filing of Pre-Application Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 1432-013.
c. Date Filed: August 31, 2015.
d. Submitted By: PB Energy, Inc.
e. Name of Project: Dry Spruce Bay Project.
f. Location: On an unnamed creek near Port Bailey in Kodiak Island
Borough, Alaska. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Robert and Anita Shane, Director of
Administration, PB Energy, Inc., PO Box KPY, Kodiak, Alaska 99697;
(360) 633-3719; email_anita99697@gmail.com.
i. FERC Contact: Ryan Hansen at (202) 502-8074; or email at
ryan.hansen@ferc.gov.
j. PB Energy, Inc. filed its request to use the Traditional
Licensing Process on May 29, 2015. PB Energy, Inc. provided public
notice of its request on June 8, 2015. In a letter dated July 22, 2015,
the Director of the Division of Hydropower Licensing approved PB
Energy, Inc.'s request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Alaska State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. PB Energy, Inc. filed a Pre-Application Document (PAD; including
a proposed process plan and schedule) with the Commission, pursuant to
18 CFR 5.6 of the Commission's regulations.
m. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
n. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 1432. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by May 31,
2018.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: September 9, 2015.
Kimberly D. Bose,
Secretary.