Environmental Impact Statements; Notice of Availability, 48854 [2015-20084]
Download as PDF
48854
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–20081 Filed 8–13–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP15–1183–000.
Applicants: Eni Petroleum US LLC, et.
al.
Description: Joint Petition of Eni
Petroleum US LLC, et. al. for Temporary
Waiver of Capacity Release Regulations
and Policies and Request for Expedited
Action.
Filed Date: 8/6/15.
Accession Number: 20150806–5123.
Comments Due: 5 p.m. ET 8/13/15.
Docket Numbers: RP15–1184–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing:
Revisions Related to Lease Modification
to be effective 9/1/2014
Filed Date: 8/7/15.
Accession Number: 20150807–5091.
Comments Due: 5 p.m. ET 8/19/15.
Docket Numbers: RP15–1185–000.
Applicants: Enable Mississippi River
Transmission, L.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing to Amend LER
5680’s Attachment A_8–7–15 to be
effective 8/7/2015.
Filed Date: 8/7/15.
Accession Number: 20150807–5186.
Comments Due: 5 p.m. ET 8/19/15.
Docket Numbers: RP15–1186–000.
Applicants: Paiute Pipeline Company.
Description: § 4(d) Rate Filing: Nonconforming TSA–F30A to be effective 8/
7/2015.
Filed Date: 8/7/15.
Accession Number: 20150807–5202.
Comments Due: 5 p.m. ET 8/19/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
18:50 Aug 13, 2015
Jkt 235001
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP15–301–001.
Applicants: Equitrans, L.P.
Description: Compliance filing
Interruptible Balancing Service—
Compliance Filing to be effective
9/6/2015.
Filed Date: 8/6/15.
Accession Number: 20150806–5106.
Comments Due: 5 p.m. ET 8/18/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–20082 Filed 8–13–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9022–4]
Environmental Impact Statements;
Notice of Availability
Office of Federal Activities,
General Information (202) 564–7146 or
https://www2.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements.
Filed 08/03/2015 Through 08/07/2015.
Pursuant to 40 CFR 1506.9.
AGENCY:
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20150215, Revised Draft, USFS,
SC, Francis Marion Forest Plan
PO 00000
Frm 00051
Fmt 4703
Sfmt 9990
Revision, Comment Period Ends:
11/11/2015, Contact: Mary Morrison
803–561–4058.
EIS No. 20150216, Final, USFS, UT,
Monroe Mountain Aspen Ecosystems
Restoration Project, Review Period
Ends: 10/05/2015, Contact: Jason
Kling 435–896–1080.
EIS No. 20150217, Draft, RUS, PR,
Arecibo Waste-to-Energy and
Resource Recovery Project, Comment
Period Ends: 09/28/2015, Contact:
Lauren McGee Rayburn 202–695–
2540.
EIS No. 20150218, Draft, FERC, OR,
Oregon Liquefied Natural Gas (LNG)
and Washington Expansion Projects,
Comment Period Ends: 10/06/2015,
Contact: Medha Kochhar 202–502–
8964.
EIS No. 20150219, Final, NRC, NH,
NUREG–1437, Generic—License
Renewal of Nuclear Plants
Supplement 46 Regarding Seabrook
Station, Review Period Ends: 09/14/
2015, Contact: Lois M. James 301–
415–3306.
EIS No. 20150220, Final, FHWA, ID,
US–95 Thorncreek Road to Moscow,
Review Period Ends: 09/14/2015,
Contact: Kyle P. Holman 208–334–
9180 ext.127.
EIS No. 20150221, Draft, BLM, NV, Bald
Mountain Mine North and South
Operations Area Projects, Comment
Period Ends: 09/28/2015, Contact:
Miles Kreidler 509–536–1222.
EIS No. 20150222, Final, BR, CA, Shasta
Lake Water Resources Investigation,
Review Period Ends: 09/14/2015,
Contact: Katrina Chow 916–978–5067.
EIS No. 20150223, Final, USFS, OR,
Goose Project, Review Period Ends:
10/01/2015, Contact: Elysia Retzlaff
541–822–7214.
EIS No. 20150224, Final, USFS, CO,
Breckenridge Multi-Season Recreation
Projects, Review Period Ends: 09/28/
2015, Contact: Roger Poirier 970–945–
3245.
Amended Notices
EIS No. 20150109, Draft, STB, MT,
Tongue River Railroad, Comment
Period Ends: 09/23/2015, Contact:
Ken Blodgett 1–866–622–4355:
Revision to FR Notice Published
07/10/2015; Extending Comment
Period from 08/24/2015 to 09/23/
2015.
Dated: August 11, 2015.
Karin Leff,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2015–20084 Filed 8–13–15; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\14AUN1.SGM
14AUN1
Agencies
[Federal Register Volume 80, Number 157 (Friday, August 14, 2015)]
[Notices]
[Page 48854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-20084]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9022-4]
Environmental Impact Statements; Notice of Availability
AGENCY: Office of Federal Activities, General Information (202) 564-
7146 or https://www2.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements.
Filed 08/03/2015 Through 08/07/2015.
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20150215, Revised Draft, USFS, SC, Francis Marion Forest Plan
Revision, Comment Period Ends: 11/11/2015, Contact: Mary Morrison 803-
561-4058.
EIS No. 20150216, Final, USFS, UT, Monroe Mountain Aspen Ecosystems
Restoration Project, Review Period Ends: 10/05/2015, Contact: Jason
Kling 435-896-1080.
EIS No. 20150217, Draft, RUS, PR, Arecibo Waste-to-Energy and Resource
Recovery Project, Comment Period Ends: 09/28/2015, Contact: Lauren
McGee Rayburn 202-695-2540.
EIS No. 20150218, Draft, FERC, OR, Oregon Liquefied Natural Gas (LNG)
and Washington Expansion Projects, Comment Period Ends: 10/06/2015,
Contact: Medha Kochhar 202-502-8964.
EIS No. 20150219, Final, NRC, NH, NUREG-1437, Generic--License Renewal
of Nuclear Plants Supplement 46 Regarding Seabrook Station, Review
Period Ends: 09/14/2015, Contact: Lois M. James 301-415-3306.
EIS No. 20150220, Final, FHWA, ID, US-95 Thorncreek Road to Moscow,
Review Period Ends: 09/14/2015, Contact: Kyle P. Holman 208-334-9180
ext.127.
EIS No. 20150221, Draft, BLM, NV, Bald Mountain Mine North and South
Operations Area Projects, Comment Period Ends: 09/28/2015, Contact:
Miles Kreidler 509-536-1222.
EIS No. 20150222, Final, BR, CA, Shasta Lake Water Resources
Investigation, Review Period Ends: 09/14/2015, Contact: Katrina Chow
916-978-5067.
EIS No. 20150223, Final, USFS, OR, Goose Project, Review Period Ends:
10/01/2015, Contact: Elysia Retzlaff 541-822-7214.
EIS No. 20150224, Final, USFS, CO, Breckenridge Multi-Season Recreation
Projects, Review Period Ends: 09/28/2015, Contact: Roger Poirier 970-
945-3245.
Amended Notices
EIS No. 20150109, Draft, STB, MT, Tongue River Railroad, Comment Period
Ends: 09/23/2015, Contact: Ken Blodgett 1-866-622-4355: Revision to FR
Notice Published 07/10/2015; Extending Comment Period from 08/24/2015
to 09/23/2015.
Dated: August 11, 2015.
Karin Leff,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2015-20084 Filed 8-13-15; 8:45 am]
BILLING CODE 6560-50-P