North Anna Power Station, Units 1 and 2; Virginia Electric and Power Company, 53591-53592 [2015-22048]
Download as PDF
Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket, which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, or the presiding
officer. Participants are requested not to
include personal privacy information,
such as social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
If a person other than the licensee
requests a hearing, that person shall set
forth with particularity the manner in
which his interest is adversely affected
by this Order and shall address the
criteria set forth in 10 CFR paragraphs
2.309(d) and (f).
In the absence of any request for
hearing, or written approval of an
extension of time in which to request a
hearing, the provisions specified in
Section IV above shall be final 20 days
from the date of this Order without
further order or proceedings. If an
extension of time for requesting a
hearing has been approved, the
provisions specified in Section IV shall
be final when the extension expires if a
hearing request has not been received.
Dated at Rockville, Maryland this 10th day of
August, 2015.
For the Nuclear Regulatory Commission.
Catherine Haney, Director,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 2015–21937 Filed 9–3–15; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
16:57 Sep 03, 2015
Jkt 235001
[Docket Nos. 50–338 and 50–339; NRC–
2012–0258; License Nos.: NPF–4 and NPF–
7]
North Anna Power Station, Units 1 and
2; Virginia Electric and Power
Company
Nuclear Regulatory
Commission.
ACTION: Director’s Decision under 10
CFR 2.206; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC or the Commission)
is giving notice that the Director of the
Office of Nuclear Reactor Regulation has
issued a final Director’s Decision with
regard to a petition dated October 20,
2011, filed by Paul Gunter et al, herein
referred to as ‘‘the petitioners.’’
DATES: September 4, 2015.
ADDRESSES: Please refer to Docket ID
NRC–2012–0258 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0258. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to PDR.Resource@nrc.gov. The
ADAMS accession number for each
document (if that document is available
in ADAMS) is provided the first time
that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: V.
Sreenivas, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–2597; email:
V.Sreenivas@nrc.gov.
SUMMARY:
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
Notice is
hereby given that the Director of the
Office of Nuclear Reactor Regulation has
issued a Director’s Decision with regard
to a petition dated October 20, 2011
(ADAMS Accession No. ML11293A116),
filed by the petitioners. The petition
was supplemented on November 2, 2011
(ADAMS Accession No. ML11308A027)
and December 15, 2011 (ADAMS
Accession No. ML12060A197). The
petition concerns the operation of the
North Anna Power Station, Units 1 and
2 (North Anna 1 and 2), by the Virginia
Electric and Power Company (VEPCO or
the licensee). The petition requested
that the NRC suspend the operating
licenses for North Anna 1 and 2, until
the completion of a set of activities
described in the petition. The petitioner
also requested that a public meeting be
held to discuss this matter in the
Washington, DC area.
As the basis for the October 20, 2011,
request, the petitioner raised several
concerns, of which 12 were accepted for
review by the NRC staff by letter dated
March 16, 2012 (ADAMS Accession No.
ML12060A090). These summarized as
follows:
(1) Prior to the approval of restart for
North Anna 1 and 2, after the
earthquake of August 23, 2011, Virginia
Electric and Power Company (the
licensee) should be required to obtain a
license amendment from the NRC that
reanalyzes and reevaluates the plant’s
design basis for earthquakes and for
associated necessary retrofits.
(2) Prior to the approval of restart for
North Anna 1 and 2, after the
earthquake of August 23, 2011, the
licensee should be required to ensure
that North Anna 1 and 2, are subjected
to thorough inspections of the same
level and rigor.
(3) The licensee should be required to
reanalyze and reevaluate the North
Anna Independent Spent Fuel Storage
Installation (lSFSI) due to damage
caused by the earthquake of August 23,
2011, and ensure that no threat is posed
to public health and safety by its
operation.
(4) The licensee should ensure the
reliability and accuracy of the seismic
instrumentation at North Anna 1 and 2.
(5) The NRC staff made hasty
decisions about the restart of North
Anna 1 and 2, and gave priority to
economic considerations. The long-term
action plan was not even complete
before the NRC staff gave authorization
to restart.
(6) Regulatory commitments are an
inadequate regulatory tool for ensuring
that the critical long-term tasks
identified in the NRC staff’s
SUPPLEMENTARY INFORMATION:
NUCLEAR REGULATORY
COMMISSION
53591
E:\FR\FM\04SEN1.SGM
04SEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
53592
Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices
confirmatory action letter dated
November 11, 2011, are completed.
(7) The licensee needs to address the
possibility of both boildown and rapid
draindown events at the North Anna 1
and 2, spent fuel pool.
(8) The long-term storage of spent fuel
in the spent fuel pool at North Anna 1
and 2, and at the North Anna ISFSI
poses challenges to the public health
and safety.
(9) ‘‘Hardened on-site storage’’
strategies for spent fuel should be used
at North Anna 1 and 2.
(10) Concerns exist about the response
of North Anna 1 and 2, to a prolonged
station blackout.
(11) The current emergency
evacuation plans for North Anna 1 and
2, need to be revised to reflect the
possible need to evacuate a larger area
than that identified in the current
emergency planning zone.
(12) Concerns exist about damage to
the structural integrity of the spent fuel
pool structure at North Anna 1 and 2,
as represented on pages 41 and 42 of the
NRC staff’s technical evaluation for the
restart of North Anna 1 and 2, dated
November 11, 2011.
On December 12, 2012 and February
2, 2012, the petitioners and the licensee
met with the NRC staff’s petition review
board (meeting transcripts under
ADAMS Accession Nos. ML12033A025
and ML12047A240), regarding the
petition. These meetings gave the
petitioner and the licensee an
opportunity to provide additional
information and to clarify issues raised
in the petition.
The NRC staff issued a partial DD on
October 19, 2012 (ADAMS Accession
No. ML12262A156). Twelve of the
concerns were accepted for review by
the NRC staff. As detailed in the partial
DD, eight of these concerns were closed.
The remaining four concerns accepted
for review were identified as those that
may take longer than the target
timeframe for reaching a decision on a
petition based on the fact they were
undergoing NRC review as part of the
agency’s response to the Fukushima
event in Japan.
Regarding the four remaining
concerns, the NRC staff sent a copy of
the proposed DD to the Petitioners and
to the licensee for comment on April 17,
2015 (ADAMS Accession Nos.
ML14311A616 and ML15061A133,
respectively). The Petitioners provided
comments in a response dated May 18,
2015 (ADAMS Accession No.
ML15138A277) and the licensee
provided comments in a response dated
May 20, 2015 (ADAMS Accession No.
ML15147A517). The comments and the
VerDate Sep<11>2014
16:57 Sep 03, 2015
Jkt 235001
NRC staff’s response to them are
included with this director’s decision.
The Director of the Office of Nuclear
Reactor Regulation has determined that
the request to suspend the operating
licenses for North Anna 1 and 2, until
the completion of a set of activities
described in the petition, be partially
granted and partially denied. The
reasons for this decision are explained
in the director’s decision DD–15–09
pursuant to Section 2.206 of Title 10 of
the Code of Federal Regulations (10
CFR) of the Commission’s regulations.
The NRC will file a copy of the
director’s decision with the Secretary of
the Commission for the Commission’s
review in accordance with 10 CFR
2.206. As provided for by this
regulation, the director’s decision will
constitute the final action of the
Commission 25 days after the date of the
decision, unless the Commission, on its
own motion, institutes a review of the
director’s decision in that time.
Dated at Rockville, Maryland, this 21st day
of August, 2015.
For the Nuclear Regulatory Commission.
Michele G. Evans,
Acting Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2015–22048 Filed 9–3–15; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. IC–31800]
Notice of Applications for
Deregistration Under Section 8(f) of the
Investment Company Act of 1940
August 28, 2015.
The following is a notice of
applications for deregistration under
section 8(f) of the Investment Company
Act of 1940 for the month of August
2015. A copy of each application may be
obtained via the Commission’s Web site
by searching for the file number, or for
an applicant using the Company name
box, at https://www.sec.gov/search/
search.htm or by calling (202) 551–
8090. An order granting each
application will be issued unless the
SEC orders a hearing. Interested persons
may request a hearing on any
application by writing to the SEC’s
Secretary at the address below and
serving the relevant applicant with a
copy of the request, personally or by
mail. Hearing requests should be
received by the SEC by 5:30 p.m. on
September 22, 2015, and should be
accompanied by proof of service on
applicants, in the form of an affidavit or,
for lawyers, a certificate of service.
PO 00000
Frm 00108
Fmt 4703
Sfmt 4703
Pursuant to Rule 0–5 under the Act,
hearing requests should state the nature
of the writer’s interest, any facts bearing
upon the desirability of a hearing on the
matter, the reason for the request, and
the issues contested. Persons who wish
to be notified of a hearing may request
notification by writing to the
Commission’s Secretary.
ADDRESSES: The Commission: Brent J.
Fields, Secretary, U.S. Securities and
Exchange Commission, 100 F Street NE.,
Washington, DC 20549–1090.
FOR FURTHER INFORMATION CONTACT:
Chief Counsel’s Office at (202) 551–
6821, SEC, Division of Investment
Management, Chief Counsel’s Office,
100 F Street NE., Washington, DC
20549–8010.
Cornerstone Progressive Return Fund
[File No. 811–22066]
Summary: Applicant, a closed-end
investment company, seeks an order
declaring that it has ceased to be an
investment company. Applicant
transferred its assets to Cornerstone
Strategic Value Fund, Inc., and on June
26, 2015, made a distribution to its
shareholders based on net asset value.
Expenses of $335,585 incurred in
connection with the reorganization were
paid by applicant and the acquiring
fund.
Filing Dates: The application was
filed on June 30, 2015, and amended on
July 30, 2015.
Applicant’s Address: 48 Wall St.,
22nd Floor, New York, NY 10005.
db-X Exchange-Traded Funds Inc. [File
No. 811–22001]
Summary: Applicant seeks an order
declaring that it has ceased to be an
investment company. On May 27, 2015,
applicant made a liquidating
distribution to its shareholders, based
on net asset value. Expenses of $35,000
incurred in connection with the
liquidation were paid by DBX Strategic
Advisors LLC, applicant’s investment
adviser.
Filing Date: The application was filed
on July 31, 2015.
Applicant’s Address: 60 Wall St., New
York, NY 10005.
Principled Equity Market Fund [File
No. 811–8492]
Summary: Applicant, a closed-end
investment company, seeks an order
declaring that it has ceased to be an
investment company. On August 5,
2015, applicant made a final liquidating
distribution to its shareholders, based
on net asset value. Two shareholders of
record have not received their
liquidating distributions because
applicant has been unable to locate
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 80, Number 172 (Friday, September 4, 2015)]
[Notices]
[Pages 53591-53592]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-22048]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-338 and 50-339; NRC-2012-0258; License Nos.: NPF-4 and
NPF-7]
North Anna Power Station, Units 1 and 2; Virginia Electric and
Power Company
AGENCY: Nuclear Regulatory Commission.
ACTION: Director's Decision under 10 CFR 2.206; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission)
is giving notice that the Director of the Office of Nuclear Reactor
Regulation has issued a final Director's Decision with regard to a
petition dated October 20, 2011, filed by Paul Gunter et al, herein
referred to as ``the petitioners.''
DATES: September 4, 2015.
ADDRESSES: Please refer to Docket ID NRC-2012-0258 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0258. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number
for each document (if that document is available in ADAMS) is provided
the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: V. Sreenivas, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-2597; email: V.Sreenivas@nrc.gov.
SUPPLEMENTARY INFORMATION: Notice is hereby given that the Director of
the Office of Nuclear Reactor Regulation has issued a Director's
Decision with regard to a petition dated October 20, 2011 (ADAMS
Accession No. ML11293A116), filed by the petitioners. The petition was
supplemented on November 2, 2011 (ADAMS Accession No. ML11308A027) and
December 15, 2011 (ADAMS Accession No. ML12060A197). The petition
concerns the operation of the North Anna Power Station, Units 1 and 2
(North Anna 1 and 2), by the Virginia Electric and Power Company (VEPCO
or the licensee). The petition requested that the NRC suspend the
operating licenses for North Anna 1 and 2, until the completion of a
set of activities described in the petition. The petitioner also
requested that a public meeting be held to discuss this matter in the
Washington, DC area.
As the basis for the October 20, 2011, request, the petitioner
raised several concerns, of which 12 were accepted for review by the
NRC staff by letter dated March 16, 2012 (ADAMS Accession No.
ML12060A090). These summarized as follows:
(1) Prior to the approval of restart for North Anna 1 and 2, after
the earthquake of August 23, 2011, Virginia Electric and Power Company
(the licensee) should be required to obtain a license amendment from
the NRC that reanalyzes and reevaluates the plant's design basis for
earthquakes and for associated necessary retrofits.
(2) Prior to the approval of restart for North Anna 1 and 2, after
the earthquake of August 23, 2011, the licensee should be required to
ensure that North Anna 1 and 2, are subjected to thorough inspections
of the same level and rigor.
(3) The licensee should be required to reanalyze and reevaluate the
North Anna Independent Spent Fuel Storage Installation (lSFSI) due to
damage caused by the earthquake of August 23, 2011, and ensure that no
threat is posed to public health and safety by its operation.
(4) The licensee should ensure the reliability and accuracy of the
seismic instrumentation at North Anna 1 and 2.
(5) The NRC staff made hasty decisions about the restart of North
Anna 1 and 2, and gave priority to economic considerations. The long-
term action plan was not even complete before the NRC staff gave
authorization to restart.
(6) Regulatory commitments are an inadequate regulatory tool for
ensuring that the critical long-term tasks identified in the NRC
staff's
[[Page 53592]]
confirmatory action letter dated November 11, 2011, are completed.
(7) The licensee needs to address the possibility of both boildown
and rapid draindown events at the North Anna 1 and 2, spent fuel pool.
(8) The long-term storage of spent fuel in the spent fuel pool at
North Anna 1 and 2, and at the North Anna ISFSI poses challenges to the
public health and safety.
(9) ``Hardened on-site storage'' strategies for spent fuel should
be used at North Anna 1 and 2.
(10) Concerns exist about the response of North Anna 1 and 2, to a
prolonged station blackout.
(11) The current emergency evacuation plans for North Anna 1 and 2,
need to be revised to reflect the possible need to evacuate a larger
area than that identified in the current emergency planning zone.
(12) Concerns exist about damage to the structural integrity of the
spent fuel pool structure at North Anna 1 and 2, as represented on
pages 41 and 42 of the NRC staff's technical evaluation for the restart
of North Anna 1 and 2, dated November 11, 2011.
On December 12, 2012 and February 2, 2012, the petitioners and the
licensee met with the NRC staff's petition review board (meeting
transcripts under ADAMS Accession Nos. ML12033A025 and ML12047A240),
regarding the petition. These meetings gave the petitioner and the
licensee an opportunity to provide additional information and to
clarify issues raised in the petition.
The NRC staff issued a partial DD on October 19, 2012 (ADAMS
Accession No. ML12262A156). Twelve of the concerns were accepted for
review by the NRC staff. As detailed in the partial DD, eight of these
concerns were closed. The remaining four concerns accepted for review
were identified as those that may take longer than the target timeframe
for reaching a decision on a petition based on the fact they were
undergoing NRC review as part of the agency's response to the Fukushima
event in Japan.
Regarding the four remaining concerns, the NRC staff sent a copy of
the proposed DD to the Petitioners and to the licensee for comment on
April 17, 2015 (ADAMS Accession Nos. ML14311A616 and ML15061A133,
respectively). The Petitioners provided comments in a response dated
May 18, 2015 (ADAMS Accession No. ML15138A277) and the licensee
provided comments in a response dated May 20, 2015 (ADAMS Accession No.
ML15147A517). The comments and the NRC staff's response to them are
included with this director's decision.
The Director of the Office of Nuclear Reactor Regulation has
determined that the request to suspend the operating licenses for North
Anna 1 and 2, until the completion of a set of activities described in
the petition, be partially granted and partially denied. The reasons
for this decision are explained in the director's decision DD-15-09
pursuant to Section 2.206 of Title 10 of the Code of Federal
Regulations (10 CFR) of the Commission's regulations.
The NRC will file a copy of the director's decision with the
Secretary of the Commission for the Commission's review in accordance
with 10 CFR 2.206. As provided for by this regulation, the director's
decision will constitute the final action of the Commission 25 days
after the date of the decision, unless the Commission, on its own
motion, institutes a review of the director's decision in that time.
Dated at Rockville, Maryland, this 21st day of August, 2015.
For the Nuclear Regulatory Commission.
Michele G. Evans,
Acting Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-22048 Filed 9-3-15; 8:45 am]
BILLING CODE 7590-01-P