Notice of Commission or Commission Staff Attendance at MISO Meetings, 51554-51556 [2015-20992]
Download as PDF
51554
Federal Register / Vol. 80, No. 164 / Tuesday, August 25, 2015 / Notices
Dated: August 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–20985 Filed 8–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1938–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2015–
08–18_MISO–SPP Order 1000
Compliance to be effective 3/30/2014.
Filed Date: 8/18/15.
Accession Number: 20150818–5134.
Comments Due: 5 p.m. ET 9/8/15.
Docket Numbers: ER15–2472–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2015–08–18_SA 2829 Entergy
Arkansas-Pine Bluff Energy GIA (J328)
to be effective 8/19/2015.
Filed Date: 8/18/15.
Accession Number: 20150818–5109.
Comments Due: 5 p.m. ET 9/8/15.
Docket Numbers: ER15–2473–000.
Applicants: HIC Energy, LLC.
Description: Baseline eTariff Filing:
HIC Energy MBR Application to be
effective 10/18/2015.
Filed Date: 8/18/15.
Accession Number: 20150818–5116.
Comments Due: 5 p.m. ET 9/8/15.
Docket Numbers: ER15–2474–000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing: Kittitas
NITSA Amendment No 2 SA No. 506 to
be effective 2/1/2015.
Filed Date: 8/18/15.
Accession Number: 20150818–5124.
Comments Due: 5 p.m. ET 9/8/15.
Docket Numbers: ER15–2475–000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing: Sumas
NITSA Amendment No 2 SA No. 626 to
be effective 2/1/2015.
Filed Date: 8/18/15.
Accession Number: 20150818–5125.
Comments Due: 5 p.m. ET 9/8/15.
Docket Numbers: ER15–2476–000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing: Tanner
Electric NITSA Amendment No 2 SA No
543 to be effective 2/1/2015.
Filed Date: 8/18/15.
Accession Number: 20150818–5128.
Comments Due: 5 p.m. ET 9/8/15.
VerDate Sep<11>2014
17:10 Aug 24, 2015
Jkt 235001
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 18, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–20940 Filed 8–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2477–000]
Golden Hills Wind, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Golden
Hills Wind, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September 8,
2015.
The Commission encourages
electronic submission of protests and
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–20988 Filed 8–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission or Commission
Staff Attendance at MISO Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following MISO-related meetings:
• Advisory Committee (10:00 a.m.–3:00
p.m., Local Time)
Æ August 26, 350 Market St., St. Paul,
MN
Æ September 23
Æ October 21, 3 Statehouse Plaza,
Little Rock, AR
Æ November 18
Æ December 9
• Board of Directors Audit & Finance
Committee
Æ August 26, 350 Market St., St. Paul,
MN, (2:00 p.m.–3:30 p.m.)
Æ September 24 (1:30 p.m.–3:30 p.m.)
Æ October 21 (4:30 p.m.–6:00 p.m.)
E:\FR\FM\25AUN1.SGM
25AUN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 164 / Tuesday, August 25, 2015 / Notices
• Board of Directors (8:30 a.m.–10:00
a.m., Local Time)
Æ August 27, 350 Market St., St. Paul,
MN
Æ October 22
Æ December 10
• Board of Directors Markets Committee
(8:00 a.m.–10:00 a.m., Local Time)
Æ August 26, 350 Market St., St. Paul,
MN (Starts at 7:30 a.m.)
Æ September 23
Æ October 21, 3 Statehouse Plaza,
Little Rock, AR
Æ November 18
Æ December 9
• Board of Directors System Planning
Committee
Æ August 26, 350 Market St., St. Paul,
MN, (4:00 p.m.–6:00 p.m.)
Æ October 15, (12:30 p.m.–2:00 p.m.)
Æ November 19 (1:00 p.m.–3:00 p.m.)
Æ December 9 (3:30–5:30 p.m.)
• MISO Informational Forum (3:00
p.m.–5:00 p.m., Local Time)
Æ August 25, 350 Market St., St. Paul,
MN
Æ October 20, 3 Statehouse Plaza,
Little Rock, AR
Æ November 17
Æ December 15
• MISO Market Subcommittee (9:00
a.m.–4:00 p.m., Local Time)
Æ September 1
Æ September 29
Æ October 27
Æ December 1
• MISO Supply Adequacy Working
Group (9:00 a.m.–5:00 p.m., Local
Time)
Æ September 3
Æ October 1
Æ October 29
Æ December 3
• MISO Regional Expansion Criteria
and Benefits Task Force
Æ October 12
• MISO Planning Advisory Committee
(9:00 a.m.–5:00 p.m., Local Time)
Æ September 16
Æ October 14
Æ November 11
Æ December 16
Unless otherwise noted all of the
meetings above will be held at: MISO
Headquarters, 701 City Center Drive,
720 City Center Drive, and, Carmel, IN
46032.
Further information may be found at
www.misoenergy.org.
The above-referenced meetings are
open to the public.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. EL14–21, Southwest Power
Pool, Inc. v. Midcontinent
Independent System Operator, Inc.
VerDate Sep<11>2014
17:10 Aug 24, 2015
Jkt 235001
Docket No. ER14–1174, Southwest
Power Pool, Inc.
Docket No. ER14–2850, Southwest
Power Pool, Inc.
Docket No. ER09–1431, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–3279, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–4081, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–678, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–2302, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–2706, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1266, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1265, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1194, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–309, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER13–692, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–2375, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–2376, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–2379, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–2124, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–2378, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–2337, Midcontinent
Independent System Operator, Inc.
Docket No. EL13–88, Northern Indiana
Public Service Corp. v Midcontinent
Independent System Operator, Inc., et
al.
Docket No. EL14–12, ABATE et al. v
Midcontinent Independent System
Operator, Inc., et al.
Docket No. AD12–16, Capacity
Deliverability across the MISO/PJM
Seam
Docket No. AD14–3, Coordination of
Energy and Capacity across the MISO/
PJM Seam
Docket No. ER13–2124, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–1736, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2605, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2952, Midcontinent
Independent System Operator, Inc.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
51555
Docket No. ER14–2156, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2445, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–142, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–685, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–945, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–530, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1067, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–767, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1776, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1877, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1210, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1890, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1289, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1345, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1923, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2050, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1440, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2145, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2186, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2190, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2227, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2256, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2269, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–1571, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2338, Midcontinent
Independent System Operator, Inc.
Docket No. ER15–2364, Midcontinent
Independent System Operator, Inc.
Docket No. EL15–90, Merricourt Power
Partners, LLC v Midcontinent
Independent System Operator, Inc.
Docket No. EL15–69, Acciona Wind v
Midcontinent Independent System
Operator, Inc.
Docket No. EL15–71, The People of the
State of Illinois v Midcontinent
Independent System Operator, Inc.
Docket No. EL15–70, Public Citizen, Inc.
v Midcontinent Independent System
Operator, Inc.
Docket No. EL15–77, Morgan Stanley
Capital Group, Inc. v Midcontinent
Independent System Operator, Inc.
Docket No. EL15–82, Illinois Industrial
Consumers v Midcontinent
Independent System Operator, Inc.
E:\FR\FM\25AUN1.SGM
25AUN1
51556
Federal Register / Vol. 80, No. 164 / Tuesday, August 25, 2015 / Notices
Docket No. EL15–89, Boston Energy
Trading and Marketing, LLC v
Midcontinent Independent System
Operator, Inc.
For more information, contact Patrick
Clarey, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov, or Christopher
Miller, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (317) 249–5936 or
christopher.miller@ferc.gov.
Dated: August 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–20992 Filed 8–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Central Valley Project, CaliforniaOregon Transmission Project, Pacific
Alternating Current Intertie, and
Information on the Path 15
Transmission Upgrade-Rate Order No.
WAPA–173
Western Area Power
Administration, DOE.
ACTION: Notice of Proposed Extension of
Power, Transmission, and Ancillary
Services Formula Rates.
AGENCY:
The Western Area Power
Administration (Western), a power
marketing administration within the
U.S. Department of Energy (DOE),
proposes to extend the existing Central
Valley Project power, transmission, and
ancillary services formula rates,
California-Oregon Transmission Project
transmission formula rate, Pacific
Alternating Current Intertie
transmission formula rate, and thirdparty transmission service formula rate
through September 30, 2019. The
existing Rate Schedules CV–F13, CPP–
2, CV–T3, CV–NWT5, COTP–T3, PACI–
T3, CV–TPT7, CV–UUP1, CV–SPR4,
CV–SUR4, CV–RFS4, CV–EID4, and
CV–GID1 expire on September 30, 2016.
DATES: A consultation and comment
period starts with the publication of this
notice and will end on September 24,
2015. Western will accept written
comments any time during the
consultation and comment period.
ADDRESSES: Send written comments to:
Mr. Subhash Paluru, Regional Manager,
or Ms. Regina Rieger, Rates Manager,
Sierra Nevada Region, Western Area
Power Administration, 114 Parkshore
Drive, Folsom, CA 95630–4710; or email
comments to SNR-Rates@wapa.gov. All
asabaliauskas on DSK5VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:10 Aug 24, 2015
Jkt 235001
documents that Western used to
develop this proposed rate extension are
available for inspection and copying at
the Sierra Nevada Region, located at 114
Parkshore Drive, Folsom, CA 95630–
4710.
FOR FURTHER INFORMATION CONTACT: Ms.
Regina Rieger, Rates Manager, Sierra
Nevada Region, Western Area Power
Administration, 114 Parkshore Drive,
Folsom, CA 95630–4710, telephone
(916) 353–4629, email rieger@wapa.gov.
SUPPLEMENTARY INFORMATION: Western
proposes to extend the current rate
schedules through September 30, 2019.
A three-year formula rate extension
followed by a five-year formula rate
adjustment process will align with the
end of the 2004 Power Marketing Plan,
allowing Western time to review
existing formula rate methodologies,
solicit input from its customers and
other interested parties, and determine
whether revisions to those
methodologies are warranted. The
existing rates provide sufficient revenue
to repay all annual expenses, including
interest expense, and to repay capital
investments within the allowable
periods, thus ensuring repayment
within the cost recovery criteria set
forth in DOE Order RA 6120.2.
By Delegation Order No. 00–037.00A,
effective October 25, 2013, the Secretary
of Energy delegated: (1) The authority to
develop power and transmission rates to
Western’s Administrator; (2) the
authority to confirm, approve, and place
such rates into effect on an interim basis
to the Deputy Secretary of Energy; and
(3) the authority to confirm, approve,
and place into effect on a final basis, to
remand, or to disapprove such rates to
the Federal Energy Regulatory
Commission (FERC).
FERC confirmed and approved the
existing formula rates defined in Rate
Schedules CV–F13, CPP–2, CV–T3, CV–
NWT5, COTP–T3, PACI–T3, CV–TPT7,
CV–UUP1, CV–SPR4, CV–SUR4, CV–
RFS4, CV–EID4, and CV–GID1, filed
under Rate Order No. WAPA–156,1 on
a final basis for five years through
September 30, 2016.2 In accordance
with 10 CFR 903.23(a), Western
proposes to extend the existing power,
transmission, and ancillary services
formula rates without an adjustment.
The rates and revenue requirements
resulting from the approved formula
rate methodologies are recalculated each
year, based on updated financial and
operational data. Western notifies
customers in writing and posts updated
1 See
76 FR 56,906 (September 14, 2011).
U.S. Dept. of Energy, Western Area Power
Admin., Docket No. EF11–9–000, 137 FERC ¶
62,201 (2011).
2 See
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
rates to its Rates Web site: https://
www.wapa.gov/regions/SN/rates/Pages/
rates.aspx and the Open Access SameTime Information Site: https://
www.oasis.oati.com/wasn/,
as necessary.
In accordance with 10 CFR 903.23,
Western determined it is not necessary
to hold a public information or public
comment forum. Western will post
comments received to its Rates Web site,
noted above, after the close of the
comment period. Comments must be
received by the end of the comment and
consultation period to ensure they are
considered by Western. After review of
public comments, Western will take
further action on the proposed formula
rate extension consistent with 10 CFR
903.23.
Dated: August 18, 2015.
Mark A. Gabriel,
Administrator.
[FR Doc. 2015–20976 Filed 8–24–15; 8:45 am]
BILLING CODE 6450–01–P
EVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2015–0022; FRL–9932–67]
Pesticide Product Registrations;
Receipt of Applications for New Uses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has received applications
to register new uses for pesticide
products containing currently registered
active ingredients. Pursuant to the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA), EPA is hereby
providing notice of receipt and
opportunity to comment on these
applications.
SUMMARY:
Comments must be received on
or before September 24, 2015.
ADDRESSES: Submit your comments,
identified by the Docket Identification
(ID) Number and the EPA Registration
Number of interest as shown in the body
of this document, by one of the
following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute.
• Mail: OPP Docket, Environmental
Protection Agency Docket Center (EPA/
DC), (28221T), 1200 Pennsylvania Ave.,
NW., Washington, DC 20460–0001.
DATES:
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 80, Number 164 (Tuesday, August 25, 2015)]
[Notices]
[Pages 51554-51556]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-20992]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission or Commission Staff Attendance at MISO
Meetings
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and Commission staff may attend the following
MISO-related meetings:
Advisory Committee (10:00 a.m.-3:00 p.m., Local Time)
[cir] August 26, 350 Market St., St. Paul, MN
[cir] September 23
[cir] October 21, 3 Statehouse Plaza, Little Rock, AR
[cir] November 18
[cir] December 9
Board of Directors Audit & Finance Committee
[cir] August 26, 350 Market St., St. Paul, MN, (2:00 p.m.-3:30
p.m.)
[cir] September 24 (1:30 p.m.-3:30 p.m.)
[cir] October 21 (4:30 p.m.-6:00 p.m.)
[[Page 51555]]
Board of Directors (8:30 a.m.-10:00 a.m., Local Time)
[cir] August 27, 350 Market St., St. Paul, MN
[cir] October 22
[cir] December 10
Board of Directors Markets Committee (8:00 a.m.-10:00 a.m.,
Local Time)
[cir] August 26, 350 Market St., St. Paul, MN (Starts at 7:30 a.m.)
[cir] September 23
[cir] October 21, 3 Statehouse Plaza, Little Rock, AR
[cir] November 18
[cir] December 9
Board of Directors System Planning Committee
[cir] August 26, 350 Market St., St. Paul, MN, (4:00 p.m.-6:00
p.m.)
[cir] October 15, (12:30 p.m.-2:00 p.m.)
[cir] November 19 (1:00 p.m.-3:00 p.m.)
[cir] December 9 (3:30-5:30 p.m.)
MISO Informational Forum (3:00 p.m.-5:00 p.m., Local Time)
[cir] August 25, 350 Market St., St. Paul, MN
[cir] October 20, 3 Statehouse Plaza, Little Rock, AR
[cir] November 17
[cir] December 15
MISO Market Subcommittee (9:00 a.m.-4:00 p.m., Local Time)
[cir] September 1
[cir] September 29
[cir] October 27
[cir] December 1
MISO Supply Adequacy Working Group (9:00 a.m.-5:00 p.m., Local
Time)
[cir] September 3
[cir] October 1
[cir] October 29
[cir] December 3
MISO Regional Expansion Criteria and Benefits Task Force
[cir] October 12
MISO Planning Advisory Committee (9:00 a.m.-5:00 p.m., Local
Time)
[cir] September 16
[cir] October 14
[cir] November 11
[cir] December 16
Unless otherwise noted all of the meetings above will be held at:
MISO Headquarters, 701 City Center Drive, 720 City Center Drive, and,
Carmel, IN 46032.
Further information may be found at www.misoenergy.org.
The above-referenced meetings are open to the public.
The discussions at each of the meetings described above may address
matters at issue in the following proceedings:
Docket No. EL14-21, Southwest Power Pool, Inc. v. Midcontinent
Independent System Operator, Inc.
Docket No. ER14-1174, Southwest Power Pool, Inc.
Docket No. ER14-2850, Southwest Power Pool, Inc.
Docket No. ER09-1431, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER11-3279, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER11-4081, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-678, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-2302, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-2706, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1266, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1265, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-1194, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-309, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER13-692, Midcontinent Independent System Operator, Inc.
Docket No. ER13-2375, Midcontinent Independent System Operator, Inc.
Docket No. ER13-2376, Midcontinent Independent System Operator, Inc.
Docket No. ER13-2379, Midcontinent Independent System Operator, Inc.
Docket No. ER13-2124, Midcontinent Independent System Operator, Inc.
Docket No. ER13-2378, Midcontinent Independent System Operator, Inc.
Docket No. ER13-2337, Midcontinent Independent System Operator, Inc.
Docket No. EL13-88, Northern Indiana Public Service Corp. v
Midcontinent Independent System Operator, Inc., et al.
Docket No. EL14-12, ABATE et al. v Midcontinent Independent System
Operator, Inc., et al.
Docket No. AD12-16, Capacity Deliverability across the MISO/PJM Seam
Docket No. AD14-3, Coordination of Energy and Capacity across the MISO/
PJM Seam
Docket No. ER13-2124, Midcontinent Independent System Operator, Inc.
Docket No. ER14-1736, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2605, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2952, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2156, Midcontinent Independent System Operator, Inc.
Docket No. ER14-2445, Midcontinent Independent System Operator, Inc.
Docket No. ER15-142, Midcontinent Independent System Operator, Inc.
Docket No. ER15-685, Midcontinent Independent System Operator, Inc.
Docket No. ER15-945, Midcontinent Independent System Operator, Inc.
Docket No. ER15-530, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1067, Midcontinent Independent System Operator, Inc.
Docket No. ER15-767, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1776, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1877, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1210, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1890, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1289, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1345, Midcontinent Independent System Operator, Inc.
Docket No. ER13-1923, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2050, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1440, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2145, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2186, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2190, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2227, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2256, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2269, Midcontinent Independent System Operator, Inc.
Docket No. ER15-1571, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2338, Midcontinent Independent System Operator, Inc.
Docket No. ER15-2364, Midcontinent Independent System Operator, Inc.
Docket No. EL15-90, Merricourt Power Partners, LLC v Midcontinent
Independent System Operator, Inc.
Docket No. EL15-69, Acciona Wind v Midcontinent Independent System
Operator, Inc.
Docket No. EL15-71, The People of the State of Illinois v Midcontinent
Independent System Operator, Inc.
Docket No. EL15-70, Public Citizen, Inc. v Midcontinent Independent
System Operator, Inc.
Docket No. EL15-77, Morgan Stanley Capital Group, Inc. v Midcontinent
Independent System Operator, Inc.
Docket No. EL15-82, Illinois Industrial Consumers v Midcontinent
Independent System Operator, Inc.
[[Page 51556]]
Docket No. EL15-89, Boston Energy Trading and Marketing, LLC v
Midcontinent Independent System Operator, Inc.
For more information, contact Patrick Clarey, Office of Energy
Markets Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov, or Christopher Miller, Office of
Energy Markets Regulation, Federal Energy Regulatory Commission at
(317) 249-5936 or christopher.miller@ferc.gov.
Dated: August 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-20992 Filed 8-24-15; 8:45 am]
BILLING CODE 6717-01-P