Notice of Application for Amendment of Licenses To Incorporate Interim Fish Passage Plan and Soliciting Comments, Motions To Intervene and Protests, 53148-53149 [2015-21712]
Download as PDF
53148
Federal Register / Vol. 80, No. 170 / Wednesday, September 2, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2529–000]
Censtar Energy Corp.; Supplemental
Notice that Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Censtar
Energy Corp.’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
16, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21710 Filed 9–1–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2078–001.
Applicants: Talen Energy Marketing,
LLC.
Description: Tariff Amendment:
Amendment to Notice of Succession to
Reactive Tariff to be effective 6/30/2015.
Filed Date: 8/26/15.
Accession Number: 20150826–5179.
Comments Due: 5 p.m. ET 9/16/15.
Docket Numbers: ER15–2531–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 2179 Sunflower to ITC Great
Plains Novation Cancellation to be
effective 8/10/2015.
Filed Date: 8/26/15.
Accession Number: 20150826–5135.
Comments Due: 5 p.m. ET 9/16/15.
Docket Numbers: ER15–2532–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 2180 Mid-Kansas to ITC Great
Plains Novation Cancellation to be
effective 8/10/2015.
Filed Date: 8/26/15.
Accession Number: 20150826–5136.
Comments Due: 5 p.m. ET 9/16/15.
Docket Numbers: ER15–2533–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2015–08–26_SA 2831
ITCTransmission-Geronimo Huron
Wind GIA (J340) to be effective 10/25/
2015.
Filed Date: 8/26/15.
Accession Number: 20150826–5190.
Comments Due: 5 p.m. ET 9/16/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 26, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–21750 Filed 9–1–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of Licenses To Incorporate Interim
Fish Passage Plan and Soliciting
Comments, Motions To Intervene and
Protests
Brookfield White Pine Hydro, LLC ..............................................................................................................................
mstockstill on DSK4VPTVN1PROD with NOTICES
Merimil Limited Partnership ........................................................................................................................................
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
VerDate Sep<11>2014
19:04 Sep 01, 2015
Jkt 235001
a. Application Type: Amendment of
Licenses.
b. Project Nos: 2322–054, 2325–077,
and 2574–069, 2574–075.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Project
Project
Project
Project
No.
No.
No.
No.
2322–054
2325–077
2574–069
2574–075
c. Date Filed: February 21, 2013 and
March 29, 2013.
d. Applicant: Brookfield White Pine
Hydro, LLC and Merimil Limited
Partnership.
E:\FR\FM\02SEN1.SGM
02SEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 170 / Wednesday, September 2, 2015 / Notices
e. Name of Projects: Shawmut,
Weston, and Lockwood Projects.
f. Location: The Shawmut, Weston,
and Lockwood Projects are located on
the Kennebec River at river miles 66, 82
and 63, respectively, in Kennebec and
Somerset counties, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kevin Bernier,
26 Katherine Dr. Hallowell, ME 04347,
(207) 723–4341.
i. FERC Contact: Mr. Mark Pawlowski
(202) 502–6052, mark.pawlowski@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 26, 2015.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project numbers
(P–2322, P–2325, and P–2574, as
needed) on any comments, motions, or
recommendations filed.
k. Description of Request: Brookfield
White Pine Hydro LLC, licensee for the
Shawmut (P–2322) and Weston Projects
(P–2325), and Merimil Limited
Partnership, licensee for the Lockwood
Project (P–2574), request Commission
approval to amend the licenses for these
projects to incorporate the provisions of
an Interim Species Protection Plan
(ISPP) for Atlantic salmon. Under the
proposed ISPP, the licensees would
identify and conduct studies of existing
upstream and downstream fish passage
facilities used for Atlantic salmon with
the goal of identifying potential
enhancement measures to improve fish
passage facilities at the above projects.
In addition, the proposed ISPP includes
an addendum with handling procedures
to protect Atlantic and shortnose
sturgeon at the Lockwood Project
(P–2325).
l. Locations of the Application: A
copy of each application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
VerDate Sep<11>2014
19:04 Sep 01, 2015
Jkt 235001
202–502–8371. These filings may also
be viewed on the Commission’s Web
site at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call 202–502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
53149
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21712 Filed 9–1–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–174–000.
Applicants: Biofuels Washington,
LLC.
Description: Supplement to July 22,
2015 Application Under FPA Section
203 of Biofuels Washington, LLC.
Filed Date: 8/27/15.
Accession Number: 20150827–5041.
Comments Due: 5 p.m. ET 9/8/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2743–006;
ER12–637–004; ER12–995–004; ER10–
1892–006; ER10–1886–006; ER10–2793–
006; ER10–2755–007; ER10–2739–010;
ER10–1872–006; ER10–1859–006.
Applicants: Bluegrass Generation
Company, L.L.C., Calhoun Power
Company, LLC, Cherokee County
Cogeneration Partners, LLC, Columbia
Energy LLC, Decatur Energy Center,
LLC, DeSoto County Generating
Company, LLC, Las Vegas Power
Company, LLC, Mobile Energy L L C,
Santa Rosa Energy Center, LLC, LS
Power Marketing, LLC.
Description: Supplement to December
29, 2014 Updated Market Power
Analysis in Southeast Region of the LS
Power Development, LLC subsidiaries.
Filed Date: 8/26/15.
Accession Number: 20150826–5236.
Comments Due: 5 p.m. ET 9/16/15.
Docket Numbers: ER15–33–001.
Applicants: The Dayton Power and
Light Company.
Description: Compliance filing: FERC
Rate Schedule No. 303, Village of
Lakeview to be effective 1/1/2015.
Filed Date: 8/27/15.
Accession Number: 20150827–5236.
Comments Due: 5 p.m. ET 9/17/15.
Docket Numbers: ER15–553–000.
Applicants: San Diego Gas & Electric
Company.
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 80, Number 170 (Wednesday, September 2, 2015)]
[Notices]
[Pages 53148-53149]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21712]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of Licenses To Incorporate
Interim Fish Passage Plan and Soliciting Comments, Motions To Intervene
and Protests
Brookfield White Pine Hydro, LLC. Project No. 2322-054
Project No. 2325-077
Merimil Limited Partnership...... Project No. 2574-069
Project No. 2574-075
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of Licenses.
b. Project Nos: 2322-054, 2325-077, and 2574-069, 2574-075.
c. Date Filed: February 21, 2013 and March 29, 2013.
d. Applicant: Brookfield White Pine Hydro, LLC and Merimil Limited
Partnership.
[[Page 53149]]
e. Name of Projects: Shawmut, Weston, and Lockwood Projects.
f. Location: The Shawmut, Weston, and Lockwood Projects are located
on the Kennebec River at river miles 66, 82 and 63, respectively, in
Kennebec and Somerset counties, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kevin Bernier, 26 Katherine Dr. Hallowell, ME
04347, (207) 723-4341.
i. FERC Contact: Mr. Mark Pawlowski (202) 502-6052,
mark.pawlowski@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: September 26, 2015.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project numbers (P-2322, P-2325, and P-2574, as
needed) on any comments, motions, or recommendations filed.
k. Description of Request: Brookfield White Pine Hydro LLC,
licensee for the Shawmut (P-2322) and Weston Projects (P-2325), and
Merimil Limited Partnership, licensee for the Lockwood Project (P-
2574), request Commission approval to amend the licenses for these
projects to incorporate the provisions of an Interim Species Protection
Plan (ISPP) for Atlantic salmon. Under the proposed ISPP, the licensees
would identify and conduct studies of existing upstream and downstream
fish passage facilities used for Atlantic salmon with the goal of
identifying potential enhancement measures to improve fish passage
facilities at the above projects. In addition, the proposed ISPP
includes an addendum with handling procedures to protect Atlantic and
shortnose sturgeon at the Lockwood Project (P-2325).
l. Locations of the Application: A copy of each application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling 202-502-8371. These filings may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call 202-502-8659. A copy is also
available for inspection and reproduction at the address in item (h)
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). Agencies may obtain copies of the application directly from
the applicant. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. If an intervener files comments or documents
with the Commission relating to the merits of an issue that may affect
the responsibilities of a particular resource agency, they must also
serve a copy of the document on that resource agency. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Dated: August 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-21712 Filed 9-1-15; 8:45 am]
BILLING CODE 6717-01-P