Blue River Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 53511-53512 [2015-21987]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices
responded and agreed with
Reclamation’s jurisdictional decision
over hydropower development at the
Boise Project’s Anderson Ranch dam,
powerhouse, and reservoir. However,
the Commission would retain
jurisdiction for hydropower facilities
that would be located outside of
Reclamation’s development. Thus, an
entity seeking to build a hydropower
project that would use Reclamation’s
Boise Project facilities would need to
obtain a lease of power privilege from
Reclamation, but it also would need to
obtain a license from the Commission
for those facilities of the hydropower
project that are not under Reclamation’s
jurisdiction.
On July 27, 2015, Owyhee Hydro filed
a revised application providing an
additional alternative to the proposed
Anderson Ranch project. The revised
Anderson Ranch project has three
alternatives: Alternatives A, B, and C.
Alternatives A and B would use the
existing Anderson Ranch dam,
reservoir, powerhouse, tailrace, and
transmission lines, and would consist of
the following new facilities: (1) A 1,060foot-long, 65-foot-high zoned earth or
concrete faced rockfill dam; (2) a 900acre-foot impoundment as an upper
reservoir; (3) a 4,180-foot-long, 9.1-footdiameter single steel penstock (6.5-footdiameter if twin conduit); (4) a single
80-megawatt (MW) reversible pump
turbine/generator to be located within
the third bay of the existing
powerhouse; and (5) appurtenant
facilities. Alternative C would use the
existing Anderson Ranch dam,
reservoir, and powerhouse, and would
consist of the same new facilities as in
Alternatives A and B except it would
have: (1) A 4,180-foot-long, 9.1-footdiameter single steel penstock (6.5-footdiameter if twin conduit) and a 3,440foot-long, 9.1-foot-diameter single steel
penstock (6.5-foot-diameter if twin
conduit); (2) a 250-foot-long, 90-footwide concrete powerhouse located
adjacent to the existing Anderson Ranch
reservoir; (3) a single 80–MW Pelton
turbine/generator; and (4) a 3,400-footlong, 69 or 115-kilovolt transmission
line interconnecting with the existing
Bonneville Power Administration Dixie
Substation. The estimated annual
generation for the Anderson Ranch
project would be 175.2 gigawatt-hours.
Applicant Contact for the Anderson
Ranch project: Mr. Matthew Shapiro,
Owyhee Hydro, LLC, 1210 W. Franklin
St., Ste. 2, Boise, ID 83702; phone: (208)
246–9925.
FERC Contact: Karen Sughrue; phone:
(202) 502–8556.
Deadline for filing comments, motions
to intervene, competing applications
VerDate Sep<11>2014
16:57 Sep 03, 2015
Jkt 235001
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14648–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14648) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21984 Filed 9–3–15; 8:45 am]
BILLING CODE 6717–0–1P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14690–000]
Blue River Hydro Power, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On July 1, 2015, Blue River Hydro
Power, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Blue River Hydroelectric Project (Blue
River Project or project) to be located at
Blue River Dam near the Town of Blue
River in Lane County, Oregon. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
53511
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would utilize
flows at the existing Blue River Dam,
and would consist of the following new
features: (1) A 12-foot-diameter, 500foot-long steel liner pipe installed in the
downstream portion of the existing dam
outlet tunnel, (2) a gatehouse containing
two 7-foot-wide, 8-foot-high steel
slidegates to regulate pipe pressure and
release excess water, (3) a 9-foot- to 12foot-diameter, 600-foot-long steel
penstock, (4) a 70-foot-wide, 55-footlong reinforced concrete powerhouse,
(5) two 10 megawatt vertical-shaft
Francis turbine/generators, (6) an
approximately 40-foot-wide, 40-footlong concrete tailrace returning flows to
the Blue River, (7) a switchyard and a
2.5-mile-long, 12.5-kilovolt buried
transmission line interconnecting with
Lane Electric Cooperative’s existing
Blue River substation, and (8)
appurtenant facilities. The estimated
annual generation of the Blue River
Project would be 50 gigawatt-hours.
Applicant Contact: Mr. Rett Hubbard,
Blue River Hydro Power, LLC, 285 East
Oregon Avenue, Suite 7, Creswell,
Oregon 97426; phone: (541) 632–4706.
FERC Contact: Sean O’Neill; phone:
(202) 502–6462.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14690–000.
More information about this project,
including a copy of the application, can
E:\FR\FM\04SEN1.SGM
04SEN1
53512
Federal Register / Vol. 80, No. 172 / Friday, September 4, 2015 / Notices
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14690) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21987 Filed 9–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–96–000]
Backyard Farms Energy LLC,
Devonshire Energy LLC: Notice of
Petition for Declaratory Order
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that on August 27, 2015,
in accordance with section 35.42(a)(2) of
the regulations of the Federal Energy
Regulatory Commission (Commission),
18 CFR 35.42(a)(2), Order No. 652,1 and
Order No. 697,2 Backyard Farms Energy
LLC and Devonshire Energy LLC (MBR
Entities), filed a petition for declaratory
order requesting that the Commission
find that the MBR Entities are not
affiliates of or under ‘‘common control’’
with the Fidelity Accounts or FIL
Limited (FIL), or, in the alternative, that
even if such an affiliation is deemed to
exist, investments by the Fidelity
Accounts or FIL would not affect the
conditions relied upon by the
Commission when granting marketbased rate authorization to the extent
such investments are passive
investments, as more fully described in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
1 Reporting Requirement for Changes in Status for
Public Utilities With Market-Based Rate Authority,
Order No. 652, 70 FR 8253 (Feb. 18, 2005), reh’g,
111 FERC ¶ 61,413 (2005).
2 Market-Based Rates for Wholesale Sales of
Electric Energy, Capacity and Ancillary Services by
Public Utilities, Order No. 697, 72 FR 39904 (July
20, 2007), clarified, 72 FR 72239 (Dec. 20, 2007),
reh’g, Order No. 697–A, 73 FR 25832 (May 7, 2008)
(‘‘Order No. 697–A’’), reh’g, 124 FERC ¶ 61,055
(2008), reh’g, Order No. 697–B, 73 FR 79610 (Dec.
30, 2008), reh’g, Order No. 697–C, 74 FR 30924
(June 29, 2009), reh’g, Order No. 697–D, 57 FR
14342 (March 25, 2010), clarified 131 FERC ¶
61,021 (2010), reh’g denied, 134 FERC ¶ 61,046
(2011), reh’g denied, 143 FERC ¶ 61,126 (2013).
VerDate Sep<11>2014
16:57 Sep 03, 2015
Jkt 235001
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on September 28, 2015.
Dated: August 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21983 Filed 9–3–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9933–59–Region 5]
Proposed Prospective Purchaser
Agreement for the Delco Chassis
Industrial Land I & II Site in Livonia,
Michigan
Environmental Protection
Agency (EPA).
ACTION: Notice; request for public
comment.
AGENCY:
In accordance with the
Prospective Purchaser Agreement,
notice is hereby given of a proposed
administrative settlement concerning a
portion of the Delco Chassis Industrial
Land I & II Site in Livonia, Michigan
with the following settling party:
Livonia West Commerce Center, LLC.
The settlement requires the Settling
Party to provide access to the Property,
exercise due care with respect to
existing contamination, and, if
SUMMARY:
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
necessary, execute and record a
Declaration of Restrictive Covenant. The
settlement includes a covenant not to
sue the Settling Party pursuant to the
Comprehensive Environmental
Response, Compensation, and Liability
Act or the Resource Conservation and
Recovery Act with respect to the
Existing Contamination. Existing
Contamination is defined as any
hazardous substances, pollutants, or
contaminants or Waste Material present
or existing on or under the Property as
of the Effective Date of the Settlement
Agreement; any hazardous substances,
pollutants, or contaminants or Waste
Material that migrated from the Property
prior to the Effective Date of the
Settlement Agreement; and any
hazardous substances, pollutants, or
contaminants or Waste Material
presently at the Site that migrates onto,
on, under, or from the Property after the
Effective Date of the Settlement
Agreement.
For thirty (30) days following the date
of publication of this notice, the Agency
will receive written comments relating
to the settlement. The Agency will
consider all comments received and
may modify or withdraw its consent to
the settlement if comments received
disclose facts or considerations which
indicate that the settlement is
inappropriate, improper, or inadequate.
The Agency’s response to any comments
received will be available for public
inspection at the EPA, Region 5,
Records Center, 77 W. Jackson Blvd.,
7th Fl., Chicago, Illinois 60604.
DATES: Comments must be submitted on
or before October 5, 2015.
ADDRESSES: The proposed settlement is
available for public inspection at the
EPA, Region 5, Records Center, 77 W.
Jackson Blvd., 7th Fl., Chicago, Illinois
60604. A copy of the proposed
settlement may be obtained from Peter
Felitti, Assoc. Regional Counsel, EPA,
Office of Regional Counsel, Region 5, 77
W. Jackson Blvd., Mail Code: C–14J,
Chicago, Illinois 60604. Comments
should reference the Delco Chassis
Industrial Land I & II Site, Livonia,
Michigan and EPA Docket No. V–W–
15–C–024 and should be addressed to
Peter Felitti, Assoc. Regional Counsel,
EPA, Office of Regional Counsel, Region
5, 77 W. Jackson Blvd., Mail Code: C–
14J, Chicago, Illinois 60604.
FOR FURTHER INFORMATION CONTACT:
Peter Felitti, Assoc. Regional Counsel,
EPA, Office of Regional Counsel, Region
5, 77 W. Jackson Blvd., Mail Code: C–
14J, Chicago, Illinois 60604.
SUPPLEMENTARY INFORMATION: The
Settling Party proposes to acquire
ownership of a portion of the former
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 80, Number 172 (Friday, September 4, 2015)]
[Notices]
[Pages 53511-53512]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21987]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14690-000]
Blue River Hydro Power, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On July 1, 2015, Blue River Hydro Power, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Blue River
Hydroelectric Project (Blue River Project or project) to be located at
Blue River Dam near the Town of Blue River in Lane County, Oregon. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would utilize flows at the existing Blue River
Dam, and would consist of the following new features: (1) A 12-foot-
diameter, 500-foot-long steel liner pipe installed in the downstream
portion of the existing dam outlet tunnel, (2) a gatehouse containing
two 7-foot-wide, 8-foot-high steel slidegates to regulate pipe pressure
and release excess water, (3) a 9-foot- to 12-foot-diameter, 600-foot-
long steel penstock, (4) a 70-foot-wide, 55-foot-long reinforced
concrete powerhouse, (5) two 10 megawatt vertical-shaft Francis
turbine/generators, (6) an approximately 40-foot-wide, 40-foot-long
concrete tailrace returning flows to the Blue River, (7) a switchyard
and a 2.5-mile-long, 12.5-kilovolt buried transmission line
interconnecting with Lane Electric Cooperative's existing Blue River
substation, and (8) appurtenant facilities. The estimated annual
generation of the Blue River Project would be 50 gigawatt-hours.
Applicant Contact: Mr. Rett Hubbard, Blue River Hydro Power, LLC,
285 East Oregon Avenue, Suite 7, Creswell, Oregon 97426; phone: (541)
632-4706.
FERC Contact: Sean O'Neill; phone: (202) 502-6462.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14690-000.
More information about this project, including a copy of the
application, can
[[Page 53512]]
be viewed or printed on the ``eLibrary'' link of Commission's Web site
at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-14690) in the docket number field to access the document. For
assistance, contact FERC Online Support.
Dated: August 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-21987 Filed 9-3-15; 8:45 am]