Quality Assurance Program Description-Design Certification, Early Site Permit and New License Applicants, 53902-53903 [2015-22555]
Download as PDF
53902
Federal Register / Vol. 80, No. 173 / Tuesday, September 8, 2015 / Notices
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO
SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING—Continued
Day
>A + 60
Event/activity
Decision on contention admission.
[FR Doc. 2015–21795 Filed 9–4–15; 8:45 am]
Week of September 28, 2015—Tentative
BILLING CODE 7590–01–P
Monday, September 28, 2015
1:30 p.m. NRC All Employees Meeting
(Public Meeting), Marriott Bethesda
North Hotel, 5701 Marinelli Road,
Rockville, MD 20852
NUCLEAR REGULATORY
COMMISSION
[NRC–2015–0001]
Sunshine Act Meeting Notice
September 7, 14, 21, 28, October
5, 12, 2015.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
DATE:
Week of September 7, 2015
Tuesday, September 8, 2015
9:25 a.m. Affirmation Session (Public
Meeting)—Tentative
(a) Final Rule: Hearing on Challenges
to the Immediate Effectiveness of
Orders (10 CFR parts 2 and 150;
RIN 3150–AJ27). (Tentative)
(b) DTE Electric Co. (Fermi Nuclear
Power Plant, Unit 2), Applicant’s
Appeal of LBP–15–5 (Mar. 3, 2015).
(Tentative)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
9:30 a.m. Briefing on Project AIM 2020
(Public Meeting) (Contact: Karen
Fitch: 301–415–7358)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Thursday, September 10, 2015
9:30 a.m. Briefing on NRC International
Activities (Closed—Ex. 1 & 9)
Week of September 14, 2015—Tentative
There are no meetings scheduled for
the week of September 14, 2015.
Week of September 21, 2015—Tentative
Tuesday, September 22, 2015
asabaliauskas on DSK5VPTVN1PROD with NOTICES
9:30 a.m. Discussion of Management
and Personnel Issues (Closed—Ex. 2
& 6)
Thursday, September 24, 2015
9:30 a.m. Strategic Programmatic
Overview of the New Reactors
Business Line (Public Meeting)
(Contact: Donna Williams: 301–
415–1322)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
VerDate Sep<11>2014
17:18 Sep 04, 2015
Jkt 235001
Thursday, October 1, 2015
9:00 a.m. Strategic Programmatic
Overview of the Decommissioning
and Low-Level Waste and Spent
Fuel Storage and Transportation
Business Lines (Public Meeting)
(Contact: Damaris Marcano: 301–
415–7328)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Week of October 5, 2015—Tentative
There are no meetings scheduled for
the week of October 5, 2015.
Week of October 12, 2015—Tentative
There are no meetings scheduled for
the week of October 12, 2015.
*
*
*
*
*
The schedule for Commission
meetings is subject to change on short
notice. For more information or to verify
the status of meetings, contact Glenn
Ellmers at 301–415–0442 or via email at
Glenn.Ellmers@nrc.gov.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify
Kimberly Meyer, NRC Disability
Program Manager, at 301–287–0727, by
videophone at 240–428–3217, or by
email at Kimberly.Meyer-Chambers@
nrc.gov. Determinations on requests for
reasonable accommodation will be
made on a case-by-case basis.
*
*
*
*
*
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
PO 00000
Frm 00144
Fmt 4703
Sfmt 4703
Regulatory Commission, Office of the
Secretary, Washington, DC 20555 (301–
415–1969), or email
Brenda.Akstulewicz@nrc.gov or
Patricia.Jimenez@nrc.gov.
Dated: September 2, 2015.
Glenn Ellmers,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2015–22613 Filed 9–3–15; 11:15 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2014–0204]
Quality Assurance Program
Description—Design Certification,
Early Site Permit and New License
Applicants
Nuclear Regulatory
Commission.
ACTION: Standard review plan-final
section; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a final
revision to NUREG–0800, ‘‘Standard
Review Plan for the Review of Safety
Analysis Reports for Nuclear Power
Plants: LWR Edition,’’ Section 17.5,
‘‘Quality Assurance Program
Description—Design Certification, Early
Site Permit and New License
Applicants.’’
DATES: The effective date of this
Standard Review Plan (SRP) update is
October 8, 2015.
ADDRESSES: Please refer to Docket ID
NRC–2014–0204 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0204. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
SUMMARY:
E:\FR\FM\08SEN1.SGM
08SEN1
Federal Register / Vol. 80, No. 173 / Tuesday, September 8, 2015 / Notices
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it available in
ADAMS) is provided the first time that
a document is referenced. The final
revision for Standard Review Plan (SRP)
Section 17.5, ‘‘Quality Assurance
Program Description—Design
Certification, Early Site Permit and New
License Applicants,’’ is available in
ADAMS under Accession No.
ML15037A441.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• The NRC posts its issued staff
guidance on the NRC’s external Web
page (https://www.nrc.gov/reading-rm/
doc-collections/nuregs/staff/sr0800/).
FOR FURTHER INFORMATION CONTACT:
Mark Notich, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3053; email: Mark.Notich@
nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Background
asabaliauskas on DSK5VPTVN1PROD with NOTICES
On September 24, 2014 (79 FR 57143),
the NRC published for public comment
the proposed SRP Section 17.5, ‘‘Quality
Assurance Program Description—Design
Certification, Early Site Permit and New
License Applicants,’’ in Chapter 17,
‘‘Quality Assurance,’’ of NUREG–0800.
The staff received a total of nine
comments on the draft section. A
summary of the comments and the
staff’s disposition of the comments are
available in a separate document,
‘‘Response to Public Comments on Draft
Standard Review Plan, Section 17.5,
Quality Assurance Program
Description—Design Certification, Early
Site Permit and New License
Applicants’’ (ADAMS Accession No.
ML15037A303).
II. Backfitting and Issue Finality
The SRP Section 17.5 provides
guidance to the staff for reviewing
applications for a construction permit
and an operating license under part 50
of Title 10 of the Code of Federal
Regulations (10 CFR), ‘‘Domestic
Licensing of Production and Utilization
Facilities,’’ with respect to compliance
VerDate Sep<11>2014
17:18 Sep 04, 2015
Jkt 235001
with the ‘‘Quality Assurance Program
Description Design—Certification, Early
Site Permit and New License
Applicants,’’ 10 CFR 50.65 and the
guidance in Nuclear Management and
Resources Council 93–01 as approved
for use by the NRC in Regulatory Guide
1.160, ‘‘Monitoring the Effectiveness of
Maintenance at Nuclear Power Plants,’’
SRP Section 17.5 also provides guidance
for reviewing an application for a
standard design approval, a standard
design certification, a combined license,
and a manufacturing license under 10
CFR part 52, ‘‘Licenses, Certifications,
and Approvals for Nuclear Power
Plants,’’ with respect to those same
subject matters.
Issuance of this SRP section revision
does not constitute backfitting as
defined in 10 CFR 50.109 (the Backfit
Rule) nor is it inconsistent with the
issue finality provisions in 10 CFR part
52. The NRC’s position is based upon
the following considerations.
1. The SRP positions would not
constitute backfitting, inasmuch as the
SRP is internal guidance to NRC staff.
The SRP provides internal guidance
to the NRC staff on how to review an
application for NRC regulatory approval
in the form of licensing. Changes in
internal staff guidance are not matters
for which either nuclear power plant
applicants or licensees are protected
under either the Backfit Rule or the
issue finality provisions of 10 CFR part
52.
2. The NRC staff has no intention to
impose the SRP positions on existing
licensees either now or in the future.
The NRC staff does not intend to
impose or apply the positions described
in the SRP to existing licenses and
regulatory approvals. Hence, the
issuance of this SRP—even if
considered guidance within the purview
of the issue finality provisions in 10
CFR part 52—does not need to be
evaluated as if it were a backfit or as
being inconsistent with issue finality
provisions. If, in the future, the NRC
staff seeks to impose a position in the
SRP on holders of already issued
licenses in a manner that does not
provide issue finality as described in the
applicable issue finality provision, then
the staff must make the showing as set
forth in the Backfit Rule or address the
criteria for avoiding issue finality as
described in the applicable issue finality
provision.
3. Backfitting and issue finality do
not—with limited exceptions not
applicable here—protect current or
future applicants.
Applicants and potential applicants
are not, with certain exceptions,
protected by either the Backfit Rule or
PO 00000
Frm 00145
Fmt 4703
Sfmt 4703
53903
any issue finality provisions under 10
CFR part 52. Neither the Backfit Rule
nor the issue finality provisions under
10 CFR part 52—with certain
exclusions—were intended to apply to
every NRC action that substantially
changes the expectations of current and
future applicants.
The exceptions to the general
principle are applicable whenever an
applicant references a 10 CFR part 52
license (e.g., an early site permit) or
NRC regulatory approval (e.g., a design
certification rule) with specified issue
finality provisions. The NRC staff does
not, at this time, intend to impose the
positions represented in the SRP in a
manner that is inconsistent with any
issue finality provisions. If, in the
future, the staff seeks to impose a
position in the SRP section in a manner
that does not provide issue finality as
described in the applicable issue finality
provision, then the staff must address
the criteria for avoiding issue finality as
described in the applicable issue finality
provision.
III. Congressional Review Act
This action is a rule as defined in the
Congressional Review Act (5 U.S.C.
801–808). However, the Office of
Management and Budget has not found
it to be a major rule as defined in the
Congressional Review Act.
Dated at Rockville, Maryland, this 28th day
of August, 2015.
For the Nuclear Regulatory Commission.
Carolyn Lauron,
Acting Chief, New Reactor Rulemaking and
Guidance Branch, Division of Advanced
Reactors and Rulemaking, Office of New
Reactors.
[FR Doc. 2015–22555 Filed 9–4–15; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket No. CP2015–133; Order No. 2692]
New Postal Product
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing concerning
an additional Global Expedited Package
Services 3 negotiated service agreement.
This notice informs the public of the
filing, invites public comment, and
takes other administrative steps.
DATES: Comments are due: September 9,
2015.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
SUMMARY:
E:\FR\FM\08SEN1.SGM
08SEN1
Agencies
[Federal Register Volume 80, Number 173 (Tuesday, September 8, 2015)]
[Notices]
[Pages 53902-53903]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-22555]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2014-0204]
Quality Assurance Program Description--Design Certification,
Early Site Permit and New License Applicants
AGENCY: Nuclear Regulatory Commission.
ACTION: Standard review plan-final section; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a
final revision to NUREG-0800, ``Standard Review Plan for the Review of
Safety Analysis Reports for Nuclear Power Plants: LWR Edition,''
Section 17.5, ``Quality Assurance Program Description--Design
Certification, Early Site Permit and New License Applicants.''
DATES: The effective date of this Standard Review Plan (SRP) update is
October 8, 2015.
ADDRESSES: Please refer to Docket ID NRC-2014-0204 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2014-0204. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
[[Page 53903]]
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it available in
ADAMS) is provided the first time that a document is referenced. The
final revision for Standard Review Plan (SRP) Section 17.5, ``Quality
Assurance Program Description--Design Certification, Early Site Permit
and New License Applicants,'' is available in ADAMS under Accession No.
ML15037A441.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
The NRC posts its issued staff guidance on the NRC's
external Web page (https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/).
FOR FURTHER INFORMATION CONTACT: Mark Notich, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3053; email: Mark.Notich@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Background
On September 24, 2014 (79 FR 57143), the NRC published for public
comment the proposed SRP Section 17.5, ``Quality Assurance Program
Description--Design Certification, Early Site Permit and New License
Applicants,'' in Chapter 17, ``Quality Assurance,'' of NUREG-0800. The
staff received a total of nine comments on the draft section. A summary
of the comments and the staff's disposition of the comments are
available in a separate document, ``Response to Public Comments on
Draft Standard Review Plan, Section 17.5, Quality Assurance Program
Description--Design Certification, Early Site Permit and New License
Applicants'' (ADAMS Accession No. ML15037A303).
II. Backfitting and Issue Finality
The SRP Section 17.5 provides guidance to the staff for reviewing
applications for a construction permit and an operating license under
part 50 of Title 10 of the Code of Federal Regulations (10 CFR),
``Domestic Licensing of Production and Utilization Facilities,'' with
respect to compliance with the ``Quality Assurance Program Description
Design--Certification, Early Site Permit and New License Applicants,''
10 CFR 50.65 and the guidance in Nuclear Management and Resources
Council 93-01 as approved for use by the NRC in Regulatory Guide 1.160,
``Monitoring the Effectiveness of Maintenance at Nuclear Power
Plants,'' SRP Section 17.5 also provides guidance for reviewing an
application for a standard design approval, a standard design
certification, a combined license, and a manufacturing license under 10
CFR part 52, ``Licenses, Certifications, and Approvals for Nuclear
Power Plants,'' with respect to those same subject matters.
Issuance of this SRP section revision does not constitute
backfitting as defined in 10 CFR 50.109 (the Backfit Rule) nor is it
inconsistent with the issue finality provisions in 10 CFR part 52. The
NRC's position is based upon the following considerations.
1. The SRP positions would not constitute backfitting, inasmuch as
the SRP is internal guidance to NRC staff.
The SRP provides internal guidance to the NRC staff on how to
review an application for NRC regulatory approval in the form of
licensing. Changes in internal staff guidance are not matters for which
either nuclear power plant applicants or licensees are protected under
either the Backfit Rule or the issue finality provisions of 10 CFR part
52.
2. The NRC staff has no intention to impose the SRP positions on
existing licensees either now or in the future.
The NRC staff does not intend to impose or apply the positions
described in the SRP to existing licenses and regulatory approvals.
Hence, the issuance of this SRP--even if considered guidance within the
purview of the issue finality provisions in 10 CFR part 52--does not
need to be evaluated as if it were a backfit or as being inconsistent
with issue finality provisions. If, in the future, the NRC staff seeks
to impose a position in the SRP on holders of already issued licenses
in a manner that does not provide issue finality as described in the
applicable issue finality provision, then the staff must make the
showing as set forth in the Backfit Rule or address the criteria for
avoiding issue finality as described in the applicable issue finality
provision.
3. Backfitting and issue finality do not--with limited exceptions
not applicable here--protect current or future applicants.
Applicants and potential applicants are not, with certain
exceptions, protected by either the Backfit Rule or any issue finality
provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue
finality provisions under 10 CFR part 52--with certain exclusions--were
intended to apply to every NRC action that substantially changes the
expectations of current and future applicants.
The exceptions to the general principle are applicable whenever an
applicant references a 10 CFR part 52 license (e.g., an early site
permit) or NRC regulatory approval (e.g., a design certification rule)
with specified issue finality provisions. The NRC staff does not, at
this time, intend to impose the positions represented in the SRP in a
manner that is inconsistent with any issue finality provisions. If, in
the future, the staff seeks to impose a position in the SRP section in
a manner that does not provide issue finality as described in the
applicable issue finality provision, then the staff must address the
criteria for avoiding issue finality as described in the applicable
issue finality provision.
III. Congressional Review Act
This action is a rule as defined in the Congressional Review Act (5
U.S.C. 801-808). However, the Office of Management and Budget has not
found it to be a major rule as defined in the Congressional Review Act.
Dated at Rockville, Maryland, this 28th day of August, 2015.
For the Nuclear Regulatory Commission.
Carolyn Lauron,
Acting Chief, New Reactor Rulemaking and Guidance Branch, Division of
Advanced Reactors and Rulemaking, Office of New Reactors.
[FR Doc. 2015-22555 Filed 9-4-15; 8:45 am]
BILLING CODE 7590-01-P