West Valley Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 52041-52042 [2015-21264]
Download as PDF
Federal Register / Vol. 80, No. 166 / Thursday, August 27, 2015 / Notices
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–21229 Filed 8–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–32–000]
West Valley Water District; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On August 13, 2015, West Valley
Water District filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Roemer
Water Filtration Facility Hydroelectric
Project would have an installed capacity
of 484 kilowatts (kW) and would be
located on the existing West Valley
Water District’s raw water 30-inchdiameter Lytle Creek Turnout pipe into
the Roemer Water Filtration Facility.
The project would be located near the
City of Rialto in San Bernardino County,
California.
52041
Applicant Contact: Thomas J.
Crowley, West Valley Water District,
855 W. Base Line Rd., Rialto, CA 92376,
Phone No. (909) 820–3702.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
141-foot-long by 24-inch-diameter
supply pipe off the 30-inch diameter
main pipeline; (2) a proposed 1,300
square foot prefabricated steel
powerhouse containing two generating
units with a total installed capacity of
484 kW; (3) a 28-foot-long 24-inchdiameter exit pipe returning flow back
into the Roemer Water Filtration
Facility and the Cactus Groundwater
Recharge Pipeline; and (4) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of 2,200 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..................
The conduit the facility uses a tunnel, canal, pipeline, aqueduct, flume,
ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and
not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of
electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ......
On or before August 9, 2013, the facility is not licensed, or exempted from
the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA ...............
rmajette on DSK2VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA ..............
FPA 30(a)(3)(C)(iii), as amended by HREA .............
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
VerDate Sep<11>2014
15:08 Aug 26, 2015
Jkt 235001
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
PO 00000
CFR 385.2001–2005 (2014).
Frm 00016
Fmt 4703
Sfmt 4703
Y
Y
Y
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
E:\FR\FM\27AUN1.SGM
27AUN1
52042
Federal Register / Vol. 80, No. 166 / Thursday, August 27, 2015 / Notices
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–32–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: August 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21264 Filed 8–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10489–014]
rmajette on DSK2VPTVN1PROD with NOTICES
City of River Falls, Wisconsin; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Extension of
license term.
b. Project No.: 10489–014.
c. Date Filed: July 6, 2015.
d. Applicant: City of River Falls,
Wisconsin.
e. Name of Project: River Falls
Hydroelectric Project.
f. Location: Kinnickinnic River in
Pierce County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kevin
Westhuis, City of River Falls, 222 Lewis
Street, River Falls, WI 54022, (715) 425–
0906.
i. FERC Contact: Rebecca Martin,
(202) 502–6012, Rebecca.Martin@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 21, 2015.
All documents may be filed
electronically via the Internet. See, 18
VerDate Sep<11>2014
15:08 Aug 26, 2015
Jkt 235001
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–10489–014) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Application: On
September 27, 1988, the River Falls
Project was issued a 30-year license that
expires August 31, 2018. The licensee
requests the Commission extend the
term of the license for an additional 5
years from August 31, 2018, to August
31, 2023. The City submitted its notice
of intent to relicense the project and
pre-application document on November
27, 2013 and a request to use the
traditional licensing process also on that
date, which was granted by the
Commission on January 27, 2014. Since
that time, the River Falls City Council
adopted resolutions that require a
comprehensive river corridor planning
process to determine whether to
continue with the re-license or possibly
surrender the project. The licensee
states that it will be conducting
additional studies to evaluate the
potential for dam removal. The
development of further study plans is
expected to continue with stakeholders
through 2017.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
PO 00000
Frm 00017
Fmt 4703
Sfmt 9990
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–10489–014)
to access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214, respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by a proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–21265 Filed 8–26–15; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\27AUN1.SGM
27AUN1
Agencies
[Federal Register Volume 80, Number 166 (Thursday, August 27, 2015)]
[Notices]
[Pages 52041-52042]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21264]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-32-000]
West Valley Water District; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On August 13, 2015, West Valley Water District filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA), as amended by section 4
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The
proposed Roemer Water Filtration Facility Hydroelectric Project would
have an installed capacity of 484 kilowatts (kW) and would be located
on the existing West Valley Water District's raw water 30-inch-diameter
Lytle Creek Turnout pipe into the Roemer Water Filtration Facility. The
project would be located near the City of Rialto in San Bernardino
County, California.
Applicant Contact: Thomas J. Crowley, West Valley Water District,
855 W. Base Line Rd., Rialto, CA 92376, Phone No. (909) 820-3702.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed 141-foot-long by 24-inch-
diameter supply pipe off the 30-inch diameter main pipeline; (2) a
proposed 1,300 square foot prefabricated steel powerhouse containing
two generating units with a total installed capacity of 484 kW; (3) a
28-foot-long 24-inch-diameter exit pipe returning flow back into the
Roemer Water Filtration Facility and the Cactus Groundwater Recharge
Pipeline; and (4) appurtenant facilities. The proposed project would
have an estimated annual generating capacity of 2,200 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA............ The conduit the facility uses a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for
the distribution of water for agricultural,
municipal, or industrial consumption and not
primarily for the generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA......... The facility is constructed, operated, or Y
maintained for the generation of electric power
and uses for such generation only the
hydroelectric potential of a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA........ The facility has an installed capacity that does Y
not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA....... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference
[[Page 52042]]
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD15-32-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: August 21, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-21264 Filed 8-26-15; 8:45 am]
BILLING CODE 6717-01-P