Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, and Information on the Path 15 Transmission Upgrade-Rate Order No. WAPA-173, 51556 [2015-20976]
Download as PDF
51556
Federal Register / Vol. 80, No. 164 / Tuesday, August 25, 2015 / Notices
Docket No. EL15–89, Boston Energy
Trading and Marketing, LLC v
Midcontinent Independent System
Operator, Inc.
For more information, contact Patrick
Clarey, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov, or Christopher
Miller, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (317) 249–5936 or
christopher.miller@ferc.gov.
Dated: August 19, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–20992 Filed 8–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Central Valley Project, CaliforniaOregon Transmission Project, Pacific
Alternating Current Intertie, and
Information on the Path 15
Transmission Upgrade-Rate Order No.
WAPA–173
Western Area Power
Administration, DOE.
ACTION: Notice of Proposed Extension of
Power, Transmission, and Ancillary
Services Formula Rates.
AGENCY:
The Western Area Power
Administration (Western), a power
marketing administration within the
U.S. Department of Energy (DOE),
proposes to extend the existing Central
Valley Project power, transmission, and
ancillary services formula rates,
California-Oregon Transmission Project
transmission formula rate, Pacific
Alternating Current Intertie
transmission formula rate, and thirdparty transmission service formula rate
through September 30, 2019. The
existing Rate Schedules CV–F13, CPP–
2, CV–T3, CV–NWT5, COTP–T3, PACI–
T3, CV–TPT7, CV–UUP1, CV–SPR4,
CV–SUR4, CV–RFS4, CV–EID4, and
CV–GID1 expire on September 30, 2016.
DATES: A consultation and comment
period starts with the publication of this
notice and will end on September 24,
2015. Western will accept written
comments any time during the
consultation and comment period.
ADDRESSES: Send written comments to:
Mr. Subhash Paluru, Regional Manager,
or Ms. Regina Rieger, Rates Manager,
Sierra Nevada Region, Western Area
Power Administration, 114 Parkshore
Drive, Folsom, CA 95630–4710; or email
comments to SNR-Rates@wapa.gov. All
asabaliauskas on DSK5VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:10 Aug 24, 2015
Jkt 235001
documents that Western used to
develop this proposed rate extension are
available for inspection and copying at
the Sierra Nevada Region, located at 114
Parkshore Drive, Folsom, CA 95630–
4710.
FOR FURTHER INFORMATION CONTACT: Ms.
Regina Rieger, Rates Manager, Sierra
Nevada Region, Western Area Power
Administration, 114 Parkshore Drive,
Folsom, CA 95630–4710, telephone
(916) 353–4629, email rieger@wapa.gov.
SUPPLEMENTARY INFORMATION: Western
proposes to extend the current rate
schedules through September 30, 2019.
A three-year formula rate extension
followed by a five-year formula rate
adjustment process will align with the
end of the 2004 Power Marketing Plan,
allowing Western time to review
existing formula rate methodologies,
solicit input from its customers and
other interested parties, and determine
whether revisions to those
methodologies are warranted. The
existing rates provide sufficient revenue
to repay all annual expenses, including
interest expense, and to repay capital
investments within the allowable
periods, thus ensuring repayment
within the cost recovery criteria set
forth in DOE Order RA 6120.2.
By Delegation Order No. 00–037.00A,
effective October 25, 2013, the Secretary
of Energy delegated: (1) The authority to
develop power and transmission rates to
Western’s Administrator; (2) the
authority to confirm, approve, and place
such rates into effect on an interim basis
to the Deputy Secretary of Energy; and
(3) the authority to confirm, approve,
and place into effect on a final basis, to
remand, or to disapprove such rates to
the Federal Energy Regulatory
Commission (FERC).
FERC confirmed and approved the
existing formula rates defined in Rate
Schedules CV–F13, CPP–2, CV–T3, CV–
NWT5, COTP–T3, PACI–T3, CV–TPT7,
CV–UUP1, CV–SPR4, CV–SUR4, CV–
RFS4, CV–EID4, and CV–GID1, filed
under Rate Order No. WAPA–156,1 on
a final basis for five years through
September 30, 2016.2 In accordance
with 10 CFR 903.23(a), Western
proposes to extend the existing power,
transmission, and ancillary services
formula rates without an adjustment.
The rates and revenue requirements
resulting from the approved formula
rate methodologies are recalculated each
year, based on updated financial and
operational data. Western notifies
customers in writing and posts updated
1 See
76 FR 56,906 (September 14, 2011).
U.S. Dept. of Energy, Western Area Power
Admin., Docket No. EF11–9–000, 137 FERC ¶
62,201 (2011).
2 See
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
rates to its Rates Web site: https://
www.wapa.gov/regions/SN/rates/Pages/
rates.aspx and the Open Access SameTime Information Site: https://
www.oasis.oati.com/wasn/,
as necessary.
In accordance with 10 CFR 903.23,
Western determined it is not necessary
to hold a public information or public
comment forum. Western will post
comments received to its Rates Web site,
noted above, after the close of the
comment period. Comments must be
received by the end of the comment and
consultation period to ensure they are
considered by Western. After review of
public comments, Western will take
further action on the proposed formula
rate extension consistent with 10 CFR
903.23.
Dated: August 18, 2015.
Mark A. Gabriel,
Administrator.
[FR Doc. 2015–20976 Filed 8–24–15; 8:45 am]
BILLING CODE 6450–01–P
EVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2015–0022; FRL–9932–67]
Pesticide Product Registrations;
Receipt of Applications for New Uses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has received applications
to register new uses for pesticide
products containing currently registered
active ingredients. Pursuant to the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA), EPA is hereby
providing notice of receipt and
opportunity to comment on these
applications.
SUMMARY:
Comments must be received on
or before September 24, 2015.
ADDRESSES: Submit your comments,
identified by the Docket Identification
(ID) Number and the EPA Registration
Number of interest as shown in the body
of this document, by one of the
following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute.
• Mail: OPP Docket, Environmental
Protection Agency Docket Center (EPA/
DC), (28221T), 1200 Pennsylvania Ave.,
NW., Washington, DC 20460–0001.
DATES:
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 80, Number 164 (Tuesday, August 25, 2015)]
[Notices]
[Page 51556]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-20976]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Central Valley Project, California-Oregon Transmission Project,
Pacific Alternating Current Intertie, and Information on the Path 15
Transmission Upgrade-Rate Order No. WAPA-173
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of Proposed Extension of Power, Transmission, and
Ancillary Services Formula Rates.
-----------------------------------------------------------------------
SUMMARY: The Western Area Power Administration (Western), a power
marketing administration within the U.S. Department of Energy (DOE),
proposes to extend the existing Central Valley Project power,
transmission, and ancillary services formula rates, California-Oregon
Transmission Project transmission formula rate, Pacific Alternating
Current Intertie transmission formula rate, and third-party
transmission service formula rate through September 30, 2019. The
existing Rate Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-
T3, CV-TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1
expire on September 30, 2016.
DATES: A consultation and comment period starts with the publication of
this notice and will end on September 24, 2015. Western will accept
written comments any time during the consultation and comment period.
ADDRESSES: Send written comments to: Mr. Subhash Paluru, Regional
Manager, or Ms. Regina Rieger, Rates Manager, Sierra Nevada Region,
Western Area Power Administration, 114 Parkshore Drive, Folsom, CA
95630-4710; or email comments to SNR-Rates@wapa.gov. All documents that
Western used to develop this proposed rate extension are available for
inspection and copying at the Sierra Nevada Region, located at 114
Parkshore Drive, Folsom, CA 95630-4710.
FOR FURTHER INFORMATION CONTACT: Ms. Regina Rieger, Rates Manager,
Sierra Nevada Region, Western Area Power Administration, 114 Parkshore
Drive, Folsom, CA 95630-4710, telephone (916) 353-4629, email
rieger@wapa.gov.
SUPPLEMENTARY INFORMATION: Western proposes to extend the current rate
schedules through September 30, 2019. A three-year formula rate
extension followed by a five-year formula rate adjustment process will
align with the end of the 2004 Power Marketing Plan, allowing Western
time to review existing formula rate methodologies, solicit input from
its customers and other interested parties, and determine whether
revisions to those methodologies are warranted. The existing rates
provide sufficient revenue to repay all annual expenses, including
interest expense, and to repay capital investments within the allowable
periods, thus ensuring repayment within the cost recovery criteria set
forth in DOE Order RA 6120.2.
By Delegation Order No. 00-037.00A, effective October 25, 2013, the
Secretary of Energy delegated: (1) The authority to develop power and
transmission rates to Western's Administrator; (2) the authority to
confirm, approve, and place such rates into effect on an interim basis
to the Deputy Secretary of Energy; and (3) the authority to confirm,
approve, and place into effect on a final basis, to remand, or to
disapprove such rates to the Federal Energy Regulatory Commission
(FERC).
FERC confirmed and approved the existing formula rates defined in
Rate Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-
TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1, filed
under Rate Order No. WAPA-156,\1\ on a final basis for five years
through September 30, 2016.\2\ In accordance with 10 CFR 903.23(a),
Western proposes to extend the existing power, transmission, and
ancillary services formula rates without an adjustment. The rates and
revenue requirements resulting from the approved formula rate
methodologies are recalculated each year, based on updated financial
and operational data. Western notifies customers in writing and posts
updated rates to its Rates Web site: https://www.wapa.gov/regions/SN/rates/Pages/rates.aspx and the Open Access Same-Time Information Site:
https://www.oasis.oati.com/wasn/, as necessary.
---------------------------------------------------------------------------
\1\ See 76 FR 56,906 (September 14, 2011).
\2\ See U.S. Dept. of Energy, Western Area Power Admin., Docket
No. EF11-9-000, 137 FERC ] 62,201 (2011).
---------------------------------------------------------------------------
In accordance with 10 CFR 903.23, Western determined it is not
necessary to hold a public information or public comment forum. Western
will post comments received to its Rates Web site, noted above, after
the close of the comment period. Comments must be received by the end
of the comment and consultation period to ensure they are considered by
Western. After review of public comments, Western will take further
action on the proposed formula rate extension consistent with 10 CFR
903.23.
Dated: August 18, 2015.
Mark A. Gabriel,
Administrator.
[FR Doc. 2015-20976 Filed 8-24-15; 8:45 am]
BILLING CODE 6450-01-P