City of River Falls, Wisconsin; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 52042 [2015-21265]
Download as PDF
52042
Federal Register / Vol. 80, No. 166 / Thursday, August 27, 2015 / Notices
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–32–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: August 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21264 Filed 8–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10489–014]
rmajette on DSK2VPTVN1PROD with NOTICES
City of River Falls, Wisconsin; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Extension of
license term.
b. Project No.: 10489–014.
c. Date Filed: July 6, 2015.
d. Applicant: City of River Falls,
Wisconsin.
e. Name of Project: River Falls
Hydroelectric Project.
f. Location: Kinnickinnic River in
Pierce County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kevin
Westhuis, City of River Falls, 222 Lewis
Street, River Falls, WI 54022, (715) 425–
0906.
i. FERC Contact: Rebecca Martin,
(202) 502–6012, Rebecca.Martin@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 21, 2015.
All documents may be filed
electronically via the Internet. See, 18
VerDate Sep<11>2014
15:08 Aug 26, 2015
Jkt 235001
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–10489–014) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Application: On
September 27, 1988, the River Falls
Project was issued a 30-year license that
expires August 31, 2018. The licensee
requests the Commission extend the
term of the license for an additional 5
years from August 31, 2018, to August
31, 2023. The City submitted its notice
of intent to relicense the project and
pre-application document on November
27, 2013 and a request to use the
traditional licensing process also on that
date, which was granted by the
Commission on January 27, 2014. Since
that time, the River Falls City Council
adopted resolutions that require a
comprehensive river corridor planning
process to determine whether to
continue with the re-license or possibly
surrender the project. The licensee
states that it will be conducting
additional studies to evaluate the
potential for dam removal. The
development of further study plans is
expected to continue with stakeholders
through 2017.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
PO 00000
Frm 00017
Fmt 4703
Sfmt 9990
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–10489–014)
to access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214, respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by a proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21265 Filed 8–26–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\27AUN1.SGM
27AUN1
Agencies
[Federal Register Volume 80, Number 166 (Thursday, August 27, 2015)]
[Notices]
[Page 52042]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21265]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10489-014]
City of River Falls, Wisconsin; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Extension of license term.
b. Project No.: 10489-014.
c. Date Filed: July 6, 2015.
d. Applicant: City of River Falls, Wisconsin.
e. Name of Project: River Falls Hydroelectric Project.
f. Location: Kinnickinnic River in Pierce County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kevin Westhuis, City of River Falls, 222
Lewis Street, River Falls, WI 54022, (715) 425-0906.
i. FERC Contact: Rebecca Martin, (202) 502-6012,
Rebecca.Martin@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: September 21, 2015.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may be paper-filed. To paper-file, mail an
original and seven copies to: Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. Please include
the project number (P-10489-014) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Application: On September 27, 1988, the River
Falls Project was issued a 30-year license that expires August 31,
2018. The licensee requests the Commission extend the term of the
license for an additional 5 years from August 31, 2018, to August 31,
2023. The City submitted its notice of intent to relicense the project
and pre-application document on November 27, 2013 and a request to use
the traditional licensing process also on that date, which was granted
by the Commission on January 27, 2014. Since that time, the River Falls
City Council adopted resolutions that require a comprehensive river
corridor planning process to determine whether to continue with the re-
license or possibly surrender the project. The licensee states that it
will be conducting additional studies to evaluate the potential for dam
removal. The development of further study plans is expected to continue
with stakeholders through 2017.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-10489-014) to access the document.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. A copy is also available for
inspection and reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214, respectively. In determining the appropriate action to take,
the Commission will consider all protests or other comments filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by a proof of service on all persons listed in the service list
prepared by the Commission in this proceeding, in accordance with 18
CFR 385.2010.
Dated: August 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-21265 Filed 8-26-15; 8:45 am]
BILLING CODE 6717-01-P