Notice of Administrative Settlement Agreement Pursuant to Section 122(H) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as Amended, 50849 [2015-20724]
Download as PDF
50849
Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Notices
expedited processing of a license
application for a hydrokinetic pilot
project; (3) a proposed process plan and
schedule; and (4) a request to be
designated as the non-federal
representative for section 7 of the
Endangered Species Act (ESA)
consultation and for section 106
consultation under the National Historic
Preservation Act.
k. A notice was issued on April 23,
2015, soliciting comments on the draft
license application from agencies and
stakeholders. Comments were filed by
non-governmental organizations and
individuals.
l. On April 23, 2015, Igiugig was
designated as the non-federal
representative for section 7 consultation
under the ESA and for section 106
consultation under the National Historic
Preservation Act.
m. The proposed Igiugig Hydrokinetic
Project would consist of: (1) An instream 20- kilowatt (kW), 64-foot-long,
11-foot-high, 43-foot-wide pontoonmounted RivGen Power System Turbine
Generator Unit (TGU) in Phase 1; (2) an
additional in-stream 20-kW pontoonmounted TGU in Phase 2; (3) two
anchoring systems consisting of a
13,000-pound anchor, chain, shackles,
and 150 feet of mooring; (4) a 375-footlong, coated and weighted combined
power, data, and environmental
monitoring cable from the TGU for
Phase 1; and a 675-foot-long cable from
the TGU for Phase 2; (5) an existing 10foot-long by 8-foot-wide shore station
for housing project electronics and Issue
biological assessment February 15,
2015.
n. controls; and (6) appurtenant
facilities. The project is estimated to
have an annual generation of 409,504
kilowatt-hours.
o. The pre-filing process has been
concluded and the requisite regulations
have been waived such that the process
and schedule indicated below can be
implemented.
p. The post-filing process will be
conducted pursuant to the following
schedule. Revisions to the schedule may
be made as needed.
Milestones
Dates
Final license application expected ........................................................................................................................................
Issue notice of acceptance and ready for environmental analysis and request for interventions .......................................
Recommendations, Conditions, Comments and Interventions due .....................................................................................
Issue notice of availability of environmental assessment ....................................................................................................
Issue biological assessment .................................................................................................................................................
Comments due and 10(j) resolution, if needed ....................................................................................................................
q. Register online at https://ferc.gov/
esubscribenow.htm to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: August 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–20745 Filed 8–20–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL 9932–99–Region 3]
Notice of Administrative Settlement
Agreement Pursuant to Section 122(H)
of the Comprehensive Environmental
Response, Compensation, and Liability
Act of 1980, as Amended
Environmental Protection
Agency.
ACTION: Notice; request for public
comment.
AGENCY:
In accordance with the
Comprehensive Environmental
Response, Compensation, and Liability
Act (‘‘CERCLA’’), notice is hereby given
that a proposed administrative
settlement agreement for recovery of
response costs (‘‘Proposed Agreement’’)
associated with the Lin Electric
Superfund Site, Bluefield, Mercer
County, West Virginia (‘‘Site’’) was
executed by the Environmental
rmajette on DSK7SPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
15:07 Aug 20, 2015
Jkt 235001
Protection Agency (‘‘EPA’’) and is now
subject to public comment, after which
EPA may modify or withdraw its
consent if comments received disclose
facts or considerations that indicate that
the Proposed Agreement is
inappropriate, improper, or inadequate.
The Proposed Agreement would resolve
potential EPA claims under Section
107(a) of CERCLA, against Danny E.
Lusk and Gordon M. Lusk, (‘‘Settling
Parties’’). The Proposed Agreement
would require Settling Parties to
reimburse EPA $21,358.00 for response
costs incurred by EPA for the Site.
For thirty (30) days following the date
of publication of this notice, EPA will
receive written comments relating to the
Proposed Agreement. EPA’s response to
any comments received will be available
for public inspection at the U.S.
Environmental Protection Agency,
Region III, 1650 Arch Street,
Philadelphia, PA 19103.
DATES: Comments must be submitted on
or before thirty (30) days after the date
of publication of this notice.
ADDRESSES: The Proposed Agreement
and additional background information
relating to the Proposed Agreement are
available for public inspection at the
U.S. Environmental Protection Agency,
Region III, 1650 Arch Street,
Philadelphia, PA 19103. A copy of the
Proposed Agreement may be obtained
from Robin E. Eiseman (3RC41), Senior
Assistant Regional Counsel, U.S.
Environmental Protection Agency, 1650
Arch Street, Philadelphia, PA 19103.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
November 2, 2015.
November 17, 2015.
December 17, 2015.
February 15, 2016.
February 15, 2016.
March 16, 2016.
Comments should reference the ‘‘Lin
Electric Superfund Site, Proposed
Settlement Agreement’’ and ‘‘EPA
Docket No. CERC–03–2015–0182CR,’’
and should be forwarded to Robin E.
Eiseman at the above address.
FOR FURTHER INFORMATION CONTACT:
Robin E. Eiseman (3RC41), U.S.
Environmental Protection Agency, 1650
Arch Street, Philadelphia, PA 19103,
Phone: (215) 814–2612; eiseman.robin@
epa.gov.
Dated: August 17, 2015.
Karen Melvin,
Acting Director, Hazardous Site Cleanup
Division, U.S. Environmental Protection
Agency, Region III.
[FR Doc. 2015–20724 Filed 8–20–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9932–91–Region 10]
Final National Pollutant Discharge
Elimination System (NPDES) General
Permit for Stormwater Discharges from
Industrial Activities Availability for
Idaho, Federal Operators in
Washington, and the Spokane Tribe
Environmental Protection
Agency (EPA).
ACTION: Notice of corrections to the 2015
Multi-Sector General Permit.
AGENCY:
The Environmental Protection
Agency (EPA) previously announced the
SUMMARY:
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 80, Number 162 (Friday, August 21, 2015)]
[Notices]
[Page 50849]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-20724]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL 9932-99-Region 3]
Notice of Administrative Settlement Agreement Pursuant to Section
122(H) of the Comprehensive Environmental Response, Compensation, and
Liability Act of 1980, as Amended
AGENCY: Environmental Protection Agency.
ACTION: Notice; request for public comment.
-----------------------------------------------------------------------
SUMMARY: In accordance with the Comprehensive Environmental Response,
Compensation, and Liability Act (``CERCLA''), notice is hereby given
that a proposed administrative settlement agreement for recovery of
response costs (``Proposed Agreement'') associated with the Lin
Electric Superfund Site, Bluefield, Mercer County, West Virginia
(``Site'') was executed by the Environmental Protection Agency
(``EPA'') and is now subject to public comment, after which EPA may
modify or withdraw its consent if comments received disclose facts or
considerations that indicate that the Proposed Agreement is
inappropriate, improper, or inadequate. The Proposed Agreement would
resolve potential EPA claims under Section 107(a) of CERCLA, against
Danny E. Lusk and Gordon M. Lusk, (``Settling Parties''). The Proposed
Agreement would require Settling Parties to reimburse EPA $21,358.00
for response costs incurred by EPA for the Site.
For thirty (30) days following the date of publication of this
notice, EPA will receive written comments relating to the Proposed
Agreement. EPA's response to any comments received will be available
for public inspection at the U.S. Environmental Protection Agency,
Region III, 1650 Arch Street, Philadelphia, PA 19103.
DATES: Comments must be submitted on or before thirty (30) days after
the date of publication of this notice.
ADDRESSES: The Proposed Agreement and additional background information
relating to the Proposed Agreement are available for public inspection
at the U.S. Environmental Protection Agency, Region III, 1650 Arch
Street, Philadelphia, PA 19103. A copy of the Proposed Agreement may be
obtained from Robin E. Eiseman (3RC41), Senior Assistant Regional
Counsel, U.S. Environmental Protection Agency, 1650 Arch Street,
Philadelphia, PA 19103. Comments should reference the ``Lin Electric
Superfund Site, Proposed Settlement Agreement'' and ``EPA Docket No.
CERC-03-2015-0182CR,'' and should be forwarded to Robin E. Eiseman at
the above address.
FOR FURTHER INFORMATION CONTACT: Robin E. Eiseman (3RC41), U.S.
Environmental Protection Agency, 1650 Arch Street, Philadelphia, PA
19103, Phone: (215) 814-2612; eiseman.robin@epa.gov.
Dated: August 17, 2015.
Karen Melvin,
Acting Director, Hazardous Site Cleanup Division, U.S. Environmental
Protection Agency, Region III.
[FR Doc. 2015-20724 Filed 8-20-15; 8:45 am]
BILLING CODE 6560-50-P