Notice of Public Hearings for the Draft Northern Pass Transmission Line Project Environmental Impact Statement (DOE/EIS-0463), 52268 [2015-21317]
Download as PDF
52268
Federal Register / Vol. 80, No. 167 / Friday, August 28, 2015 / Notices
filed with the Board either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Greg
Simonton at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Greg Simonton at the
address and phone number listed above.
Minutes will also be available at the
following Web site: https://www.portsssab.energy.gov/.
Issued at Washington, DC on August 25,
2015.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2015–21324 Filed 8–27–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. PP–371]
Notice of Public Hearings for the Draft
Northern Pass Transmission Line
Project Environmental Impact
Statement (DOE/EIS–0463)
U.S. Department of Energy.
ACTION: Notice of public hearings.
AGENCY:
The U.S. Department of
Energy (DOE) announces public
hearings to receive comments on the
Draft EIS. The Draft EIS evaluates the
environmental impacts of DOE’s
proposed Federal action of issuing a
Presidential permit to the Applicant:
Northern Pass LLC, to construct,
operate, maintain, and connect a new
electric transmission line across the
U.S./Canada border in northern New
Hampshire.
DATES: Written comments on the Draft
EIS must be received by October 29,
2015. See SUPPLEMENTARY INFORMATION
for the dates and times of the public
hearings.
ADDRESSES: Written comments should
be sent to:
Mr. Brian Mills, Office of Electricity
Delivery and Energy Reliability (OE–
20), U.S. Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585.
Via email to: draftEIScomments@
northernpasseis.us
Lhorne on DSK5TPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
14:19 Aug 27, 2015
Jkt 235001
By facsimile to: (202) 586–8008
Or through the project Web site at:
https://www.northernpasseis.us/
See SUPPLEMENTARY INFORMATION for
the locations of the public hearings.
FOR FURTHER INFORMATION CONTACT: Mr.
Brian Mills at the addresses above, or at
202–586–8267.
SUPPLEMENTARY INFORMATION: DOE will
conduct public hearings to receive oral
comments on the draft EIS at the
following locations commencing at the
times identified:
Concord: Tuesday October 06, 2015,
6:00 p.m., Grappone Conference
Center, Granite Ballroom, 70
Constitution Avenue, Concord, NH
03301.
Whitefield: Wednesday October 07,
2015, 1:00 p.m. and 6:00 p.m.,
Mountain View Grand Resort and
Spa, Presidential Room, 101
Mountain View Road, Whitefield, NH
03598.
Plymouth: Thursday October 08, 2015,
6:00 p.m., Plymouth State University,
Ice Arena Welcome Center, 129 NH
Route 175A, Holderness, NH 03245.
Requests to pre-register to provide
oral comments at a public hearing
should be addressed to the Northern
Pass EIS Team at this email address:
info@northernpasseis.us. Please include
your full name and email address, and
specify the location you request to speak
at. For the Whitefield, NH meeting,
please indicate which meeting time you
wish to speak at. Please state in the
subject line, ‘‘NP Draft EIS Public
Hearing Speaker Request.’’ Please
submit your request by September 30,
2015; requests received by that date will
be given priority in the speaking order.
However, requests to speak may also be
made at the hearing. The speaking order
will be as follows: (1) Elected Officials;
(2) Pre-registered speakers (order
determined on a first-come, first-served
basis); (3) Speakers registering at the
meeting. Pre-registered speakers who
have requested to speak at a specific
time will be accommodated as possible.
Requests to provide oral comments at
the public hearings may be made at the
time of the hearing(s).
DOE invites interested Members of
Congress, state and local governments,
other Federal agencies, American Indian
tribal governments, organizations, and
members of the public to provide
comments on the Draft EIS during the
90-day public comment period. The
public comment period started on July
31, 2015, with the publication in the
Federal Register by the U.S.
Environmental Protection Agency of its
Notice of Availability of the Draft EIS,
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
and will continue until October 29,
2015.
Comments on the draft EIS can be
submitted verbally during public
hearings or in writing to Mr. Brian Mills
using the methods set out in the
ADDRESSES section. Please mark
envelopes and electronic mail subject
lines as ‘‘NP Draft EIS Comments.’’
Written and oral comments will be
given equal weight and all comments
received or postmarked by that date will
be considered by DOE in preparing the
Final EIS. Comments received or
postmarked after that date will be
considered to the extent practicable.
Availability of the Draft EIS The
document is available online at https://
www.northernpasseis.us/. Copies of the
draft EIS are also available at a number
of public libraries and town halls (a list
of locations is found here: https://
media.northernpasseis.us/media/
DraftEIS_Hard_Copy_Locations.pdf)
Printed copies of the document may be
obtained by contacting Mr. Mills at the
above address.
Issued in Washington, DC on August 19,
2015.
Patricia A. Hoffman,
Assistant Secretary, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2015–21317 Filed 8–27–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–93–000]
Eric S. Morris v. North American
Electric Reliability Corporation, SERC
Reliability Corporation; Notice of
Complaint
Take notice that on August 21, 2015,
pursuant to sections 306 of the Federal
Power Act, 16 U.S.C. 825(e) and Rule
206 of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206,
Eric S. Morris (Complainant) filed a
formal complaint against the North
American Electric Reliability
Corporation (NERC) and SERC
Reliability Corporation (SERC)
(collectively, Respondents), alleging that
the Respondents violated the NERC on
Rules of Procedure Appendix 4B
Sanction Guidelines in NERC Full
Notice of Penalty regarding Entergy,
FERC Docket No. NP15–31 filed July 30,
2015.
Eric S. Morris certifies that copies of
the complaint were served on the
contacts for NERC and SERC as listed on
E:\FR\FM\28AUN1.SGM
28AUN1
Agencies
[Federal Register Volume 80, Number 167 (Friday, August 28, 2015)]
[Notices]
[Page 52268]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21317]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. PP-371]
Notice of Public Hearings for the Draft Northern Pass
Transmission Line Project Environmental Impact Statement (DOE/EIS-0463)
AGENCY: U.S. Department of Energy.
ACTION: Notice of public hearings.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (DOE) announces public hearings
to receive comments on the Draft EIS. The Draft EIS evaluates the
environmental impacts of DOE's proposed Federal action of issuing a
Presidential permit to the Applicant: Northern Pass LLC, to construct,
operate, maintain, and connect a new electric transmission line across
the U.S./Canada border in northern New Hampshire.
DATES: Written comments on the Draft EIS must be received by October
29, 2015. See SUPPLEMENTARY INFORMATION for the dates and times of the
public hearings.
ADDRESSES: Written comments should be sent to:
Mr. Brian Mills, Office of Electricity Delivery and Energy Reliability
(OE-20), U.S. Department of Energy, 1000 Independence Avenue SW.,
Washington, DC 20585.
Via email to: draftEIScomments@northernpasseis.us
By facsimile to: (202) 586-8008
Or through the project Web site at: https://www.northernpasseis.us/
See SUPPLEMENTARY INFORMATION for the locations of the public
hearings.
FOR FURTHER INFORMATION CONTACT: Mr. Brian Mills at the addresses
above, or at 202-586-8267.
SUPPLEMENTARY INFORMATION: DOE will conduct public hearings to receive
oral comments on the draft EIS at the following locations commencing at
the times identified:
Concord: Tuesday October 06, 2015, 6:00 p.m., Grappone Conference
Center, Granite Ballroom, 70 Constitution Avenue, Concord, NH 03301.
Whitefield: Wednesday October 07, 2015, 1:00 p.m. and 6:00 p.m.,
Mountain View Grand Resort and Spa, Presidential Room, 101 Mountain
View Road, Whitefield, NH 03598.
Plymouth: Thursday October 08, 2015, 6:00 p.m., Plymouth State
University, Ice Arena Welcome Center, 129 NH Route 175A, Holderness, NH
03245.
Requests to pre-register to provide oral comments at a public
hearing should be addressed to the Northern Pass EIS Team at this email
address: info@northernpasseis.us. Please include your full name and
email address, and specify the location you request to speak at. For
the Whitefield, NH meeting, please indicate which meeting time you wish
to speak at. Please state in the subject line, ``NP Draft EIS Public
Hearing Speaker Request.'' Please submit your request by September 30,
2015; requests received by that date will be given priority in the
speaking order. However, requests to speak may also be made at the
hearing. The speaking order will be as follows: (1) Elected Officials;
(2) Pre-registered speakers (order determined on a first-come, first-
served basis); (3) Speakers registering at the meeting. Pre-registered
speakers who have requested to speak at a specific time will be
accommodated as possible. Requests to provide oral comments at the
public hearings may be made at the time of the hearing(s).
DOE invites interested Members of Congress, state and local
governments, other Federal agencies, American Indian tribal
governments, organizations, and members of the public to provide
comments on the Draft EIS during the 90-day public comment period. The
public comment period started on July 31, 2015, with the publication in
the Federal Register by the U.S. Environmental Protection Agency of its
Notice of Availability of the Draft EIS, and will continue until
October 29, 2015.
Comments on the draft EIS can be submitted verbally during public
hearings or in writing to Mr. Brian Mills using the methods set out in
the ADDRESSES section. Please mark envelopes and electronic mail
subject lines as ``NP Draft EIS Comments.'' Written and oral comments
will be given equal weight and all comments received or postmarked by
that date will be considered by DOE in preparing the Final EIS.
Comments received or postmarked after that date will be considered to
the extent practicable.
Availability of the Draft EIS The document is available online at
https://www.northernpasseis.us/. Copies of the draft EIS are also
available at a number of public libraries and town halls (a list of
locations is found here: https://media.northernpasseis.us/media/DraftEIS_Hard_Copy_Locations.pdf) Printed copies of the document may be
obtained by contacting Mr. Mills at the above address.
Issued in Washington, DC on August 19, 2015.
Patricia A. Hoffman,
Assistant Secretary, Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2015-21317 Filed 8-27-15; 8:45 am]