Notice of Application for Amendment of Licenses To Incorporate Interim Fish Passage Plan and Soliciting Comments, Motions To Intervene and Protests, 53148-53149 [2015-21712]

Download as PDF 53148 Federal Register / Vol. 80, No. 170 / Wednesday, September 2, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–2529–000] Censtar Energy Corp.; Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Censtar Energy Corp.’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 16, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 27, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–21710 Filed 9–1–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–2078–001. Applicants: Talen Energy Marketing, LLC. Description: Tariff Amendment: Amendment to Notice of Succession to Reactive Tariff to be effective 6/30/2015. Filed Date: 8/26/15. Accession Number: 20150826–5179. Comments Due: 5 p.m. ET 9/16/15. Docket Numbers: ER15–2531–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 2179 Sunflower to ITC Great Plains Novation Cancellation to be effective 8/10/2015. Filed Date: 8/26/15. Accession Number: 20150826–5135. Comments Due: 5 p.m. ET 9/16/15. Docket Numbers: ER15–2532–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: 2180 Mid-Kansas to ITC Great Plains Novation Cancellation to be effective 8/10/2015. Filed Date: 8/26/15. Accession Number: 20150826–5136. Comments Due: 5 p.m. ET 9/16/15. Docket Numbers: ER15–2533–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) Rate Filing: 2015–08–26_SA 2831 ITCTransmission-Geronimo Huron Wind GIA (J340) to be effective 10/25/ 2015. Filed Date: 8/26/15. Accession Number: 20150826–5190. Comments Due: 5 p.m. ET 9/16/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 26, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–21750 Filed 9–1–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Amendment of Licenses To Incorporate Interim Fish Passage Plan and Soliciting Comments, Motions To Intervene and Protests Brookfield White Pine Hydro, LLC .............................................................................................................................. mstockstill on DSK4VPTVN1PROD with NOTICES Merimil Limited Partnership ........................................................................................................................................ Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: VerDate Sep<11>2014 19:04 Sep 01, 2015 Jkt 235001 a. Application Type: Amendment of Licenses. b. Project Nos: 2322–054, 2325–077, and 2574–069, 2574–075. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 Project Project Project Project No. No. No. No. 2322–054 2325–077 2574–069 2574–075 c. Date Filed: February 21, 2013 and March 29, 2013. d. Applicant: Brookfield White Pine Hydro, LLC and Merimil Limited Partnership. E:\FR\FM\02SEN1.SGM 02SEN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 170 / Wednesday, September 2, 2015 / Notices e. Name of Projects: Shawmut, Weston, and Lockwood Projects. f. Location: The Shawmut, Weston, and Lockwood Projects are located on the Kennebec River at river miles 66, 82 and 63, respectively, in Kennebec and Somerset counties, Maine. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Kevin Bernier, 26 Katherine Dr. Hallowell, ME 04347, (207) 723–4341. i. FERC Contact: Mr. Mark Pawlowski (202) 502–6052, mark.pawlowski@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 26, 2015. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project numbers (P–2322, P–2325, and P–2574, as needed) on any comments, motions, or recommendations filed. k. Description of Request: Brookfield White Pine Hydro LLC, licensee for the Shawmut (P–2322) and Weston Projects (P–2325), and Merimil Limited Partnership, licensee for the Lockwood Project (P–2574), request Commission approval to amend the licenses for these projects to incorporate the provisions of an Interim Species Protection Plan (ISPP) for Atlantic salmon. Under the proposed ISPP, the licensees would identify and conduct studies of existing upstream and downstream fish passage facilities used for Atlantic salmon with the goal of identifying potential enhancement measures to improve fish passage facilities at the above projects. In addition, the proposed ISPP includes an addendum with handling procedures to protect Atlantic and shortnose sturgeon at the Lockwood Project (P–2325). l. Locations of the Application: A copy of each application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling VerDate Sep<11>2014 19:04 Sep 01, 2015 Jkt 235001 202–502–8371. These filings may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call 202–502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 53149 to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: August 27, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–21712 Filed 9–1–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–174–000. Applicants: Biofuels Washington, LLC. Description: Supplement to July 22, 2015 Application Under FPA Section 203 of Biofuels Washington, LLC. Filed Date: 8/27/15. Accession Number: 20150827–5041. Comments Due: 5 p.m. ET 9/8/15. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2743–006; ER12–637–004; ER12–995–004; ER10– 1892–006; ER10–1886–006; ER10–2793– 006; ER10–2755–007; ER10–2739–010; ER10–1872–006; ER10–1859–006. Applicants: Bluegrass Generation Company, L.L.C., Calhoun Power Company, LLC, Cherokee County Cogeneration Partners, LLC, Columbia Energy LLC, Decatur Energy Center, LLC, DeSoto County Generating Company, LLC, Las Vegas Power Company, LLC, Mobile Energy L L C, Santa Rosa Energy Center, LLC, LS Power Marketing, LLC. Description: Supplement to December 29, 2014 Updated Market Power Analysis in Southeast Region of the LS Power Development, LLC subsidiaries. Filed Date: 8/26/15. Accession Number: 20150826–5236. Comments Due: 5 p.m. ET 9/16/15. Docket Numbers: ER15–33–001. Applicants: The Dayton Power and Light Company. Description: Compliance filing: FERC Rate Schedule No. 303, Village of Lakeview to be effective 1/1/2015. Filed Date: 8/27/15. Accession Number: 20150827–5236. Comments Due: 5 p.m. ET 9/17/15. Docket Numbers: ER15–553–000. Applicants: San Diego Gas & Electric Company. E:\FR\FM\02SEN1.SGM 02SEN1

Agencies

[Federal Register Volume 80, Number 170 (Wednesday, September 2, 2015)]
[Notices]
[Pages 53148-53149]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21712]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application for Amendment of Licenses To Incorporate 
Interim Fish Passage Plan and Soliciting Comments, Motions To Intervene 
and Protests

Brookfield White Pine Hydro, LLC.  Project No. 2322-054
                                   Project No. 2325-077
Merimil Limited Partnership......  Project No. 2574-069
                                   Project No. 2574-075
 

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amendment of Licenses.
    b. Project Nos: 2322-054, 2325-077, and 2574-069, 2574-075.
    c. Date Filed: February 21, 2013 and March 29, 2013.
    d. Applicant: Brookfield White Pine Hydro, LLC and Merimil Limited 
Partnership.

[[Page 53149]]

    e. Name of Projects: Shawmut, Weston, and Lockwood Projects.
    f. Location: The Shawmut, Weston, and Lockwood Projects are located 
on the Kennebec River at river miles 66, 82 and 63, respectively, in 
Kennebec and Somerset counties, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Kevin Bernier, 26 Katherine Dr. Hallowell, ME 
04347, (207) 723-4341.
    i. FERC Contact: Mr. Mark Pawlowski (202) 502-6052, 
mark.pawlowski@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: September 26, 2015.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments.
    Please include the project numbers (P-2322, P-2325, and P-2574, as 
needed) on any comments, motions, or recommendations filed.
    k. Description of Request: Brookfield White Pine Hydro LLC, 
licensee for the Shawmut (P-2322) and Weston Projects (P-2325), and 
Merimil Limited Partnership, licensee for the Lockwood Project (P-
2574), request Commission approval to amend the licenses for these 
projects to incorporate the provisions of an Interim Species Protection 
Plan (ISPP) for Atlantic salmon. Under the proposed ISPP, the licensees 
would identify and conduct studies of existing upstream and downstream 
fish passage facilities used for Atlantic salmon with the goal of 
identifying potential enhancement measures to improve fish passage 
facilities at the above projects. In addition, the proposed ISPP 
includes an addendum with handling procedures to protect Atlantic and 
shortnose sturgeon at the Lockwood Project (P-2325).
    l. Locations of the Application: A copy of each application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling 202-502-8371. These filings may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call 202-502-8659. A copy is also 
available for inspection and reproduction at the address in item (h) 
above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). Agencies may obtain copies of the application directly from 
the applicant. A copy of any protest or motion to intervene must be 
served upon each representative of the applicant specified in the 
particular application. If an intervener files comments or documents 
with the Commission relating to the merits of an issue that may affect 
the responsibilities of a particular resource agency, they must also 
serve a copy of the document on that resource agency. A copy of all 
other filings in reference to this application must be accompanied by 
proof of service on all persons listed in the service list prepared by 
the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.

    Dated: August 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-21712 Filed 9-1-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.