Electric Quarterly Reports: M&R Energy Resources Corp., Reliable Power, LLC, Susterra Energy, LLC; Order on Intent To Revoke Market-Based Rate Authority, 52043-52044 [2015-21201]
Download as PDF
Federal Register / Vol. 80, No. 166 / Thursday, August 27, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14687–000]
rmajette on DSK2VPTVN1PROD with NOTICES
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 25, 2015, the Energy
Resources USA Inc. filed an application
for a preliminary permit under section
4(f) of the Federal Power Act proposing
to study the feasibility of the proposed
Lock and Dam No.11 Hydroelectric
Project No. 14687–000, to be located at
the existing Mississippi River Lock and
Dam No. 11 on the Mississippi River,
near the City of Dubuque, in Grant
County, Wisconsin. The Mississippi
River Lock and Dam No. 11 is owned by
the United States government and
operated by the U.S. Army Corps of
Engineers.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist
of: (1) A new 770-foot-long by 300-footwide earthen intake area; (2) a new 220foot by 90-foot concrete powerhouse
containing four 2.5-megawatt
hydropower turbine-generators having a
total combined generating capacity of 10
megawatts; (3) one new 1000-foot-long
by 220-foot-wide tailrace; (4) a new
intake retaining wall and new tailrace
retaining wall each measuring 85-footlong by 43-foot-high by 3-foot-thick; (5)
a new 50-foot by 60-foot switchyard; (6)
a new 1.52-mile-long, 69-kilovolt
transmission line; and (7) appurtenant
facilities. The project would have an
estimated annual generation of 119,655
megawatt-hours.
Applicant Contact: Mr. Ander
Gonzalez, 2655 Le Jeune Road, Suite
804, Coral Gables, Florida 33134;
telephone +34 932523840.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. The Commission strongly
encourages electronic filing. Please file
VerDate Sep<11>2014
15:08 Aug 26, 2015
Jkt 235001
comments, motions to intervene, notices
of intent, and competing applications
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14687–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14687) in the docket number field to
access the document. For assistance,
contact FERC Online Support at 1–866–
208–3676.
Dated: August 20, 2015.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER02–2001–019, ER13–392–
000, ER11–4531–000, ER12–2514–000]
Electric Quarterly Reports: M&R
Energy Resources Corp., Reliable
Power, LLC, Susterra Energy, LLC;
Order on Intent To Revoke MarketBased Rate Authority
Before Commissioners: Norman C. Bay,
Chairman; Philip D. Moeller, Cheryl A.
LaFleur, Tony Clark, and Colette D.
Honorable.
1. Section 205 of the Federal Power
Act (FPA), 16 U.S.C. 824d (2012), and
18 CFR part 35 (2015), require, among
other things, that all rates, terms, and
conditions of jurisdictional services be
filed with the Commission. In Order No.
2001, the Commission revised its public
utility filing requirements and
established a requirement for public
utilities, including power marketers, to
file Electric Quarterly Reports
summarizing the contractual terms and
conditions in their agreements for all
Frm 00018
Fmt 4703
Sfmt 4703
jurisdictional services (including
market-based power sales, cost-based
power sales, and transmission service)
and providing transaction information
(including rates) for short-term and
long-term power sales during the most
recent calendar quarter.1
2. The Commission requires sellers
with market-based rate authorization to
file Electric Quarterly Reports.2
Commission staff’s review of the
Electric Quarterly Report submittals
indicates that the following three public
utilities with market-based rate
authorization have failed to file their
Electric Quarterly Reports: M&R Energy
Resources Corp.; Reliable Power, LLC;
and Susterra Energy, LLC. This order
notifies these public utilities that their
market-based rate authorizations will be
revoked unless they comply with the
Commission’s requirements within 15
days of the date of issuance of this
order.
3. In Order No. 2001, the Commission
stated that,
[i]f a public utility fails to file a[n] Electric
Quarterly Report (without an appropriate
request for extension), or fails to report an
agreement in a report, that public utility may
forfeit its market-based rate authority and
may be required to file a new application for
market-based rate authority if it wishes to
resume making sales at market-based rates.[3]
4. The Commission further stated that,
[FR Doc. 2015–21261 Filed 8–26–15; 8:45 am]
PO 00000
52043
[o]nce this rule becomes effective, the
requirement to comply with this rule will
supersede the conditions in public utilities’
market-based rate authorizations, and failure
to comply with the requirements of this rule
will subject public utilities to the same
consequences they would face for not
satisfying the conditions in their rate
authorizations, including possible revocation
1 Revised Public Utility Filing Requirements,
Order No. 2001, FERC Stats. & Regs. ¶ 31,127, reh’g
denied, Order No. 2001–A, 100 FERC ¶ 61,074,
reh’g denied, Order No. 2001–B, 100 FERC ¶ 61,342,
order directing filing, Order No. 2001–C, 101 FERC
¶ 61,314 (2002), order directing filing, Order No.
2001–D, 102 FERC ¶ 61,334, order refining filing
requirements, Order No. 2001–E, 105 FERC ¶ 61,352
(2003), order on clarification, Order No. 2001–F,
106 FERC ¶ 61,060 (2004), order revising filing
requirements, Order No. 2001–G, 120 FERC
¶ 61,270, order on reh’g and clarification, Order No.
2001–H, 121 FERC ¶ 61,289 (2007), order revising
filing requirements, Order No. 2001–I, FERC Stats.
& Regs. ¶ 31,282 (2008).
2 See, e.g., Market-Based Rates for Wholesale
Sales of Electric Energy, Capacity and Ancillary
Services by Public Utilities, Order No. 697, FERC
Stats. & Regs. ¶ 31,252, at P 3, clarified, 121 FERC
¶ 61,260 (2007), order on reh’g, Order No. 697–A,
FERC Stats. & Regs. ¶ 31,268, clarified, 124 FERC
¶ 61,055, order on reh’g, Order No. 697–B, FERC
Stats. & Regs. ¶ 31,285 (2008), order on reh’g, Order
No. 697–C, FERC Stats. & Regs. ¶ 31,291 (2009),
order on reh’g, Order No. 697–D, FERC Stats. &
Regs. ¶ 31,305 (2010), aff’d sub nom. Mont.
Consumer Counsel v. FERC, 659 F.3d 910 (9th Cir.
2011), cert. denied, 133 S. Ct. 26 (2012).
3 Order No. 2001, FERC Stats. & Regs. ¶ 31,127 at
P 222.
E:\FR\FM\27AUN1.SGM
27AUN1
52044
Federal Register / Vol. 80, No. 166 / Thursday, August 27, 2015 / Notices
of their authority to make wholesale power
sales at market-based rates.[4]
5. Pursuant to these requirements, the
Commission has revoked the marketbased rate tariffs of market-based rate
sellers that failed to submit their
Electric Quarterly Reports.5
6. Sellers must file Electric Quarterly
Reports consistent with the procedures
set forth in Order Nos. 768 6 and 770.7
The exact filing dates for Electric
Quarterly Reports are prescribed in 18
CFR 35.10b (2015). As noted above,
Commission staff’s review of the
Electric Quarterly Report submittals for
the period up to the second quarter of
2015 identified three public utilities
with market-based rate authorization
that failed to file Electric Quarterly
Reports. Commission staff contacted or
attempted to contact these entities to
remind them of their regulatory
obligations. Despite these reminders, the
public utilities listed in the caption of
this order have not met these
obligations. Accordingly, this order
notifies these public utilities that their
market-based rate authorizations will be
revoked unless they comply with the
Commission’s requirements within 15
days of the issuance of this order.
7. In the event that any of the abovecaptioned market-based rate sellers has
already filed its Electric Quarterly
Reports in compliance with the
Commission’s requirements, its
inclusion herein is inadvertent. Such
market-based rate seller is directed,
within 15 days of the date of issuance
of this order, to make a filing with the
Commission identifying itself and
providing details about its prior filings
that establish that it complied with the
Commission’s Electric Quarterly Report
filing requirements.
8. If any of the above-captioned
market-based rate sellers does not wish
to continue having market-based rate
authority, it may file a notice of
cancellation with the Commission
pursuant to section 205 of the FPA to
cancel its market-based rate tariff.
The Commission orders:
(A) Within 15 days of the date of
issuance of this order, each public
utility listed in the caption of this order
shall file with the Commission all
delinquent Electric Quarterly Reports. If
4 Id.
P 223.
e.g., Electric Quarterly Reports, 75 FR
63468 (Oct. 15, 2010); Electric Quarterly Reports, 75
FR 45111 (Aug. 2, 2010).
6 Electricity Market Transparency Provisions of
Section 220 of the Federal Power Act, Order No.
768, FERC Stats. & Regs. ¶ 31,336 (2012), order on
reh’g, Order No. 768–A, 143 FERC ¶ 61,054 (2013).
7 Revisions to Electric Quarterly Report Filing
Process, Order No. 770, FERC Stats. & Regs.
¶ 31,338 (2012).
rmajette on DSK2VPTVN1PROD with NOTICES
5 See,
VerDate Sep<11>2014
15:08 Aug 26, 2015
Jkt 235001
a public utility subject to this order fails
to make the filings required in this
order, the Commission will revoke that
public utility’s market-based rate
authorization and will terminate its
electric market-based rate tariff. The
Secretary is hereby directed, upon
expiration of the filing deadline in this
order, to promptly issue a notice,
effective on the date of issuance, listing
the public utilities whose tariffs have
been revoked for failure to comply with
the requirements of this order and the
Commission’s Electric Quarterly Report
filing requirements.
(B) The Secretary is hereby directed to
publish this order in the Federal
Register.
By the Commission.
Issued: August 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filing Instituting Proceedings
Docket Numbers: RP15–1133–001.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Tariff Amendment per
154.205(b): Amendment to RP15–1133–
000 (BP NegRate) Filing to be effective
11/1/2015.
Filed Date: 8/20/15.
Accession Number: 20150820–5054.
Comments Due: 5 p.m. ET 9/1/15.
Docket Numbers: RP15–1203–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Section 4(d) rate filing
per 154.204: OFO and OC Penalties to
be effective 10/1/2015.
Filed Date: 8/20/15.
Accession Number: 20150820–5178.
Comments Due: 5 p.m. ET 9/1/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
Frm 00019
Fmt 4703
Sfmt 4703
Dated: August 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2015–21231 Filed 8–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2015–21201 Filed 8–26–15; 8:45 am]
PO 00000
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1937–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: Order
No. 1000 Interregional SPP–MISO JOA
Compliance Filing to be effective 3/30/
2014.
Filed Date: 8/18/15.
Accession Number: 20150818–5203.
Comments Due: 5 p.m. ET 9/8/15.
Docket Numbers: ER15–2506–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: SPP-Western Area Power
Administration Joint Operating
Agreement Extension to be effective 6/
21/2015.
Filed Date: 8/21/15.
Accession Number: 20150821–5158.
Comments Due: 5 p.m. ET 9/11/15.
Docket Numbers: ER15–2507–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 1976R4 Kaw Valley Electric
Cooperative, Inc. NITSA and NOA to be
effective 8/1/2015.
Filed Date: 8/21/15.
Accession Number: 20150821–5185.
Comments Due: 5 p.m. ET 9/11/15.
Docket Numbers: ER15–2508–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: 2045R4 Westar Energy, Inc.
NITSA and NOA to be effective 8/1/
2015.
Filed Date: 8/21/15.
Accession Number: 20150821–5190.
Comments Due: 5 p.m. ET 9/11/15.
E:\FR\FM\27AUN1.SGM
27AUN1
Agencies
[Federal Register Volume 80, Number 166 (Thursday, August 27, 2015)]
[Notices]
[Pages 52043-52044]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-21201]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER02-2001-019, ER13-392-000, ER11-4531-000, ER12-2514-000]
Electric Quarterly Reports: M&R Energy Resources Corp., Reliable
Power, LLC, Susterra Energy, LLC; Order on Intent To Revoke Market-
Based Rate Authority
Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller,
Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.
1. Section 205 of the Federal Power Act (FPA), 16 U.S.C. 824d
(2012), and 18 CFR part 35 (2015), require, among other things, that
all rates, terms, and conditions of jurisdictional services be filed
with the Commission. In Order No. 2001, the Commission revised its
public utility filing requirements and established a requirement for
public utilities, including power marketers, to file Electric Quarterly
Reports summarizing the contractual terms and conditions in their
agreements for all jurisdictional services (including market-based
power sales, cost-based power sales, and transmission service) and
providing transaction information (including rates) for short-term and
long-term power sales during the most recent calendar quarter.\1\
---------------------------------------------------------------------------
\1\ Revised Public Utility Filing Requirements, Order No. 2001,
FERC Stats. & Regs. ] 31,127, reh'g denied, Order No. 2001-A, 100
FERC ] 61,074, reh'g denied, Order No. 2001-B, 100 FERC ] 61,342,
order directing filing, Order No. 2001-C, 101 FERC ] 61,314 (2002),
order directing filing, Order No. 2001-D, 102 FERC ] 61,334, order
refining filing requirements, Order No. 2001-E, 105 FERC ] 61,352
(2003), order on clarification, Order No. 2001-F, 106 FERC ] 61,060
(2004), order revising filing requirements, Order No. 2001-G, 120
FERC ] 61,270, order on reh'g and clarification, Order No. 2001-H,
121 FERC ] 61,289 (2007), order revising filing requirements, Order
No. 2001-I, FERC Stats. & Regs. ] 31,282 (2008).
---------------------------------------------------------------------------
2. The Commission requires sellers with market-based rate
authorization to file Electric Quarterly Reports.\2\ Commission staff's
review of the Electric Quarterly Report submittals indicates that the
following three public utilities with market-based rate authorization
have failed to file their Electric Quarterly Reports: M&R Energy
Resources Corp.; Reliable Power, LLC; and Susterra Energy, LLC. This
order notifies these public utilities that their market-based rate
authorizations will be revoked unless they comply with the Commission's
requirements within 15 days of the date of issuance of this order.
---------------------------------------------------------------------------
\2\ See, e.g., Market-Based Rates for Wholesale Sales of
Electric Energy, Capacity and Ancillary Services by Public
Utilities, Order No. 697, FERC Stats. & Regs. ] 31,252, at P 3,
clarified, 121 FERC ] 61,260 (2007), order on reh'g, Order No. 697-
A, FERC Stats. & Regs. ] 31,268, clarified, 124 FERC ] 61,055, order
on reh'g, Order No. 697-B, FERC Stats. & Regs. ] 31,285 (2008),
order on reh'g, Order No. 697-C, FERC Stats. & Regs. ] 31,291
(2009), order on reh'g, Order No. 697-D, FERC Stats. & Regs. ]
31,305 (2010), aff'd sub nom. Mont. Consumer Counsel v. FERC, 659
F.3d 910 (9th Cir. 2011), cert. denied, 133 S. Ct. 26 (2012).
---------------------------------------------------------------------------
3. In Order No. 2001, the Commission stated that,
[i]f a public utility fails to file a[n] Electric Quarterly Report
(without an appropriate request for extension), or fails to report
an agreement in a report, that public utility may forfeit its
market-based rate authority and may be required to file a new
application for market-based rate authority if it wishes to resume
making sales at market-based rates.\[3]\
---------------------------------------------------------------------------
\3\ Order No. 2001, FERC Stats. & Regs. ] 31,127 at P 222.
---------------------------------------------------------------------------
4. The Commission further stated that,
[o]nce this rule becomes effective, the requirement to comply with
this rule will supersede the conditions in public utilities' market-
based rate authorizations, and failure to comply with the
requirements of this rule will subject public utilities to the same
consequences they would face for not satisfying the conditions in
their rate authorizations, including possible revocation
[[Page 52044]]
of their authority to make wholesale power sales at market-based
rates.\[4]\
---------------------------------------------------------------------------
\4\ Id. P 223.
5. Pursuant to these requirements, the Commission has revoked the
market-based rate tariffs of market-based rate sellers that failed to
submit their Electric Quarterly Reports.\5\
---------------------------------------------------------------------------
\5\ See, e.g., Electric Quarterly Reports, 75 FR 63468 (Oct. 15,
2010); Electric Quarterly Reports, 75 FR 45111 (Aug. 2, 2010).
---------------------------------------------------------------------------
6. Sellers must file Electric Quarterly Reports consistent with the
procedures set forth in Order Nos. 768 \6\ and 770.\7\ The exact filing
dates for Electric Quarterly Reports are prescribed in 18 CFR 35.10b
(2015). As noted above, Commission staff's review of the Electric
Quarterly Report submittals for the period up to the second quarter of
2015 identified three public utilities with market-based rate
authorization that failed to file Electric Quarterly Reports.
Commission staff contacted or attempted to contact these entities to
remind them of their regulatory obligations. Despite these reminders,
the public utilities listed in the caption of this order have not met
these obligations. Accordingly, this order notifies these public
utilities that their market-based rate authorizations will be revoked
unless they comply with the Commission's requirements within 15 days of
the issuance of this order.
---------------------------------------------------------------------------
\6\ Electricity Market Transparency Provisions of Section 220 of
the Federal Power Act, Order No. 768, FERC Stats. & Regs. ] 31,336
(2012), order on reh'g, Order No. 768-A, 143 FERC ] 61,054 (2013).
\7\ Revisions to Electric Quarterly Report Filing Process, Order
No. 770, FERC Stats. & Regs. ] 31,338 (2012).
---------------------------------------------------------------------------
7. In the event that any of the above-captioned market-based rate
sellers has already filed its Electric Quarterly Reports in compliance
with the Commission's requirements, its inclusion herein is
inadvertent. Such market-based rate seller is directed, within 15 days
of the date of issuance of this order, to make a filing with the
Commission identifying itself and providing details about its prior
filings that establish that it complied with the Commission's Electric
Quarterly Report filing requirements.
8. If any of the above-captioned market-based rate sellers does not
wish to continue having market-based rate authority, it may file a
notice of cancellation with the Commission pursuant to section 205 of
the FPA to cancel its market-based rate tariff.
The Commission orders:
(A) Within 15 days of the date of issuance of this order, each
public utility listed in the caption of this order shall file with the
Commission all delinquent Electric Quarterly Reports. If a public
utility subject to this order fails to make the filings required in
this order, the Commission will revoke that public utility's market-
based rate authorization and will terminate its electric market-based
rate tariff. The Secretary is hereby directed, upon expiration of the
filing deadline in this order, to promptly issue a notice, effective on
the date of issuance, listing the public utilities whose tariffs have
been revoked for failure to comply with the requirements of this order
and the Commission's Electric Quarterly Report filing requirements.
(B) The Secretary is hereby directed to publish this order in the
Federal Register.
By the Commission.
Issued: August 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-21201 Filed 8-26-15; 8:45 am]
BILLING CODE 6717-01-P