Exelon Generation Company, LLC; Notice of Availability of Environmental Assessment, 54278 [2015-22649]
Download as PDF
54278
Federal Register / Vol. 80, No. 174 / Wednesday, September 9, 2015 / Notices
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC et. al. v. PJM
Interconnection, L.L.C.
Docket No. ER13–1927, et al., PJM
Interconnection- SERTP
Docket No. ER15–2114, PJM
Interconnection, L.L.C. and
Transource West Virginia, LLC
Docket No. EL15–79, TransSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Delaware Public
Service Commission et. al., v. PJM
Interconnection, L.L.C. et. al.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
For more information, contact the
following:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission, (202) 502–
6604, Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, (202) 502–6474,
Alina.Halay@ferc.gov.
Dated: September 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–22647 Filed 9–8–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 405–113]
Lhorne on DSK5TPTVN1PROD with NOTICES
Exelon Generation Company, LLC;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR
47897), the Office of Energy Projects has
reviewed an application submitted by
Exelon Generating Company, LLC
(licensee) to allow Peach Bottom Atomic
Power Station (Peach Bottom), in York
County, Pennsylvania, the use of
Conowingo Hydroelectric (FERC No.
405) project lands and water for the
increased withdrawal and discharge of
water. The project is located on the
Susquehanna River near Lancaster,
Pennsylvania, in Hartford and Cecil
counties, Maryland and in York and
Lancaster counties, Pennsylvania.
An Environmental Assessment (EA)
has been prepared as part of
Commission staff’s review of the
proposal. In the application, the
VerDate Sep<11>2014
14:19 Sep 08, 2015
Jkt 235001
licensee proposes to increase the total
water withdrawn for the operation of
Peach Bottom from a currently
authorized 2,236.264 million gallons per
day (mgd) to 2,363.620 mgd and to
increase the associated consumptive use
of water withdrawn from 35.5 mgd to
49.0 mgd. This EA contains Commission
staff’s analysis of the probable
environmental impacts of the proposed,
increased withdraw and discharge of
water and concludes that approval of
the proposal would not constitute a
major federal action significantly
affecting the quality of the human
environment.
The EA is available for electronic
review and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426. The EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number (P–405) in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at (866) 208–3372 or
for TTY, (202) 502–8659.
Any comments on the EA should be
filed by October 2, 2015 and should be
addressed to the Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1–A,
Washington, DC 20426. Please reference
the project name and project number
(P–405–113) on all comments.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link.
For further information, contact Alicia
Burtner at (202) 502–8038 or by email
at Alicia.burtner@ferc.gov.
Dated: September 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–22649 Filed 9–8–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2593–000]
Desert Stateline LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Desert
PO 00000
Frm 00020
Fmt 4703
Sfmt 9990
Stateline LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
22, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–22646 Filed 9–8–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 80, Number 174 (Wednesday, September 9, 2015)]
[Notices]
[Page 54278]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-22649]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 405-113]
Exelon Generation Company, LLC; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy
Projects has reviewed an application submitted by Exelon Generating
Company, LLC (licensee) to allow Peach Bottom Atomic Power Station
(Peach Bottom), in York County, Pennsylvania, the use of Conowingo
Hydroelectric (FERC No. 405) project lands and water for the increased
withdrawal and discharge of water. The project is located on the
Susquehanna River near Lancaster, Pennsylvania, in Hartford and Cecil
counties, Maryland and in York and Lancaster counties, Pennsylvania.
An Environmental Assessment (EA) has been prepared as part of
Commission staff's review of the proposal. In the application, the
licensee proposes to increase the total water withdrawn for the
operation of Peach Bottom from a currently authorized 2,236.264 million
gallons per day (mgd) to 2,363.620 mgd and to increase the associated
consumptive use of water withdrawn from 35.5 mgd to 49.0 mgd. This EA
contains Commission staff's analysis of the probable environmental
impacts of the proposed, increased withdraw and discharge of water and
concludes that approval of the proposal would not constitute a major
federal action significantly affecting the quality of the human
environment.
The EA is available for electronic review and reproduction at the
Commission's Public Reference Room, located at 888 First Street NE.,
Room 2A, Washington, DC 20426. The EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number (P-405) in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3372 or for TTY,
(202) 502-8659.
Any comments on the EA should be filed by October 2, 2015 and
should be addressed to the Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room 1-A, Washington, DC 20426.
Please reference the project name and project number (P-405-113) on all
comments. Comments may be filed electronically via the Internet in lieu
of paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site under the ``eFiling'' link.
For further information, contact Alicia Burtner at (202) 502-8038
or by email at Alicia.burtner@ferc.gov.
Dated: September 2, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-22649 Filed 9-8-15; 8:45 am]