LNG Development Company, LLC; Oregon Pipeline Company, LLC; Northwest Pipeline LLC; Notice of Public Meetings for Comments On the Draft Environmental Impact Statement for the Oregon LNG Terminal and Pipeline Project and Washington Expansion Project, 50848 [2015-20742]
Download as PDF
50848
Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Notices
[FR Doc. 2015–20743 Filed 8–20–15; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
LNG Development Company, LLC;
Oregon Pipeline Company, LLC;
Northwest Pipeline LLC; Notice of
Public Meetings for Comments On the
Draft Environmental Impact Statement
for the Oregon LNG Terminal and
Pipeline Project and Washington
Expansion Project
The staff of the Federal Energy
Regulatory Commission (Commission)
has prepared a draft environmental
impact statement (EIS) for the Oregon
LNG Terminal and Pipeline Project
rmajette on DSK7SPTVN1PROD with NOTICES
Kent Senior Activity Center,
600 East Smith Street,
Kent, Washington 98030,
(253) 856–5150.
Sedro-Woolley Community
Center, 703 Pacific Street,
Sedro-Woolley, Washington 98284, (360) 855–
3568.
Snohomish Senior Center,
506 4th Street, Snohomish, WA 98290, (360)
568–0934.
Southwest Washington Fairgrounds-Community
Events Building, 2555 N
National Avenue, Chehalis, Washington 98532,
(360) 736–6072.
Clatsop County FairgroundsExhibit Hall, 92937
Walluski Loop, Astoria, Oregon 97103, (503) 325–
4600.
Clatsop County FairgroundsExhibit Hall, 92937
Walluski Loop, Astoria, Oregon 97103, (503) 325–
4600.
Vernonia High School-Commons Area, 1000 Missouri
Avenue, Vernonia, Oregon
97064, (503) 429–1333.
Summit Grove Lodge, 30810
NE Timmen Road,
Ridgefield, WA 98642,
360–263–6623.
Red Lion Hotel, 510 S Kelso
Drive, Kelso, Washington
98626, (360) 636–4400.
September 16,
2015, 6
p.m.–9 p.m.
[Docket Nos. CP09–6–001; CP09–7–001;
Docket No. CP13–507–000]
1 Common Metrics Commission Staff Report,
Docket No. AD14–15–000, at 4 (Aug. 26, 2014).
2 On August 6, 2015, OMB approved a request for
reinstatement and revision of information collection
FERC–922, ‘‘Performance Metrics for ISOs, RTOs
and Regions Outside ISOs and RTOs’’ (OMB
Control No. 1902–0262).
3 Information should be submitted in docket no.
AD14–15–000. Submissions must be formatted and
filed in accordance with the submission guidelines
described at: https://www.ferc.gov/resources/guides/
submission-guide.asp. Submissions must be in an
acceptable file format as described at: https://
www.ferc.gov/docs-filing/elibrary/accept-fileformats.asp. The numeric values corresponding to
all charts and tables containing metrics must be
submitted in an accompanying file, in one of the
following formats: Microsoft Office 2003/2007/
2010: Excel (.xls or .xlsx), or ASCII Comma
Separated Value (.csv).
15:07 Aug 20, 2015
Location
Dated: August 17, 2015.
Kimberly D. Bose,
Secretary.
September 15,
2015, 6
p.m.–9 p.m.
DEPARTMENT OF ENERGY
VerDate Sep<11>2014
process by Commission staff, after
which speakers will be called. The
meeting will end once all speakers have
provided their comments or at the end
time for each meeting stated above,
whichever comes first. If a significant
number of people are interested in
providing verbal comments, a time limit
of three minutes may be implemented
for each commenter to ensure all those
wishing to comment have the
opportunity to do so within the
designated meeting time. Speakers
should structure their oral comments
accordingly. If time limits are
implemented, they will be strictly
enforced to ensure that as many
individuals as possible are given an
opportunity to comment. It is important
to note that oral comments hold the
same weight as written or electronically
submitted comments.
September 14,
2015, 6
p.m.–9 p.m.
Dated: August 17, 2015.
Kimberly D. Bose,
Secretary.
proposed by LNG Development
Company, LLC and Oregon Pipeline
Company, LLC and the Washington
Expansion Project proposed by
Northwest Pipeline LLC in the abovereferenced dockets. The draft EIS was
issued on August 5, 2015, and the
public comment period for the
document will end on October 6, 2015.
The notice of availability for the draft
EIS clarifies the methods to submit
written and electronic comments. In
lieu of sending written or electronic
comments, the Commission invites you
to attend one of the public comment
meetings its staff will conduct in the
project area to receive oral comments on
the draft EIS. Transcripts of the
meetings will be available for review in
eLibrary under the project docket
numbers. The meeting times and
locations are provided below.
Date and time
information on the common metrics on
a schedule to be specified in the notice.1
Consistent with the OMB-approved
data collection 2 and past practice
regarding this effort, ISOs, RTOs, and
utilities in non-ISO/RTO regions are
encouraged to submit information
responsive to the 30 common metrics
listed in the August 2014 report.
Information submitted should cover the
2010–2014 period, and should be
submitted by October 30, 2015.3
Commission staff plans to contact
representatives of the ISOs, RTOs, and
utilities in non-ISO/RTO regions that
have previously participated in this
effort.
For further information, please
contact: Eric Krall, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426, (202) 502–
6180, eric.krall@ferc.gov.
Jkt 235001
September 17,
2015, 6
p.m.–9 p.m.
September 21,
2015, 1
p.m.–4 p.m.
September 21,
2015, 6
p.m.–9 p.m.
September 22,
2015, 6
p.m.–9 p.m.
September 23,
2015, 6
p.m.–9 p.m.
September 24,
2015, 6
p.m.–9 p.m.
The Commission’s staff will begin the
sign-up of speakers one-half hour before
the meeting begins. The comment
meeting will begin with a brief
description of our environmental review
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
[FR Doc. 2015–20742 Filed 8–20–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13511–002]
Igiugig Village Council; Notice
Concluding Pre-Filing Process and
Approving Process Plan and Schedule
a. Type of Filing: Notice of Intent to
File an Application for a Hydrokinetic
Pilot Project.
b. Project No.: 13511–002.
c. Date Filed: April 1, 2015.
d. Submitted By: Igiugig Village
Council (Igiugig).
e. Name of Project: Igiugig
Hydrokinetic Project.
f. Location: On the Kvichak River in
the Lake and Peninsula Borough, near
the town of Igiugig, Alaska. The project
would not occupy any federal lands.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Applicant Contact: AlexAnna
Salmon, President, Igiugig Village
Council, P.O. Box 4008, Igiugig, Alaska
99613; (907) 533–3211.
i. FERC Contact: Dianne Rodman
(202) 502–6077.
j. Igiugig has filed with the
Commission: (1) A notice of intent to
file an application for a pilot
hydrokinetic hydropower project and a
draft license application with
monitoring plans; (2) a request for
waivers of certain Integrated Licensing
Process regulations necessary for
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 80, Number 162 (Friday, August 21, 2015)]
[Notices]
[Page 50848]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-20742]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP09-6-001; CP09-7-001; Docket No. CP13-507-000]
LNG Development Company, LLC; Oregon Pipeline Company, LLC;
Northwest Pipeline LLC; Notice of Public Meetings for Comments On the
Draft Environmental Impact Statement for the Oregon LNG Terminal and
Pipeline Project and Washington Expansion Project
The staff of the Federal Energy Regulatory Commission (Commission)
has prepared a draft environmental impact statement (EIS) for the
Oregon LNG Terminal and Pipeline Project proposed by LNG Development
Company, LLC and Oregon Pipeline Company, LLC and the Washington
Expansion Project proposed by Northwest Pipeline LLC in the above-
referenced dockets. The draft EIS was issued on August 5, 2015, and the
public comment period for the document will end on October 6, 2015. The
notice of availability for the draft EIS clarifies the methods to
submit written and electronic comments. In lieu of sending written or
electronic comments, the Commission invites you to attend one of the
public comment meetings its staff will conduct in the project area to
receive oral comments on the draft EIS. Transcripts of the meetings
will be available for review in eLibrary under the project docket
numbers. The meeting times and locations are provided below.
------------------------------------------------------------------------
Date and time Location
------------------------------------------------------------------------
September 14, 2015, 6 p.m.-9 p.m....... Kent Senior Activity Center,
600 East Smith Street, Kent,
Washington 98030, (253) 856-
5150.
September 15, 2015, 6 p.m.-9 p.m....... Sedro-Woolley Community Center,
703 Pacific Street, Sedro-
Woolley, Washington 98284,
(360) 855-3568.
September 16, 2015, 6 p.m.-9 p.m....... Snohomish Senior Center, 506
4th Street, Snohomish, WA
98290, (360) 568-0934.
September 17, 2015, 6 p.m.-9 p.m....... Southwest Washington
Fairgrounds-Community Events
Building, 2555 N National
Avenue, Chehalis, Washington
98532, (360) 736-6072.
September 21, 2015, 1 p.m.-4 p.m....... Clatsop County Fairgrounds-
Exhibit Hall, 92937 Walluski
Loop, Astoria, Oregon 97103,
(503) 325-4600.
September 21, 2015, 6 p.m.-9 p.m....... Clatsop County Fairgrounds-
Exhibit Hall, 92937 Walluski
Loop, Astoria, Oregon 97103,
(503) 325-4600.
September 22, 2015, 6 p.m.-9 p.m....... Vernonia High School-Commons
Area, 1000 Missouri Avenue,
Vernonia, Oregon 97064, (503)
429-1333.
September 23, 2015, 6 p.m.-9 p.m....... Summit Grove Lodge, 30810 NE
Timmen Road, Ridgefield, WA
98642, 360-263-6623.
September 24, 2015, 6 p.m.-9 p.m....... Red Lion Hotel, 510 S Kelso
Drive, Kelso, Washington
98626, (360) 636-4400.
------------------------------------------------------------------------
The Commission's staff will begin the sign-up of speakers one-half
hour before the meeting begins. The comment meeting will begin with a
brief description of our environmental review process by Commission
staff, after which speakers will be called. The meeting will end once
all speakers have provided their comments or at the end time for each
meeting stated above, whichever comes first. If a significant number of
people are interested in providing verbal comments, a time limit of
three minutes may be implemented for each commenter to ensure all those
wishing to comment have the opportunity to do so within the designated
meeting time. Speakers should structure their oral comments
accordingly. If time limits are implemented, they will be strictly
enforced to ensure that as many individuals as possible are given an
opportunity to comment. It is important to note that oral comments hold
the same weight as written or electronically submitted comments.
Dated: August 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-20742 Filed 8-20-15; 8:45 am]
BILLING CODE 6717-01-P