Approval and Promulgation of Air Quality Implementation Plans; Iowa; Update to Materials Incorporated by Reference, 48718-48730 [2015-19588]
Download as PDF
48718
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
Appendix A
SUPPLEMENTARY INFORMATION:
USPS-APPROVED INDEPENDENT TEST
LABORATORIES
To obtain the latest list of USPS-approved
test labs, contact:
USPS ENGINEERING SYSTEMS, DELIVERY
AND RETAIL TECHNOLOGY, 8403 LEE
HIGHWAY, MERRIFIELD, VA 22082–8101
Additional test laboratories may be added
provided they satisfy USPS certification
criteria. Interested laboratories should
contact:
USPS ENGINEERING, TEST EVALUATION
AND QUALITY, 8403 LEE HIGHWAY,
MERRIFIELD, VA 22082–8101
I. Background
The SIP is a living document which
the state revises as necessary to address
the unique air pollution problems in the
state. Therefore, EPA from time to time
must take action on SIP revisions
containing new and/or revised
regulations to make them part of the
SIP. On May 22, 1997 (62 FR 27968),
EPA revised the procedures for
incorporating by reference Federallyapproved SIPs, as a result of
consultations between EPA and the
Office of Federal Register. The
description of the revised SIP
document, IBR procedures and
‘‘Identification of plan’’ format are
discussed in further detail in the May
22, 1997, Federal Register document.
On February 12, 1999, EPA published
a document in the Federal Register (64
FR 7091) beginning the new IBR
procedure for Iowa. On September 23,
2004 (69 FR 56942), and on July 29,
2009, (74 FR 37556) EPA published an
update to the IBR material for Iowa.
In this document, EPA is publishing
an updated set of tables listing the
regulatory (i.e., IBR) materials in the
Iowa SIP taking into account the
additions, deletions, and revisions to
those materials previously submitted by
the state agency and approved by EPA.
We are removing the EPA Headquarters
Library from paragraph (b)(3), as IBR
materials are no longer available at this
location. In addition, EPA has found
errors in certain entries listed in 40 CFR
52.820(c), as amended in the published
IBR update actions listed above, and is
correcting them in this document. Table
(c) revisions include:
• Adding the inadvertent omission of
the following explanation to the
explanation column for 567.22.1
(Permits Required for New or Existing
Stationary Sources): In 22.1(3) the
following sentence regarding electronic
submission is not SIP approved. The
sentence is ‘‘Alternatively, the owner or
operator may apply for a construction
permit for a new or modified stationary
source through the electronic submittal
format specified by the department’’.
• Adding the inadvertent omission of
the following explanation to the
explanation column for 567–22.3
(Issuing Permits): Subrule 22.3(6) has
not been approved as part of the SIP.
Subrule 22.3(6), Limits on Hazardous
Air Pollutants, has been approved under
Title V and section 112(l). The
remainder of the rule has not been
approved pursuant to Title V and
section 112(l).
• 567.22.105 (Title V Permit
Applications): Correcting the state
[FR Doc. 2015–20033 Filed 8–13–15; 8:45 am]
BILLING CODE 7710–12–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R07–OAR–2015–0103 FRL–9926–85–
Region 7]
Approval and Promulgation of Air
Quality Implementation Plans; Iowa;
Update to Materials Incorporated by
Reference
Environmental Protection
Agency (EPA).
ACTION: Final rule; notice of
administrative change.
AGENCY:
The Environmental Protection
Agency (EPA) is updating the materials
submitted by Iowa that are incorporated
by reference (IBR) into the state
implementation plan (SIP). EPA is also
notifying the public of the correction of
certain typographical errors within the
IBR table. The regulations affected by
this update have been previously
submitted by the state agency and
approved by EPA. This update affects
the SIP materials that are available for
public inspection at the National
Archives and Records Administration
(NARA), and the Regional Office.
DATES: This rule is effective on August
14, 2015.
ADDRESSES: SIP materials which are
incorporated by reference into 40 CFR
part 52 are available for inspection at
the following locations: Environmental
Protection Agency, Region 7, 11201
Renner Boulevard, Lenexa, Kansas
66219; or at https://www.epa.gov/
region07/air/rules/fedapprv.htm; For
information on the availability of this
material at NARA, call (202) 741–6030,
or go to: www.archives.gov/federalregister/cfr/ibr-locations.html.
FOR FURTHER INFORMATION CONTACT: Jan
Simpson at (913) 551–7089, or by email
at simpson.jan@epa.gov.
tkelley on DSK3SPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00036
Fmt 4700
Sfmt 4700
effective date, correcting the EPA
approval date column to the correct date
and Federal Register citation, and
adding the inadvertent omission of the
following explanation to the
explanation column: In 22.105(1) Duty
to apply the last sentence
‘‘Alternatively, an owner or operator
may submit a complete and timely
application through the electronic
submittal format specified by the
department.’’ is not approved. In
22.105(1) ‘‘a’’ new subparagraph (9) is
not approved.
• Adding the inadvertent omission of
the following explanation to the
explanation column for 567–23.1
(Emission Standards): Sections 23.1(2)–
(5) are not approved in the SIP. Section
23.1(5) is approved as part of the 111(d)
plan.
Table (e) revisions include:
• Adding text in the explanation
column for (4)–(39).
II. EPA Action
In this action, EPA is doing the
following:
A. Announcing the update to the IBR
material as of December 31, 2014;
B. Revising the entry in paragraph
52.820(b) to reflect the update and
corrections;
C. Revising certain entries in
paragraph 52.820 (c) as described above;
D. Correcting the date format in the
‘‘State effective date’’ or ‘‘State
submittal date’’ and ‘‘EPA approval
date’’ columns in paragraphs 52.820 (c),
(d) and (e). Dates are numerical month/
day/year without additional zeros;
E. Modifying the Federal Register
citation in paragraphs 52.820 (c), (d) and
(e) to reflect the beginning page of the
preamble as opposed to the page
number of the regulatory text.
EPA has determined that today’s rule
falls under the ‘‘good cause’’ exemption
in section 553(b)(3)(B) of the
Administrative Procedures Act (APA)
which, upon finding ‘‘good cause,’’
authorizes agencies to dispense with
public participation and section
553(d)(3), which allows an agency to
make a rule effective immediately
(thereby avoiding the 30-day delayed
effective date otherwise provided for in
the APA). Today’s rule simply codifies
provisions which are already in effect as
a matter of law in Federal and approved
State programs. Under section 553 of the
APA, an agency may find good cause
where procedures are ‘‘impractical,
unnecessary, or contrary to the public
interest.’’ Public comment is
‘‘unnecessary’’ and ‘‘contrary to the
public interest’’ since the codification
only reflects existing law. Immediate
notice in the CFR benefits the public by
E:\FR\FM\14AUR1.SGM
14AUR1
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
tkelley on DSK3SPTVN1PROD with RULES
providing notice of the updated Iowa
SIP compilation.
Statutory and Executive Order Reviews
In this rule, EPA is finalizing
regulatory text that includes
incorporation by reference. In
accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation
by reference of the Iowa regulations
described in the amendments to 40 CFR
part 52 set forth below. EPA has made,
and will continue to make, these
documents generally available
electronically through
www.regulations.gov and/or in hard
copy at the appropriate EPA office (see
the ADDRESSES section of this preamble
for more information).
Under the CAA, the Administrator is
required to approve a SIP submission
that complies with the provisions of the
Act and applicable Federal regulations.
42 U.S.C. 7410(k); 40 CFR 52.02(a).
Thus, in reviewing SIP submissions,
EPA’s role is to approve state choices,
provided that they meet the criteria of
the CAA. Accordingly, this action
merely approves state law as meeting
Federal requirements and does not
impose additional requirements beyond
those imposed by state law. For that
reason, this action:
• Is not a ‘‘significant regulatory
action’’ under the terms of Executive
Order 12866 (58 FR 51735, October 4,
1993) and is therefore not subject to
review under Executive Orders 12866
and 13563 (76 FR 3821, January 21,
2011).
• Does not impose an information
collection burden under the provisions
of the Paperwork Reduction Act (44
U.S.C. 3501 et seq.);
• is certified as not having a
significant economic impact on a
substantial number of small entities
under the Regulatory Flexibility Act (5
U.S.C. 601 et seq.);
• does not contain any unfunded
mandate or significantly or uniquely
affect small governments, as described
in the Unfunded Mandates Reform Act
of 1995 (Pub. L. 104–4);
• does not have Federalism
implications as specified in Executive
Order 13132 (64 FR 43255, August 10,
1999);
• is not an economically significant
regulatory action based on health or
safety risks subject to Executive Order
13045 (62 FR 19885, April 23, 1997);
• is not a significant regulatory action
subject to Executive Order 13211 (66 FR
28355, May 22, 2001);
• is not subject to requirements of
Section 12(d) of the National
Technology Transfer and Advancement
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
Act of 1995 (15 U.S.C. 272 note) because
application of those requirements would
be inconsistent with the CAA; and
• does not provide EPA with the
discretionary authority to address, as
appropriate, disproportionate human
health or environmental effects, using
practicable and legally permissible
methods, under Executive Order 12898
(59 FR 7629, February 16, 1994).
The SIP is not approved to apply on
any Indian reservation land or in any
other area where EPA or an Indian tribe
has demonstrated that a tribe has
jurisdiction. In those areas of Indian
country, the rule does not have tribal
implications and will not impose
substantial direct costs on tribal
governments or preempt tribal law as
specified by Executive Order 13175 (65
FR 67249, November 9, 2000).
The Congressional Review Act, 5
U.S.C. 801 et seq., as added by the Small
Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. EPA will submit a
report containing this action and other
required information to the U.S. Senate,
the U.S. House of Representatives, and
the Comptroller General of the United
States prior to publication of the rule in
the Federal Register. A major rule
cannot take effect until 60 days after it
is published in the Federal Register.
This action is not a ‘‘major rule’’ as
defined by 5 U.S.C. 804(2).
EPA has also determined that the
provisions of section 307(b)(1) of the
CAA pertaining to petitions for judicial
review are not applicable to this action.
Prior EPA rulemaking actions for each
individual component of the Iowa SIP
compilations previously afforded
interested parties the opportunity to file
a petition for judicial review in the
United States Court of Appeals for the
appropriate circuit within 60 days of
such rulemaking action. Thus, EPA sees
no need in this action to reopen the 60day period for filing such petitions for
judicial review for this ‘‘Identification of
plan’’ reorganization update action for
the State of Iowa.
List of Subjects in 40 CFR Part 52
Environmental protection, Air
pollution control, Carbon monoxide,
Incorporation by reference,
Intergovernmental relations, Lead,
Nitrogen dioxide, Ozone, Particulate
matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile
organic compounds.
PO 00000
Frm 00037
Fmt 4700
Sfmt 4700
48719
Dated: April 7, 2015.
Mark Hague,
Acting Regional Administrator, Region 7.
For the reasons stated in the
preamble, the Environmental Protection
Agency amends 40 CFR part 52 as set
forth below: Chapter I, title 40 of the
Code of Federal Regulations is amended
as follows:
PART 52—APPROVAL AND
PROMULGATION OF
IMPLEMENTATION PLANS
1. The authority citation for part 52
continues to read as follows:
■
Authority: 42 U.S.C. 7401 et seq.
Subpart Q Iowa
2. In § 52.820, paragraphs (b), (c), (d)
and (e) are revised to read as follows:
■
§ 52.820
Identification of plan.
*
*
*
*
*
(b) Incorporation by reference. (1)
Material listed in paragraphs (c) and (d)
of this section with an EPA approval
date prior to December 31, 2014, was
approved for incorporation by reference
by the Director of the Federal Register
in accordance with 5 U.S.C. 552(a) and
1 CFR part 51. Material is incorporated
as it exists on the date of the approval,
and notice of any change in the material
will be published in the Federal
Register. Entries in paragraphs (c) and
(d) of this section with EPA approval
dates after December 31, 2014, will be
incorporated by reference in the next
update to the SIP compilation.
(2) EPA Region 7 certifies that the
rules/regulations provided by EPA in
the SIP compilation at the addresses in
paragraph (b)(3) of this section are an
exact duplicate of the officially
promulgated state rules/regulations
which have been approved as part of the
SIP as of December 31, 2014.
(3) Copies of the materials
incorporated by reference may be
inspected at the Environmental
Protection Agency, Region 7, Air
Planning and Development Branch,
11201 Renner Boulevard, Lenexa,
Kansas 66219; and the National
Archives and Records Administration
(NARA). If you wish to obtain material
from the EPA Regional Office, please
call (913) 551–7089. For information on
the availability of this material at
NARA, call (202) 741–6030, or go to:
www.archives.gov/federal-register/cfr/
ibr-locations.html.
(c) EPA-approved regulations.
E:\FR\FM\14AUR1.SGM
14AUR1
48720
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA REGULATIONS
Iowa citation
State effective
date
Title
EPA approval
date
Explanation
Iowa Department of Natural Resources Environmental Protection Commission [567]
Chapter 20—Scope
of
Title—Definitions—Forms—
Rule of Practice
567–20.1 ......................
Scope of Title ....................................
1/15/14
5/15/14, 79 FR
27763.
567–20.2 ......................
Definitions ..........................................
04/22/15
567–20.3 ......................
Air Quality Forms Generally ..............
04/22/15
This rule is a non-substantive description of the Chapters contained
in the Iowa rules. EPA has not approved all of the Chapters to which
this rule refers.
8/10/15, 80 FR
33192.
8/10/15, 80 FR
33192.
Chapter 21—Compliance
567–21.1 ......................
Compliance Schedule .......................
7/12/06
567–21.2 ......................
Variances ...........................................
4/4/07
567–21.3 ......................
Emission Reduction Program ............
3/14/90
567–21.4 ......................
Circumvention of Rules .....................
3/14/90
567–21.5 ......................
Evidence Used in Establishing That
a Violation Has or Is Occurring.
Temporary Electricity Generation for
Disaster Situations.
11/16/94
567–21.6 ......................
10/15/08
8/6/07, 72 FR
43539.
10/16/07, 72 FR
58535.
6/29/90, 55 FR
26690.
6/29/90, 55 FR
26690.
10/30/95, 60 FR
55198.
12/29/09, 74 FR
68692.
Chapter 22—Controlling Pollution
567–22.1 ......................
Permits Required for New or Existing
Stationary Sources.
4/22/15
8/10/15, 80 FR
33192.
567–22.2 ......................
Processing Permit Applications .........
4/22/15
567–22.3 ......................
Issuing Permits ..................................
10/24/12
8/10/15, 80 FR
33192.
1/16/14, 79 FR
2787.
567–22.4 ......................
Special Requirements for Major Stationary Sources Located in Areas
Designated Attainment or Unclassified (PSD).
Special Requirements for Nonattainment Areas.
Permits by Rule .................................
6/11/08
12/29/09, 74 FR
68692.
1/15/14
5/15/14, 79 FR
27763.
5/14/14, 79 FR
27490.
10/25/13, 78 FR
63887.
8/10/15, 80 FR
33192.
567–22.5 ......................
567–22.8 ......................
tkelley on DSK3SPTVN1PROD with RULES
567–22.9 ......................
567–22.10 ....................
VerDate Sep<11>2014
10/23/13
Special Requirements for Visibility
Protection.
Permitting Requirements for Country
Grain Elevators, Country Grain
Terminal Elevators, Grain Terminal
Elevators and Feed Mill Equipment.
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00038
11/11/09
9/10/14
Fmt 4700
Sfmt 4700
E:\FR\FM\14AUR1.SGM
In 22.1(3) the following sentence regarding electronic submission is
not SIP approved. The sentence is
‘‘Alternatively, the owner or operator may apply for a construction
permit for a new or modified stationary source through the electronic submittal format specified by
the department’’.
Subrule 22.3(6) has not been approved as part of the SIP. Subrule
22.3(6), Limits on Hazardous Air
Pollutants, has been approved
under Title V and section 112(l).
The remainder of the rule has not
been approved pursuant to Title V
and section 112(l).
Rescinded and moved to 567–31.20.
14AUR1
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
48721
EPA-APPROVED IOWA REGULATIONS—Continued
State effective
date
EPA approval
date
Iowa citation
Title
567–22.105 ..................
Title V Permit Applications ................
11/11/09
10/25/13, 78 FR
63887.
567–22.200 ..................
Definitions for Voluntary Operating
Permits.
Eligibility for Voluntary Operating
Permits.
Requirement to Have a Title V Permit.
Voluntary Operating Permit Applications.
Voluntary Operating Permit Fees ......
10/18/95
4/30/96, 61 FR
18958.
10/16/07, 72 FR
58535.
6/25/98, 63 FR
34600.
10/25/13, 78 FR
63887.
4/30/96, 61 FR
18958.
4/30/96, 61 FR
18958.
4/30/96, 61 FR
18958.
12/29/09, 74 FR
68692.
4/30/96, 61 FR
18958.
567–22.201 ..................
567–22.202 ..................
567–22.203 ..................
567–22.204 ..................
567–22.205 ..................
4/4/07
4/9/97
11/11/09
12/14/94
12/14/94
567–22.206 ..................
Voluntary Operating Permit Processing Procedures.
Permit Content ..................................
567–22.207 ..................
Relation to Construction Permits ......
10/15/08
567–22.208 ..................
Suspension, Termination, and Revocation of Voluntary Operating
Permits.
Change of Ownership for Facilities
with Voluntary Operating Permits.
Operating permit by rule for small
sources.
12/14/94
567–22.209 ..................
567–22.300 ..................
10/18/95
11/11/09
11/11/09
Explanation
Only subparagraph (2)i(5) is approved as part of the SIP. In
22.105(1) Duty to apply the last
sentence ‘‘Alternatively, an owner
or operator may submit a complete
and timely application through the
electronic submittal format specified by the department.’’ is not approved. In 22.105(1) ‘‘a’’ new subparagraph (9) is not approved.
10/25/13, 78 FR
63887.
10/25/13, 78 FR
63887.
Chapter 23—Emission Standards for Contaminants
567–23.1 ......................
Emission Standards ..........................
11/24/10
10/25/13, 78 FR
63887.
567–23.2 ......................
Open Burning ....................................
1/14/04
11/3/04, 69 FR
63945.
567–23.3 ......................
Specific Contaminants .......................
6/11/08
567–23.4 ......................
Specific Processes ............................
6/11/08
12/29/09, 74 FR
68692.
12/29/09, 74 FR
68692.
Sections 23.1(2)–(5) are not approved in the SIP. Section 23.1 (5)
is approved as part of the 111(d)
plan.
Subrule 23.2(3)g(2) was not submitted for approval. Variances from
open burning rule 23.2(2) are subject to EPA approval.
Subrule 23.3(3) ‘‘(d)’’ is not SIP approved.
Subrule 23.4(10) is not SIP approved.
Chapter 24—Excess Emissions
567–24.1 ......................
Excess Emission Reporting ..............
11/24/10
567–24.2 ......................
Maintenance and Repair Requirements.
3/14/90
10/25/13, 78 FR
63887.
6/29/90, 55 FR
26690.
Chapter 25—Measurement of Emissions
567–25.1 ......................
Testing and Sampling of New and
Existing Equipment.
10/24/12
1/16/14, 79 FR
2787.
tkelley on DSK3SPTVN1PROD with RULES
Chapter 26—Prevention of Air Pollution Emergency Episodes
567–26.1 ......................
General ..............................................
3/14/90
567–26.2 ......................
Episode Criteria .................................
3/14/90
567–26.3 ......................
Preplanned Abatement Strategies ....
3/14/90
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00039
Fmt 4700
Sfmt 4700
6/29/90, 55 FR
26690.
6/29/90, 55 FR
26690.
6/29/90, 55 FR
26690.
E:\FR\FM\14AUR1.SGM
14AUR1
48722
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA REGULATIONS—Continued
State effective
date
Iowa citation
Title
567–26.4 ......................
Actions During Episodes ...................
EPA approval
date
3/14/90
Explanation
6/29/90, 55 FR
26690.
Chapter 27—Certificate of Acceptance
567–27.1 ......................
General ..............................................
3/14/90
567–27.2 ......................
Certificate of Acceptance ..................
3/14/90
567–27.3 ......................
Ordinance or Regulations .................
3/14/90
567–27.4 ......................
Administrative Organization ..............
3/14/90
567–27.5 ......................
Program Activities .............................
3/14/90
6/29/90, 55
26690.
6/29/90, 55
26690.
6/29/90, 55
26690.
6/29/90, 55
26690.
6/29/90, 55
26690.
FR
FR
FR
FR
FR
Chapter 28—Ambient Air Quality Standards
567–28.1 ......................
Statewide Standards .........................
10/23/13
5/14/14, 79 FR
27490.
Chapter 29—Qualification in Visual Determination of the Opacity of Emissions
567–29.1 ......................
Methodology and Qualified Observer
5/13/98
5/22/00, 65 FR
32030.
Chapter 31—Nonattainment Areas
567–31.1 ......................
1/15/14
5/15/14, 79 FR
27763.
5/15/14, 79 FR
27763.
1/15/14
5/15/14, 79 FR
27763.
1/15/14
567–31.9 ......................
Permit Requirements Relating to
Nonattainment Areas.
Conformity of General Federal Actions to the Iowa SIP or Federal
Implementation Plan.
Nonattainment new source review requirements for areas designated
nonattainment on or after May 18,
1998.
Preconstruction review permit program.
Actual PALs .......................................
567–31.10 ....................
Validity of Rules ................................
1/15/14
567–31.20 ....................
Special requirements for nonattainment areas designated before May
18, 1998 (originally adopted in
567–22.5(455B)).
4/22/15
5/15/14, 79
27763.
5/15/14, 79
27763.
5/15/14, 79
27763.
8/10/15, 80
33192.
567–31.2 ......................
567–31.3 ......................
567–31.4 ......................
1/15/14
1/15/14
FR
FR
FR
FR
Chapter 33—Special Regulations and Construction Permit Requirements for Major Stationary Sources—Prevention of Significant
Deterioration (PSD) of Air Quality
567–33.1 ......................
Purpose .............................................
1/15/14
567–33.3 ......................
Special construction permit requirements for major stationary sources
in areas designated attainment or
unclassified (PSD).
Plantwide applicability limitations
(PALs).
Exceptions to adoption by reference
4/22/14
567–33.9 ......................
567–33.10 ....................
11/1/06
11/1/06
5/15/14, 79 FR
27763.
8/10/15, 80 FR
33192.
5/14/07, 72 FR
27056.
5/14/07, 72 FR
27056.
tkelley on DSK3SPTVN1PROD with RULES
Chapter 34—Provisions for Air Quality Emissions Trading Programs
567–34.1 ......................
Purpose .............................................
7/12/06
567–34.201 ..................
CAIR NOX annual trading program
provisions.
CAIR designated representative for
CAIR NOX sources.
Permits ..............................................
11/28/07
567–34.202 ..................
567–34.203 ..................
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00040
7/12/06
7/12/06
Fmt 4700
Sfmt 4700
8/6/07, 72 FR
43539.
4/15/08, 73 FR
20177.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
E:\FR\FM\14AUR1.SGM
14AUR1
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA REGULATIONS—Continued
State effective
date
EPA approval
date
Iowa citation
Title
567–34.205 ..................
CAIR NOX allowance allocations ......
7/12/06
567–34.206 ..................
7/12/06
567–34.207 ..................
CAIR NOX allowance tracking system.
CAIR NOX allowance transfers .........
567–34.208 ..................
Monitoring and reporting ...................
7/12/06
567–34.209 ..................
CAIR NOX opt-in units ......................
7/12/06
567–34.210 ..................
CAIR SO2 trading program ...............
11/28/07
567–34.220 ..................
CAIR NOX ozone season trading
program.
CAIR NOX ozone season trading
program general.
CAIR designated representative for
CAIR NOX ozone season sources.
CAIR NOX ozone season permits .....
7/12/06
567–34.221 ..................
567–34.222 ..................
567–34.223 ..................
567–34.225 ..................
567–34.226 ..................
567–34.227 ..................
567–34.228 ..................
tkelley on DSK3SPTVN1PROD with RULES
567–34.229 ..................
VerDate Sep<11>2014
7/12/06
11/28/07
7/12/06
7/12/06
CAIR NOX ozone season allowance
allocations.
CAIR NOX ozone season allowance
tracking system.
CAIR NOX ozone season allowance
transfers.
CAIR NOX ozone season monitoring
and reporting.
CAIR NOX ozone season opt-in units
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00041
7/12/06
7/12/06
7/12/06
7/12/06
7/12/06
Fmt 4700
Sfmt 4700
Explanation
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
4/15/08, 73 FR
20177.
8/6/07, 72 FR
43539.
4/15/08, 73 FR
20177.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
8/6/07, 72 FR
43539.
E:\FR\FM\14AUR1.SGM
14AUR1
48723
48724
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA REGULATIONS—Continued
Iowa citation
State effective
date
Title
EPA approval
date
Explanation
Linn County
Chapter 10 ...................
Linn County Air Quality Ordinance,
Chapter 10.
1/30/15
9/28/15, 80 FR
44870.
The following definitions are not SIPapproved in Chapter 10.2; Anaerobic lagoon, Biomass, Chemical
processing plants (ethanol production facilities that produce ethanol
by natural fermentation included in
NAICS code 325193 or 312140
are not included in this definition);
Federally Enforceable; Greenhouse gases; Maximum Achievable Control Technology (MACT);
MACT floor. The following sections
are not SIP approved: 10.4(1),
Title V Permits; 10.5(9)‘‘b’’ Locally
Required Permits; Exemptions
from the Authorization to Install
Permit to Operate Requirements;
10.5(9) ‘‘ll’’, Exemption for production painting, adhesive or coating
units; 10.8(2)‘‘b’’ Emissions From
Fuel-Burning Equipment; Emission
Limitation; 10.8(3) Emissions From
Fuel-Burning Equipment; Exemptions for Residential Heaters Burning Solid Fuels; 10.8(4) Emissions
from Fuel-Burning Equipment; Nuisance Conditions for Fuel Burning
Equipment;
10.9(2),
NSPS;
10.9(3), Emission Standards for
HAPs; 10.9(4), Emission Standards for HAPs for Source Categories; 10.10(4) Variance from
rules; 10.11, Emission of Objectionable Odors; 10.15, Variances,
10.17(13) Continuous Emissions
Monitoring from Acid Rain Program 10.17(13) Continuous Emissions Monitoring from Acid Rain
Program, and 10.24, Penalty.
7/06/10, 75 FR
38745.
Article I, Section 5–2, definition of
‘‘variance’’; Article VI, Sections 5–
16(n), (o) and (p); Article VIII; Article IX, Sections 5–27(3) and (4);
Article X, Section 5–28 subsections (a) through (c); Article
XIII, and Article XVI, Section 5–75
are not a part of the SIP.
Polk County
Chapter V .....................
Polk County Board of Health Rules
and Regulations Air Pollution
Chapter V.
08/06/09
(d) EPA-approved State sourcespecific permits.
EPA-APPROVED IOWA SOURCE-SPECIFIC ORDERS/PERMITS
State effective
date
EPA Approval
date
tkelley on DSK3SPTVN1PROD with RULES
Name of source
Order/Permit No.
(1) Archer-Daniels Midland
Company.
(2) Interstate Power Company
(3) Grain Processing Corporation.
(4) Grain Processing Corporation.
90–AQ–10 ..............................
3/25/91
11/1/91, 56 FR 56158 ....
89–AQ–04 ..............................
74–A–015–S ...........................
2/21/90
9/18/95
11/1/91, 56 FR 56158 ....
12/1/97, 62 FR 63454 ....
79–A–194–S ...........................
9/18/95
12/1/97, 62 FR 63454 ....
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00042
Fmt 4700
Sfmt 4700
E:\FR\FM\14AUR1.SGM
14AUR1
Explanation
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
48725
EPA-APPROVED IOWA SOURCE-SPECIFIC ORDERS/PERMITS—Continued
State effective
date
EPA Approval
date
Order/Permit No.
(5) Grain Processing Corporation.
(6) Grain Processing Corporation.
(7) Muscatine Power and
Water.
(8) Muscatine Power and
Water.
(9) Monsanto Corporation .......
(10) Monsanto Corporation .....
(11) IES Utilities, Inc ...............
79–A–195–S ...........................
9/18/95
12/1/97, 62 FR 63454 ....
95–A–374 ...............................
9/18/95
12/1/97, 62 FR 63454 ....
74–A–175–S ...........................
9/14/95
12/1/97, 62 FR 63454 ....
95–A–373 ...............................
9/14/95
12/1/97, 62 FR 63454 ....
76–A–161S3 ...........................
76–A–265S3 ...........................
97–AQ–20 ..............................
7/18/96
7/18/96
11/20/98
12/1/97, 62 FR 63454 ....
12/1/97, 62 FR 63454 ....
3/11/99, 64 FR 12087 ....
(12) Archer-Daniels-Midland
Corporation.
SO2 Emission Control Plan ....
9/14/98
3/11/99, 64 FR 12087 ....
(13) Linwood Mining and Minerals Corporation.
(14) Lafarge Corporation .........
(15) Holnam, Inc ......................
98–AQ–07 ..............................
3/13/98
3/18/99, 64 FR 13343 ....
98–AQ–08 ..............................
A.C.O. 1999–AQ–31 ..............
3/13/98
9/2/99
3/18/99, 64 FR 13343 ....
11/6/02, 67 FR 67563 ....
(16) Holnam, Inc ......................
Consent Amendment to
A.C.O. 1999–AQ–31.
5/16/01
11/6/02, 67 FR 67563 ....
(17) Holnam, Inc ......................
Permits for 17–01–009,
Project Nos. 99–511 and
00–468..
7/24/01
11/6/02, 67 FR 67563 ....
(18) Lehigh Portland Cement
Company.
A.C.O. 1999–AQ–32 ..............
9/2/99
11/6/02, 67 FR 67563 ....
(19) Lehigh Portland Cement
Company.
Permits for plant No. 17–01–
005, Project Nos. 99–631
and 02–037.
2/18/02
11/6/02, 67 FR 67563 ....
(20) Blackhawk Foundry and
Machine Company.
A.C.O. 03–AQ–51 ..................
12/4/03
6/10/04, 69 FR 32454 ....
(21) Blackhawk Foundry and
Machine Company.
Permit No. 02–A–116 (Cold
Box Core Machine).
8/19/02
6/10/04, 69 FR 32454 ....
(22) Blackhawk Foundry and
Machine Company.
Permit No. 02–A–
290(Wheelabrator #2 and
Casting Sorting).
8/19/02
6/10/04, 69 FR 32454 ....
(23) Blackhawk Foundry and
Machine Company.
tkelley on DSK3SPTVN1PROD with RULES
Name of source
Permit No. 02–A–291 (Mold
Sand Silo).
8/19/02
6/10/04, 69 FR 32454 ....
(24) Blackhawk Foundry and
Machine Company.
Permit No. 02–A–292 (Bond
Storage).
8/19/02
6/10/04, 69 FR 32454 ....
(25) Blackhawk Foundry and
Machine Company.
Permit No. 02–A–293 (Induction Furnace and Aluminum
Sweat Furnace).
8/19/02
6/10/04, 69 FR 32454 ....
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00043
Fmt 4700
Sfmt 4700
E:\FR\FM\14AUR1.SGM
14AUR1
Explanation
SO2 Control Plan for Cedar
Rapids.
ADM Corn Processing SO2
Control Plan for Cedar Rapids.
PM10 control plan for Buffalo.
PM10 control plan for Buffalo.
For a list of the 47 permits
issued for individual emission points see IDNR letters
to Holnam, Inc., dated 7/24/
01.
For a list of the 47 permits
issued for individual emission points see IDNR letters
to Holnam, Inc., dated 7/24/
01.
For a list of the 47 permits
issued for individual emission points see IDNR letters
to Holnam, Inc., dated 7/24/
01.
For a list of the 41 permits
issued for individual emission points see IDNR letters
to Lehigh dated 7/24/01 and
2/18/02.
For a list of the 41 permits
issued for individual emission points see IDNR letters
to Lehigh dated 7/24/01 and
2/18/02.
Together with the permits listed below this order comprises the PM10 control
strategy for Davenport,
Iowa.
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
48726
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA SOURCE-SPECIFIC ORDERS/PERMITS—Continued
Name of source
Order/Permit No.
State effective
date
EPA Approval
date
Explanation
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
Permit No. 77–A–114–S1
(Wheelabrator #1 & Grinding).
8/19/02
6/10/04, 69 FR 32454 ....
(27) Blackhawk Foundry and
Machine Company.
Permit No. 84–A–055–S1
(Cupola ladle, Pour deck
ladle, Sand shakeout, Muller, Return sand #1, Sand
cooler, Sand screen, and
Return sand #2).
Permit No. 72–A–060–S5
(Cupola).
8/19/02
6/10/04, 69 FR 32454 ....
(28) Blackhawk Foundry and
Machine Company.
8/19/02
6/10/04, 69 FR 32454 ....
(29) Grain Processing Corporation.
tkelley on DSK3SPTVN1PROD with RULES
(26) Blackhawk Foundry and
Machine Company.
Administrative Consent Order
NO.2014–AQ–A1.
2/14/14
12/1/14, 79 FR 71025 ....
(30) Muscatine
Water.
(31) Muscatine
Water.
(32) Muscatine
Water.
(33) Muscatine
Water.
(34) Muscatine
Water.
(35) Muscatine
Water.
(36) Muscatine
Water.
(37) Muscatine
Water.
(38) Muscatine
Water.
(39) Muscatine
Water.
(40) Muscatine
Water.
(41) Muscatine
Water.
(42) Muscatine
Water.
(43) Muscatine
Water.
(44) Muscatine
Water.
(45) Muscatine
Water.
(46) Muscatine
Water.
(47) Muscatine
Water.
(48) Muscatine
Water.
(49) Muscatine
Water.
(50) Muscatine
Water.
(51) Muscatine
Water.
(52) Muscatine
Water.
(53) Muscatine
Water.
(54) Muscatine
Water.
(55) Muscatine
Water.
Power and
Permit No. 74–A–175–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–006–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–007–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–191–P2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–193–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–194–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–197–S2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–200–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–201–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 80–A–202–S2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 93–A–283–S2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 93–A–288–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 93–A–289–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 93–A–290–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 93–A–373–P2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 00–A–638–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 00–A–639–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 00–A–689–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 00–A–684–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 00–A–686–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 00–A–687–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 01–A–193–S2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 01–A–218–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 01–A–456–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 01–A–617–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Power and
Permit No. 04–A–618–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
20:18 Aug 13, 2015
Jkt 235001
VerDate Sep<11>2014
PO 00000
Frm 00044
Fmt 4700
Sfmt 4700
E:\FR\FM\14AUR1.SGM
14AUR1
Provisions of the permit that
relate to pollutants other
than PM10 are not approved
by EPA as part of this SIP.
The last sentence of Paragraph 5, Section III and
Section VI are not approved
by EPA as part of the SIP.
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA SOURCE-SPECIFIC ORDERS/PERMITS—Continued
State effective
date
EPA Approval
date
tkelley on DSK3SPTVN1PROD with RULES
Name of source
Order/Permit No.
(56) Muscatine Power and
Water.
(57) Muscatine Power and
Water.
(58) Muscatine Power and
Water.
(59) Muscatine Power and
Water.
(60) Muscatine Power and
Water.
(61) Muscatine Power and
Water.
(62) Muscatine Power and
Water.
(63) Muscatine Power and
Water.
(64) Muscatine Power and
Water.
(65) Muscatine Power and
Water.
(66) Muscatine Power and
Water.
(67) Muscatine Power and
Water.
(68) Muscatine Power and
Water.
(69) Muscatine Power and
Water.
(70) Muscatine Power and
Water.
(71) Muscatine Power and
Water.
(72) Muscatine Power and
Water.
(73) Muscatine Power and
Water.
(74) Muscatine Power and
Water.
(75) Muscatine Power and
Water.
(76) Muscatine Power and
Water.
(77) Muscatine Power and
Water.
(78) Muscatine Power and
Water.
(79) Muscatine Power and
Water.
(80) Muscatine Power and
Water.
(81) Union Tank Car Company
(82) Union Tank Car Company
(83) Union Tank Car Company
(84) Union Tank Car Company
(85) Union Tank Car Company
(86) Union Tank Car Company
(87) Union Tank Car Company
(88) Union Tank Car Company
(89) Union Tank Car Company
(90) Union Tank Car Company
(91) Union Tank Car Company
(92) Union Tank Car Company
(93) Union Tank Car Company
(94) Union Tank Car Company
(95) Union Tank Car Company
(96) Union Tank Car Company
(97) Union Tank Car Company
(98) Union Tank Car Company
(99) Union Tank Car Company
(100) Union Tank Car Company.
Permit No. 04–A–619–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 11–A–562–S1 ......
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–139 .............
7/23/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–140 .............
7/23/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–141 .............
7/23/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–142 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–143 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–146 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–147 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–148 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–150 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–151 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–152 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–153 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–154 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–155 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–157 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–158 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–159 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–161 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 80–A–196–S3 ......
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 93–A–286–S4 ......
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 01–A–457–S4 ......
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 06–A–650–S2 ......
7/22/13
12/1/14, 79 FR 71025 ....
Permit No. 13–A–160 .............
7/22/13
12/1/14, 79 FR 71025 ....
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
Permit
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
4/08/13
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
12/1/14,
VerDate Sep<11>2014
20:18 Aug 13, 2015
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Jkt 235001
93–A–251–S5 ......
93–A–252–S5 ......
93–A–253–S5 ......
93–A–254–S3 ......
00–A–1086–S2 ....
00–A–1087–S2 ....
00–A–1088–S2 ....
93–A–255–S7 ......
96–A–629–S3 ......
96–A–630–S5 ......
96–A–631–S3 ......
96–A–636–S3 ......
00–A–529–S2 ......
00–A–530–S2 ......
00–A–531–S2 ......
00–A–532–S2 ......
00–A–533–S2 ......
93–A–256–S6 ......
96–A–632–S5 ......
96–A–633–S5 ......
PO 00000
Frm 00045
Fmt 4700
Sfmt 4700
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
71025
E:\FR\FM\14AUR1.SGM
Explanation
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
14AUR1
48727
48728
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA SOURCE-SPECIFIC ORDERS/PERMITS—Continued
Name of source
(101) Union
pany.
(102) Union
pany.
(103) Union
pany.
(104) Union
pany.
(105) Union
pany.
(106) Union
pany.
(107) Union
pany.
(108) Union
pany.
(109) Union
pany.
State effective
date
Order/Permit No.
EPA Approval
date
Tank Car Com-
Permit No. 96–A–634–S5 ......
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 96–A–635–S5 ......
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 00–A–1089–S2 ....
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 00–A–1090–S2 ....
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 00–A–1091–S2 ....
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 10–A–043–S2 ......
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 09–A–009–S2 ......
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 09–A–010–S2 ......
4/08/13
12/1/14, 79 FR 71025 ....
Tank Car Com-
Permit No. 94–A–434–S2 ......
4/08/13
Explanation
12/1/14, 79 FR 71025 ....
(e) The EPA approved nonregulatory
provisions and quasi-regulatory
measures.
EPA-APPROVED IOWA NONREGULATORY PROVISIONS
Applicable geographic or
nonattainment area
(1) Air Pollution Control Implementation Plan.
(2) Request for a Two Year Extension to Meet the NAAQS.
(3) Revisions to Appendices D
and G.
(4) Source Surveillance and
Record Maintenance Statements.
(5) Statement Regarding Public
Availability of Emissions Data.
(7) Letter Describing the Certificates of Acceptance for
Local Air Pollution Control
Programs.
(8) High Air Pollution Episode
Contingency Plan.
(9) Summary of Public Hearing
on Revised Rules Which
Were Submitted on July 17,
1975.
(10) Air Quality Modeling to
Support Sulfur Dioxide Emission Standards.
(11) Nonattainment Plans ........
tkelley on DSK3SPTVN1PROD with RULES
Name of nonregulatory
SIP provision
Statewide ..................................
1/27/72
5/31/72, 37 FR 10842
Council Bluffs ...........................
1/27/72
5/31/72, 37 FR 10842
Statewide ..................................
2/2/72
5/31/72, 37 FR 10842
Statewide ..................................
4/14/72
3/2/76, 41 FR 8956 ...
Correction notice published
3/2/76.
Correction notice published
3/2/76.
[FRL 484–4].
Statewide ..................................
5/2/72
3/2/76, 41 FR 8956 ...
[FRL 484–4].
Linn County, Polk County ........
12/14/72
10/1/76, 41 FR 43406
[FRL 616–1].
Statewide ..................................
6/20/73
10/1/76, 41 FR 43406
[FRL 616–1].
Statewide ..................................
9/3/75
10/1/76, 41 FR 43406
[FRL 616–1].
Statewide ..................................
3/4/77
6/1/77, 42 FR 27892
[FRL 739–1].
Mason City, Davenport, Cedar
Rapids, Des Moines.
Linn County ..............................
6/22/79
3/6/80, 45 FR 14561
[FRL 1427–5].
10/8/79
3/6/80, 45 FR 14561
[FRL 1427–5].
Linn County ..............................
11/16/79
3/6/80, 45 FR 14561
[FRL 1427–5].
Statewide ..................................
Statewide ..................................
8/19/80
1/19/81
3/20/81, 46 FR 17778
3/20/81, 46 FR 17778
[A–7–FRL–1776–5].
[A–7–FRL–1776–5].
(12) Information on VOC
Sources to Support the Nonattainment Plan.
(13) Information and Commitments Pertaining to Legally
Enforceable RACT Rules to
Support the Nonattainment
Plan.
(14) Lead Plan .........................
(15) Letter to Support the Lead
Plan.
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
PO 00000
Frm 00046
State submittal
date
Fmt 4700
Sfmt 4700
EPA Approval
date
E:\FR\FM\14AUR1.SGM
14AUR1
Explanation
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
48729
EPA-APPROVED IOWA NONREGULATORY PROVISIONS—Continued
Name of nonregulatory
SIP provision
Applicable geographic or
nonattainment area
State submittal
date
(16) Nonattainment Plans to Attain Secondary Standards.
Mason City, Cedar Rapids,
Des
Moines,
Davenport,
Keokuk, Council Bluffs, Fort
Dodge, Sioux City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
Mason City, Cedar Rapids,
Des
Moines,
Davenport,
Keokuk, Council Bluffs, Fort
Dodge, Sioux City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
Mason City, Cedar Rapids,
Des
Moines,
Davenport,
Keokuk, Council Bluffs, Fort
Dodge, Sioux City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
Mason City, Cedar Rapids,
Des
Moines,
Davenport,
Keokuk, Council Bluffs, Fort
Dodge, Sioux City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
Statewide ..................................
Statewide ..................................
EPA Approval
date
Explanation
4/18/80
4/17/81, 46 FR 22368
[A–7–FRL 1792–2].
9/16/80
4/17/81, 46 FR 22368
[A–7–FRL 1792–2].
11/17/80
4/17/81, 46 FR 22368
[A–7–FRL 1792–2].
6/26/81
3/5/82, 47 FR 9462 ...
[A–7–FRL–2057–7].
7/15/81
5/14/85
4/12/82, 47 FR 15583
9/12/85, 50 FR 37176
[A–5–FRL–2076–5].
[EPA Action IA 1582; A–7–
FRL–2895–9].
Statewide ..................................
4/22/86
7/11/86, 51 FR 25199
[EPA Action IA 2060; A–7–
FRL–3046–8].
Statewide ..................................
4/22/87
6/26/87, 52 FR 23981
[A–7–FRL–3216–5].
Statewide ..................................
Statewide ..................................
10/28/88
11/8/90
8/15/89, 54 FR 33536
2/13/91, 56 FR 5757
[FRL–3627–7].
[FRL–3903–5].
Clinton ......................................
Polk County ..............................
3/13/91
10/23/91
11/1/91, 56 FR 56158
11/29/91, 56 FR
60924.
(28) Letter Concerning Open
Burning Exemptions.
(29) Compliance Sampling
Manual.
(30) Small Business Assistance
Plan.
(31) Voluntary Operating Permit Program.
(32) SO2 Plan ...........................
Statewide ..................................
10/3/91
1/22/92, 57 FR 2472
[IA–21–5182; FRL–4014–4].
[FRL–IA–4–1–5308; FRL–
4034–5] Correction notice
published 1/26/93.
[IA5–1–5380; FRL–4039–5].
Statewide ..................................
1/5/93
5/12/93, 58 FR 27939
[IA–8–1–5750; FRL–4618–6].
Statewide ..................................
12/22/92
9/27/93, 58 FR 50266
[IA–9–1–5859; FRL–4734–5].
Statewide ..................................
4/30/96, 61 FR 18958
[IA 003–1003, FRL–5455–4].
12/1/97, 62 FR 63454
[IA 036–1036, FRL–5929–3].
(33) SO2 Maintenance Plan .....
(34) SO2 Control Plan ..............
(35) PM10 Control Plan ............
(36) CAA 110(a)(2)(D)(i) SIP—
Interstate Transport.
(37) SO2 Maintenance Plan for
the Second 10-year Period.
(38) CAA 110(a)(1) and (2)Ozone Infrastructure SIP.
Muscatine .................................
Cedar Rapids ...........................
Buffalo, Iowa ............................
Statewide ..................................
12/8/94, 2/16/96,
2/27/96
6/19/96
5/21/97
4/25/97
9/11/98
10/1/98
11/22/06
3/19/98, 63 FR 13343
3/11/99, 64 FR 12087
3/18/99, 64 FR 13346
3/8/07, 72 FR 10380
Muscatine .................................
4/5/07
8/1/07; 72 FR 41900
Statewide ..................................
6/15/07
3/04/08; 73 FR 11554
[IA 040–1040(a), FRL–5980–2].
[IA 058–1058a; FRL–6308–5].
[IA 059–1059a; FRL–6310–7].
[EPA–R07–OAR–2006–1015;
FRL–8285–1].
[EPA–R07–OAR–2007–0477,
FRL–8448–5].
[EPA–R07–OAR–2007–1180,
FRL–8535–9].
(17) Information to Support the
Particulate Matter Nonattainment Plan.
(18) Information to Support the
Particulate Matter Nonattainment Plan.
(19) Schedule for Studying
Nontraditional Sources of
Particulate Matter and for Implementing the Results.
tkelley on DSK3SPTVN1PROD with RULES
(20) Air Monitoring Strategy .....
(21) Letter of Commitment to
Revise Unapprovable Portions of Chapter 22.
(22) Letter of Commitment to
Submit Stack Height Regulations and to Implement the
EPA’s Regulations until the
State’s Rules Are Approved.
(23) Letter of Commitment to
Implement the Stack Height
Regulations in a Manner
Consistent with the EPA’s
Stack Height Regulations
with Respect to NSR/PSD
Regulations.
(24) PM10 SIP ...........................
(25) Letter Pertaining to NOX
Rules and Analysis Which
Certifies the Material Was
Adopted by the State on October 17, 1990.
(26) SO2 Plan ...........................
(27) Letter Withdrawing Variance Provisions.
VerDate Sep<11>2014
20:18 Aug 13, 2015
Muscatine .................................
Jkt 235001
PO 00000
Frm 00047
Fmt 4700
Sfmt 4700
E:\FR\FM\14AUR1.SGM
14AUR1
48730
Federal Register / Vol. 80, No. 157 / Friday, August 14, 2015 / Rules and Regulations
EPA-APPROVED IOWA NONREGULATORY PROVISIONS—Continued
Name of nonregulatory
SIP provision
Applicable geographic or
nonattainment area
(39) Regional Haze plan for the
first implementation period.
Statewide ..................................
[FR Doc. 2015–19588 Filed 8–13–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R03–OAR–2015–0454; FRL–9932–35Region 3]
Approval and Promulgation of Air
Quality Implementation Plans; Virginia;
Movement of the Northern Virginia
Area From Virginia’s Nonattainment
Area List to its Maintenance Area List
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is taking direct final
action to approve revisions to the
Virginia State Implementation Plan
(SIP). The revisions move the localities
(Counties of Arlington, Fairfax, Loudon,
and Prince William; Cities of
Alexandria, Fairfax, Falls Church,
Manassas, and Manassas Park) of
Northern Virginia from Virginia’s list of
nonattainment areas to its list of
maintenance areas for fine particulate
matter (PM2.5). EPA is approving these
revisions in accordance with the
requirements of the Clean Air Act
(CAA).
SUMMARY:
This rule is effective on October
13, 2015 without further notice, unless
EPA receives adverse written comment
by September 14, 2015. If EPA receives
such comments, it will publish a timely
withdrawal of the direct final rule in the
Federal Register and inform the public
that the rule will not take effect.
ADDRESSES: Submit your comments,
identified by Docket ID Number EPA–
R03–OAR–2015–0454 by one of the
following methods:
A. www.regulations.gov. Follow the
on-line instructions for submitting
comments.
B. Email: fernandez.cristina@epa.gov.
C. Mail: EPA–R03–OAR–2015–0454,
Cristina Fernandez, Associate Director,
Office of Air Program Planning, Air
Protection Division, Mail code 3AP30,
U.S. Environmental Protection Agency,
tkelley on DSK3SPTVN1PROD with RULES
DATES:
VerDate Sep<11>2014
20:18 Aug 13, 2015
Jkt 235001
State submittal
date
3/25/08
EPA Approval
date
6/26/12, 77 FR 38007
Region III, 1650 Arch Street,
Philadelphia, Pennsylvania 19103.
D. Hand Delivery: At the previouslylisted EPA Region III address. Such
deliveries are only accepted during the
Docket’s normal hours of operation, and
special arrangements should be made
for deliveries of boxed information.
Instructions: Direct your comments to
Docket ID No. EPA–R03–OAR–2015–
0454. EPA’s policy is that all comments
received will be included in the public
docket without change, and may be
made available online at
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI, or otherwise
protected, through www.regulations.gov
or email. The www.regulations.gov Web
site is an ‘‘anonymous access’’ system,
which means EPA will not know your
identity or contact information unless
you provide it in the body of your
comment. If you send an email
comment directly to EPA without going
through www.regulations.gov, your
email address will be automatically
captured and included as part of the
comment that is placed in the public
docket and made available on the
Internet. If you submit an electronic
comment, EPA recommends that you
include your name and other contact
information in the body of your
comment and with any disk or CD–ROM
you submit. If EPA cannot read your
comment due to technical difficulties
and cannot contact you for clarification,
EPA may not be able to consider your
comment. Electronic files should avoid
the use of special characters, any form
of encryption, and be free of any defects
or viruses.
Docket: All documents in the
electronic docket are listed in the
www.regulations.gov index. Although
listed in the index, some information is
not publicly available, i.e., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
PO 00000
Frm 00048
Fmt 4700
Sfmt 4700
Explanation
[EPA–R07–OAR–2012–0153,
FRL–9688–1] § 52.842(a);
Limited Approval.
materials are available either
electronically in www.regulations.gov or
in hard copy during normal business
hours at the Air Protection Division,
U.S. Environmental Protection Agency,
Region III, 1650 Arch Street,
Philadelphia, Pennsylvania 19103.
Copies of the State submittal are
available at the Virginia Department of
Environmental Quality, 629 East Main
Street, Richmond, Virginia 23219.
FOR FURTHER INFORMATION CONTACT:
Maria A. Pino, (215) 814–2181, or by
email at pino.maria@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
Particle pollution, or particulate
matter, is a mixture of solid particles
and liquid droplets found in the air.
Particle pollution includes ‘‘inhalable
coarse particles,’’ with diameters larger
than 2.5 micrometers and smaller than
10 micrometers and ‘‘fine particles,’’
with diameters that are 2.5 micrometers
and smaller. Due to their small size,
these particles often contribute to
adverse health effects. EPA is required
to set National Ambient Air Quality
Standards (NAAQS) under the authority
of the CAA, for the purpose of
controlling particle pollution. The first
NAAQS for PM2.5 were established on
July 16, 1997 (62 FR 38652). EPA
promulgated an annual standard at a
level of 15 micrograms per cubic meter
(mg/m3), based on a three-year average of
annual mean PM2.5 concentrations (the
1997 annual PM2.5 standard). In the
same rulemaking action, EPA
promulgated a 24-hour standard of 65
mg/m3, based on a three-year average of
the 98th percentile of 24-hour
concentrations.
EPA published air quality area
designations for the 1997 PM2.5
standards on January 5, 2005. In its
rulemaking action, EPA designated the
Washington, DC–MD–VA Area as
nonattainment for the 1997 annual
PM2.5 standard. The Washington, DC–
MD–VA area (Washington Area) is
composed of the District of Columbia;
Arlington, Fairfax, Loudoun, and Prince
William Counties and the cities of
Alexandria, Fairfax, Falls Church,
Manassas, and Manassas Park in
Virginia (the Northern Virginia area);
and Charles, Frederick, Montgomery,
E:\FR\FM\14AUR1.SGM
14AUR1
Agencies
[Federal Register Volume 80, Number 157 (Friday, August 14, 2015)]
[Rules and Regulations]
[Pages 48718-48730]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19588]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R07-OAR-2015-0103 FRL-9926-85-Region 7]
Approval and Promulgation of Air Quality Implementation Plans;
Iowa; Update to Materials Incorporated by Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; notice of administrative change.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is updating the
materials submitted by Iowa that are incorporated by reference (IBR)
into the state implementation plan (SIP). EPA is also notifying the
public of the correction of certain typographical errors within the IBR
table. The regulations affected by this update have been previously
submitted by the state agency and approved by EPA. This update affects
the SIP materials that are available for public inspection at the
National Archives and Records Administration (NARA), and the Regional
Office.
DATES: This rule is effective on August 14, 2015.
ADDRESSES: SIP materials which are incorporated by reference into 40
CFR part 52 are available for inspection at the following locations:
Environmental Protection Agency, Region 7, 11201 Renner Boulevard,
Lenexa, Kansas 66219; or at https://www.epa.gov/region07/air/rules/fedapprv.htm; For information on the availability of this material at
NARA, call (202) 741-6030, or go to: www.archives.gov/federal-register/cfr/ibr-locations.html.
FOR FURTHER INFORMATION CONTACT: Jan Simpson at (913) 551-7089, or by
email at simpson.jan@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
The SIP is a living document which the state revises as necessary
to address the unique air pollution problems in the state. Therefore,
EPA from time to time must take action on SIP revisions containing new
and/or revised regulations to make them part of the SIP. On May 22,
1997 (62 FR 27968), EPA revised the procedures for incorporating by
reference Federally-approved SIPs, as a result of consultations between
EPA and the Office of Federal Register. The description of the revised
SIP document, IBR procedures and ``Identification of plan'' format are
discussed in further detail in the May 22, 1997, Federal Register
document.
On February 12, 1999, EPA published a document in the Federal
Register (64 FR 7091) beginning the new IBR procedure for Iowa. On
September 23, 2004 (69 FR 56942), and on July 29, 2009, (74 FR 37556)
EPA published an update to the IBR material for Iowa.
In this document, EPA is publishing an updated set of tables
listing the regulatory (i.e., IBR) materials in the Iowa SIP taking
into account the additions, deletions, and revisions to those materials
previously submitted by the state agency and approved by EPA. We are
removing the EPA Headquarters Library from paragraph (b)(3), as IBR
materials are no longer available at this location. In addition, EPA
has found errors in certain entries listed in 40 CFR 52.820(c), as
amended in the published IBR update actions listed above, and is
correcting them in this document. Table (c) revisions include:
Adding the inadvertent omission of the following
explanation to the explanation column for 567.22.1 (Permits Required
for New or Existing Stationary Sources): In 22.1(3) the following
sentence regarding electronic submission is not SIP approved. The
sentence is ``Alternatively, the owner or operator may apply for a
construction permit for a new or modified stationary source through the
electronic submittal format specified by the department''.
Adding the inadvertent omission of the following
explanation to the explanation column for 567-22.3 (Issuing Permits):
Subrule 22.3(6) has not been approved as part of the SIP. Subrule
22.3(6), Limits on Hazardous Air Pollutants, has been approved under
Title V and section 112(l). The remainder of the rule has not been
approved pursuant to Title V and section 112(l).
567.22.105 (Title V Permit Applications): Correcting the
state effective date, correcting the EPA approval date column to the
correct date and Federal Register citation, and adding the inadvertent
omission of the following explanation to the explanation column: In
22.105(1) Duty to apply the last sentence ``Alternatively, an owner or
operator may submit a complete and timely application through the
electronic submittal format specified by the department.'' is not
approved. In 22.105(1) ``a'' new subparagraph (9) is not approved.
Adding the inadvertent omission of the following
explanation to the explanation column for 567-23.1 (Emission
Standards): Sections 23.1(2)-(5) are not approved in the SIP. Section
23.1(5) is approved as part of the 111(d) plan.
Table (e) revisions include:
Adding text in the explanation column for (4)-(39).
II. EPA Action
In this action, EPA is doing the following:
A. Announcing the update to the IBR material as of December 31,
2014;
B. Revising the entry in paragraph 52.820(b) to reflect the update
and corrections;
C. Revising certain entries in paragraph 52.820 (c) as described
above;
D. Correcting the date format in the ``State effective date'' or
``State submittal date'' and ``EPA approval date'' columns in
paragraphs 52.820 (c), (d) and (e). Dates are numerical month/day/year
without additional zeros;
E. Modifying the Federal Register citation in paragraphs 52.820
(c), (d) and (e) to reflect the beginning page of the preamble as
opposed to the page number of the regulatory text.
EPA has determined that today's rule falls under the ``good cause''
exemption in section 553(b)(3)(B) of the Administrative Procedures Act
(APA) which, upon finding ``good cause,'' authorizes agencies to
dispense with public participation and section 553(d)(3), which allows
an agency to make a rule effective immediately (thereby avoiding the
30-day delayed effective date otherwise provided for in the APA).
Today's rule simply codifies provisions which are already in effect as
a matter of law in Federal and approved State programs. Under section
553 of the APA, an agency may find good cause where procedures are
``impractical, unnecessary, or contrary to the public interest.''
Public comment is ``unnecessary'' and ``contrary to the public
interest'' since the codification only reflects existing law. Immediate
notice in the CFR benefits the public by
[[Page 48719]]
providing notice of the updated Iowa SIP compilation.
Statutory and Executive Order Reviews
In this rule, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of the Iowa
regulations described in the amendments to 40 CFR part 52 set forth
below. EPA has made, and will continue to make, these documents
generally available electronically through www.regulations.gov and/or
in hard copy at the appropriate EPA office (see the ADDRESSES section
of this preamble for more information).
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the Act and applicable
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided that they meet the criteria of the CAA. Accordingly, this
action merely approves state law as meeting Federal requirements and
does not impose additional requirements beyond those imposed by state
law. For that reason, this action:
Is not a ``significant regulatory action'' under the terms
of Executive Order 12866 (58 FR 51735, October 4, 1993) and is
therefore not subject to review under Executive Orders 12866 and 13563
(76 FR 3821, January 21, 2011).
Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
The SIP is not approved to apply on any Indian reservation land or
in any other area where EPA or an Indian tribe has demonstrated that a
tribe has jurisdiction. In those areas of Indian country, the rule does
not have tribal implications and will not impose substantial direct
costs on tribal governments or preempt tribal law as specified by
Executive Order 13175 (65 FR 67249, November 9, 2000).
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
EPA has also determined that the provisions of section 307(b)(1) of
the CAA pertaining to petitions for judicial review are not applicable
to this action. Prior EPA rulemaking actions for each individual
component of the Iowa SIP compilations previously afforded interested
parties the opportunity to file a petition for judicial review in the
United States Court of Appeals for the appropriate circuit within 60
days of such rulemaking action. Thus, EPA sees no need in this action
to reopen the 60-day period for filing such petitions for judicial
review for this ``Identification of plan'' reorganization update action
for the State of Iowa.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: April 7, 2015.
Mark Hague,
Acting Regional Administrator, Region 7.
For the reasons stated in the preamble, the Environmental
Protection Agency amends 40 CFR part 52 as set forth below: Chapter I,
title 40 of the Code of Federal Regulations is amended as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart Q Iowa
0
2. In Sec. 52.820, paragraphs (b), (c), (d) and (e) are revised to
read as follows:
Sec. 52.820 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c) and (d) of this section with an EPA approval date prior to December
31, 2014, was approved for incorporation by reference by the Director
of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR
part 51. Material is incorporated as it exists on the date of the
approval, and notice of any change in the material will be published in
the Federal Register. Entries in paragraphs (c) and (d) of this section
with EPA approval dates after December 31, 2014, will be incorporated
by reference in the next update to the SIP compilation.
(2) EPA Region 7 certifies that the rules/regulations provided by
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this
section are an exact duplicate of the officially promulgated state
rules/regulations which have been approved as part of the SIP as of
December 31, 2014.
(3) Copies of the materials incorporated by reference may be
inspected at the Environmental Protection Agency, Region 7, Air
Planning and Development Branch, 11201 Renner Boulevard, Lenexa, Kansas
66219; and the National Archives and Records Administration (NARA). If
you wish to obtain material from the EPA Regional Office, please call
(913) 551-7089. For information on the availability of this material at
NARA, call (202) 741-6030, or go to: www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA-approved regulations.
[[Page 48720]]
EPA-Approved Iowa Regulations
----------------------------------------------------------------------------------------------------------------
State effective EPA approval
Iowa citation Title date date Explanation
----------------------------------------------------------------------------------------------------------------
Iowa Department of Natural Resources Environmental Protection Commission [567]
Chapter 20--Scope of Title--
Definitions--Forms--Rule of
Practice
----------------------------------------------------------------------------------------------------------------
567-20.1..................... Scope of Title....... 1/15/14 5/15/14, 79 FR This rule is a non-
27763. substantive
description of the
Chapters contained
in the Iowa rules.
EPA has not approved
all of the Chapters
to which this rule
refers.
----------------------------------------------------------------------------------------------------------------
567-20.2..................... Definitions.......... 04/22/15 8/10/15, 80 FR
33192.
567-20.3..................... Air Quality Forms 04/22/15 8/10/15, 80 FR
Generally. 33192.
----------------------------------------------------------------------------------------------------------------
Chapter 21--Compliance
----------------------------------------------------------------------------------------------------------------
567-21.1..................... Compliance Schedule.. 7/12/06 8/6/07, 72 FR
43539.
567-21.2..................... Variances............ 4/4/07 10/16/07, 72 FR
58535.
567-21.3..................... Emission Reduction 3/14/90 6/29/90, 55 FR
Program. 26690.
567-21.4..................... Circumvention of 3/14/90 6/29/90, 55 FR
Rules. 26690.
567-21.5..................... Evidence Used in 11/16/94 10/30/95, 60 FR
Establishing That a 55198.
Violation Has or Is
Occurring.
567-21.6..................... Temporary Electricity 10/15/08 12/29/09, 74 FR
Generation for 68692.
Disaster Situations.
----------------------------------------------------------------------------------------------------------------
Chapter 22--Controlling Pollution
----------------------------------------------------------------------------------------------------------------
567-22.1..................... Permits Required for 4/22/15 8/10/15, 80 FR In 22.1(3) the
New or Existing 33192. following sentence
Stationary Sources. regarding electronic
submission is not
SIP approved. The
sentence is
``Alternatively, the
owner or operator
may apply for a
construction permit
for a new or
modified stationary
source through the
electronic submittal
format specified by
the department''.
567-22.2..................... Processing Permit 4/22/15 8/10/15, 80 FR
Applications. 33192.
567-22.3..................... Issuing Permits...... 10/24/12 1/16/14, 79 FR Subrule 22.3(6) has
2787. not been approved as
part of the SIP.
Subrule 22.3(6),
Limits on Hazardous
Air Pollutants, has
been approved under
Title V and section
112(l). The
remainder of the
rule has not been
approved pursuant to
Title V and section
112(l).
567-22.4..................... Special Requirements 6/11/08 12/29/09, 74 FR
for Major Stationary 68692.
Sources Located in
Areas Designated
Attainment or
Unclassified (PSD).
567-22.5..................... Special Requirements 1/15/14 5/15/14, 79 FR Rescinded and moved
for Nonattainment 27763. to 567-31.20.
Areas.
567-22.8..................... Permits by Rule...... 10/23/13 5/14/14, 79 FR
27490.
567-22.9..................... Special Requirements 11/11/09 10/25/13, 78 FR
for Visibility 63887.
Protection.
567-22.10.................... Permitting 9/10/14 8/10/15, 80 FR
Requirements for 33192.
Country Grain
Elevators, Country
Grain Terminal
Elevators, Grain
Terminal Elevators
and Feed Mill
Equipment.
[[Page 48721]]
567-22.105................... Title V Permit 11/11/09 10/25/13, 78 FR Only subparagraph
Applications. 63887. (2)i(5) is approved
as part of the SIP.
In 22.105(1) Duty to
apply the last
sentence
``Alternatively, an
owner or operator
may submit a
complete and timely
application through
the electronic
submittal format
specified by the
department.'' is not
approved. In
22.105(1) ``a'' new
subparagraph (9) is
not approved.
567-22.200................... Definitions for 10/18/95 4/30/96, 61 FR
Voluntary Operating 18958.
Permits.
567-22.201................... Eligibility for 4/4/07 10/16/07, 72 FR
Voluntary Operating 58535.
Permits.
567-22.202................... Requirement to Have a 4/9/97 6/25/98, 63 FR
Title V Permit. 34600.
567-22.203................... Voluntary Operating 11/11/09 10/25/13, 78 FR
Permit Applications. 63887.
567-22.204................... Voluntary Operating 12/14/94 4/30/96, 61 FR
Permit Fees. 18958.
567-22.205................... Voluntary Operating 12/14/94 4/30/96, 61 FR
Permit Processing 18958.
Procedures.
567-22.206................... Permit Content....... 10/18/95 4/30/96, 61 FR
18958.
567-22.207................... Relation to 10/15/08 12/29/09, 74 FR
Construction Permits. 68692.
567-22.208................... Suspension, 12/14/94 4/30/96, 61 FR
Termination, and 18958.
Revocation of
Voluntary Operating
Permits.
567-22.209................... Change of Ownership 11/11/09 10/25/13, 78 FR
for Facilities with 63887.
Voluntary Operating
Permits.
567-22.300................... Operating permit by 11/11/09 10/25/13, 78 FR
rule for small 63887.
sources.
----------------------------------------------------------------------------------------------------------------
Chapter 23--Emission Standards for Contaminants
----------------------------------------------------------------------------------------------------------------
567-23.1..................... Emission Standards... 11/24/10 10/25/13, 78 FR Sections 23.1(2)-(5)
63887. are not approved in
the SIP. Section
23.1 (5) is approved
as part of the
111(d) plan.
567-23.2..................... Open Burning......... 1/14/04 11/3/04, 69 FR Subrule 23.2(3)g(2)
63945. was not submitted
for approval.
Variances from open
burning rule 23.2(2)
are subject to EPA
approval.
567-23.3..................... Specific Contaminants 6/11/08 12/29/09, 74 FR Subrule 23.3(3)
68692. ``(d)'' is not SIP
approved.
567-23.4..................... Specific Processes... 6/11/08 12/29/09, 74 FR Subrule 23.4(10) is
68692. not SIP approved.
----------------------------------------------------------------------------------------------------------------
Chapter 24--Excess Emissions
----------------------------------------------------------------------------------------------------------------
567-24.1..................... Excess Emission 11/24/10 10/25/13, 78 FR
Reporting. 63887.
567-24.2..................... Maintenance and 3/14/90 6/29/90, 55 FR
Repair Requirements. 26690.
----------------------------------------------------------------------------------------------------------------
Chapter 25--Measurement of Emissions
----------------------------------------------------------------------------------------------------------------
567-25.1..................... Testing and Sampling 10/24/12 1/16/14, 79 FR
of New and Existing 2787.
Equipment.
----------------------------------------------------------------------------------------------------------------
Chapter 26--Prevention of Air Pollution Emergency Episodes
----------------------------------------------------------------------------------------------------------------
567-26.1..................... General.............. 3/14/90 6/29/90, 55 FR
26690.
567-26.2..................... Episode Criteria..... 3/14/90 6/29/90, 55 FR
26690.
567-26.3..................... Preplanned Abatement 3/14/90 6/29/90, 55 FR
Strategies. 26690.
[[Page 48722]]
567-26.4..................... Actions During 3/14/90 6/29/90, 55 FR
Episodes. 26690.
----------------------------------------------------------------------------------------------------------------
Chapter 27--Certificate of Acceptance
----------------------------------------------------------------------------------------------------------------
567-27.1..................... General.............. 3/14/90 6/29/90, 55 FR
26690.
567-27.2..................... Certificate of 3/14/90 6/29/90, 55 FR
Acceptance. 26690.
567-27.3..................... Ordinance or 3/14/90 6/29/90, 55 FR
Regulations. 26690.
567-27.4..................... Administrative 3/14/90 6/29/90, 55 FR
Organization. 26690.
567-27.5..................... Program Activities... 3/14/90 6/29/90, 55 FR
26690.
----------------------------------------------------------------------------------------------------------------
Chapter 28--Ambient Air Quality Standards
----------------------------------------------------------------------------------------------------------------
567-28.1..................... Statewide Standards.. 10/23/13 5/14/14, 79 FR
27490.
----------------------------------------------------------------------------------------------------------------
Chapter 29--Qualification in Visual Determination of the Opacity of Emissions
----------------------------------------------------------------------------------------------------------------
567-29.1..................... Methodology and 5/13/98 5/22/00, 65 FR
Qualified Observer. 32030.
----------------------------------------------------------------------------------------------------------------
Chapter 31--Nonattainment Areas
----------------------------------------------------------------------------------------------------------------
567-31.1..................... Permit Requirements 1/15/14 5/15/14, 79 FR
Relating to 27763.
Nonattainment Areas.
567-31.2..................... Conformity of General 1/15/14 5/15/14, 79 FR
Federal Actions to 27763.
the Iowa SIP or
Federal
Implementation Plan.
567-31.3..................... Nonattainment new 1/15/14 5/15/14, 79 FR
source review 27763.
requirements for
areas designated
nonattainment on or
after May 18, 1998.
567-31.4..................... Preconstruction 1/15/14 5/15/14, 79 FR
review permit 27763.
program.
567-31.9..................... Actual PALs.......... 1/15/14 5/15/14, 79 FR
27763.
567-31.10.................... Validity of Rules.... 1/15/14 5/15/14, 79 FR
27763.
567-31.20.................... Special requirements 4/22/15 8/10/15, 80 FR
for nonattainment 33192.
areas designated
before May 18, 1998
(originally adopted
in 567-22.5(455B)).
----------------------------------------------------------------------------------------------------------------
Chapter 33--Special Regulations and Construction Permit Requirements for Major Stationary Sources--Prevention of
Significant Deterioration (PSD) of Air Quality
----------------------------------------------------------------------------------------------------------------
567-33.1..................... Purpose.............. 1/15/14 5/15/14, 79 FR
27763.
567-33.3..................... Special construction 4/22/14 8/10/15, 80 FR
permit requirements 33192.
for major stationary
sources in areas
designated
attainment or
unclassified (PSD).
567-33.9..................... Plantwide 11/1/06 5/14/07, 72 FR
applicability 27056.
limitations (PALs).
567-33.10.................... Exceptions to 11/1/06 5/14/07, 72 FR
adoption by 27056.
reference.
----------------------------------------------------------------------------------------------------------------
Chapter 34--Provisions for Air Quality Emissions Trading Programs
----------------------------------------------------------------------------------------------------------------
567-34.1..................... Purpose.............. 7/12/06 8/6/07, 72 FR
43539.
567-34.201................... CAIR NOX annual 11/28/07 4/15/08, 73 FR
trading program 20177.
provisions.
567-34.202................... CAIR designated 7/12/06 8/6/07, 72 FR
representative for 43539.
CAIR NOX sources.
567-34.203................... Permits.............. 7/12/06 8/6/07, 72 FR
43539.
[[Page 48723]]
567-34.205................... CAIR NOX allowance 7/12/06 8/6/07, 72 FR
allocations. 43539.
567-34.206................... CAIR NOX allowance 7/12/06 8/6/07, 72 FR
tracking system. 43539.
567-34.207................... CAIR NOX allowance 7/12/06 8/6/07, 72 FR
transfers. 43539.
567-34.208................... Monitoring and 7/12/06 8/6/07, 72 FR
reporting. 43539.
567-34.209................... CAIR NOX opt-in units 7/12/06 8/6/07, 72 FR
43539.
567-34.210................... CAIR SO2 trading 11/28/07 4/15/08, 73 FR
program. 20177.
567-34.220................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
trading program. 43539.
567-34.221................... CAIR NOX ozone season 11/28/07 4/15/08, 73 FR
trading program 20177.
general.
567-34.222................... CAIR designated 7/12/06 8/6/07, 72 FR
representative for 43539.
CAIR NOX ozone
season sources.
567-34.223................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
permits. 43539.
567-34.225................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
allowance 43539.
allocations.
567-34.226................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
allowance tracking 43539.
system.
567-34.227................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
allowance transfers. 43539.
567-34.228................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
monitoring and 43539.
reporting.
567-34.229................... CAIR NOX ozone season 7/12/06 8/6/07, 72 FR
opt-in units. 43539.
----------------------------------------------------------------------------------------------------------------
[[Page 48724]]
Linn County
----------------------------------------------------------------------------------------------------------------
Chapter 10................... Linn County Air 1/30/15 9/28/15, 80 FR The following
Quality Ordinance, 44870. definitions are not
Chapter 10. SIP-approved in
Chapter 10.2;
Anaerobic lagoon,
Biomass, Chemical
processing plants
(ethanol production
facilities that
produce ethanol by
natural fermentation
included in NAICS
code 325193 or
312140 are not
included in this
definition);
Federally
Enforceable;
Greenhouse gases;
Maximum Achievable
Control Technology
(MACT); MACT floor.
The following
sections are not SIP
approved: 10.4(1),
Title V Permits;
10.5(9)``b'' Locally
Required Permits;
Exemptions from the
Authorization to
Install Permit to
Operate
Requirements;
10.5(9) ``ll'',
Exemption for
production painting,
adhesive or coating
units; 10.8(2)``b''
Emissions From Fuel-
Burning Equipment;
Emission Limitation;
10.8(3) Emissions
From Fuel-Burning
Equipment;
Exemptions for
Residential Heaters
Burning Solid Fuels;
10.8(4) Emissions
from Fuel-Burning
Equipment; Nuisance
Conditions for Fuel
Burning Equipment;
10.9(2), NSPS;
10.9(3), Emission
Standards for HAPs;
10.9(4), Emission
Standards for HAPs
for Source
Categories; 10.10(4)
Variance from rules;
10.11, Emission of
Objectionable Odors;
10.15, Variances,
10.17(13) Continuous
Emissions Monitoring
from Acid Rain
Program 10.17(13)
Continuous Emissions
Monitoring from Acid
Rain Program, and
10.24, Penalty.
----------------------------------------------------------------------------------------------------------------
Polk County
----------------------------------------------------------------------------------------------------------------
Chapter V.................... Polk County Board of 08/06/09 7/06/10, 75 FR Article I, Section 5-
Health Rules and 38745. 2, definition of
Regulations Air ``variance'';
Pollution Chapter V. Article VI, Sections
5-16(n), (o) and
(p); Article VIII;
Article IX, Sections
5-27(3) and (4);
Article X, Section 5-
28 subsections (a)
through (c); Article
XIII, and Article
XVI, Section 5-75
are not a part of
the SIP.
----------------------------------------------------------------------------------------------------------------
(d) EPA-approved State source-specific permits.
EPA-Approved Iowa Source-Specific Orders/Permits
--------------------------------------------------------------------------------------------------------------------------------------------------------
State effective
Name of source Order/Permit No. date EPA Approval date Explanation
--------------------------------------------------------------------------------------------------------------------------------------------------------
(1) Archer-Daniels Midland Company.... 90-AQ-10................. 3/25/91 11/1/91, 56 FR 56158.................... ........................
(2) Interstate Power Company.......... 89-AQ-04................. 2/21/90 11/1/91, 56 FR 56158.................... ........................
(3) Grain Processing Corporation...... 74-A-015-S............... 9/18/95 12/1/97, 62 FR 63454.................... ........................
(4) Grain Processing Corporation...... 79-A-194-S............... 9/18/95 12/1/97, 62 FR 63454.................... ........................
[[Page 48725]]
(5) Grain Processing Corporation...... 79-A-195-S............... 9/18/95 12/1/97, 62 FR 63454.................... ........................
(6) Grain Processing Corporation...... 95-A-374................. 9/18/95 12/1/97, 62 FR 63454.................... ........................
(7) Muscatine Power and Water......... 74-A-175-S............... 9/14/95 12/1/97, 62 FR 63454.................... ........................
(8) Muscatine Power and Water......... 95-A-373................. 9/14/95 12/1/97, 62 FR 63454.................... ........................
(9) Monsanto Corporation.............. 76-A-161S3............... 7/18/96 12/1/97, 62 FR 63454.................... ........................
(10) Monsanto Corporation............. 76-A-265S3............... 7/18/96 12/1/97, 62 FR 63454.................... ........................
(11) IES Utilities, Inc............... 97-AQ-20................. 11/20/98 3/11/99, 64 FR 12087.................... SO2 Control Plan for
Cedar Rapids.
(12) Archer-Daniels-Midland SO2 Emission Control Plan 9/14/98 3/11/99, 64 FR 12087.................... ADM Corn Processing SO2
Corporation. Control Plan for Cedar
Rapids.
(13) Linwood Mining and Minerals 98-AQ-07................. 3/13/98 3/18/99, 64 FR 13343.................... PM10 control plan for
Corporation. Buffalo.
(14) Lafarge Corporation.............. 98-AQ-08................. 3/13/98 3/18/99, 64 FR 13343.................... PM10 control plan for
Buffalo.
(15) Holnam, Inc...................... A.C.O. 1999-AQ-31........ 9/2/99 11/6/02, 67 FR 67563.................... For a list of the 47
permits issued for
individual emission
points see IDNR letters
to Holnam, Inc., dated
7/24/01.
(16) Holnam, Inc...................... Consent Amendment to 5/16/01 11/6/02, 67 FR 67563.................... For a list of the 47
A.C.O. 1999-AQ-31. permits issued for
individual emission
points see IDNR letters
to Holnam, Inc., dated
7/24/01.
(17) Holnam, Inc...................... Permits for 17-01-009, 7/24/01 11/6/02, 67 FR 67563.................... For a list of the 47
Project Nos. 99-511 and permits issued for
00-468.. individual emission
points see IDNR letters
to Holnam, Inc., dated
7/24/01.
(18) Lehigh Portland Cement Company... A.C.O. 1999-AQ-32........ 9/2/99 11/6/02, 67 FR 67563.................... For a list of the 41
permits issued for
individual emission
points see IDNR letters
to Lehigh dated 7/24/01
and 2/18/02.
(19) Lehigh Portland Cement Company... Permits for plant No. 17- 2/18/02 11/6/02, 67 FR 67563.................... For a list of the 41
01-005, Project Nos. 99- permits issued for
631 and 02-037. individual emission
points see IDNR letters
to Lehigh dated 7/24/01
and 2/18/02.
(20) Blackhawk Foundry and Machine A.C.O. 03-AQ-51.......... 12/4/03 6/10/04, 69 FR 32454.................... Together with the
Company. permits listed below
this order comprises
the PM10 control
strategy for Davenport,
Iowa.
(21) Blackhawk Foundry and Machine Permit No. 02-A-116 (Cold 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. Box Core Machine). that relate to
pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
(22) Blackhawk Foundry and Machine Permit No. 02-A- 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. 290(Wheelabrator #2 and that relate to
Casting Sorting). pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
(23) Blackhawk Foundry and Machine Permit No. 02-A-291 (Mold 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. Sand Silo). that relate to
pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
(24) Blackhawk Foundry and Machine Permit No. 02-A-292 (Bond 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. Storage). that relate to
pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
(25) Blackhawk Foundry and Machine Permit No. 02-A-293 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. (Induction Furnace and that relate to
Aluminum Sweat Furnace). pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
[[Page 48726]]
(26) Blackhawk Foundry and Machine Permit No. 77-A-114-S1 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. (Wheelabrator #1 & that relate to
Grinding). pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
(27) Blackhawk Foundry and Machine Permit No. 84-A-055-S1 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. (Cupola ladle, Pour deck that relate to
ladle, Sand shakeout, pollutants other than
Muller, Return sand #1, PM10 are not approved
Sand cooler, Sand by EPA as part of this
screen, and Return sand SIP.
#2).
(28) Blackhawk Foundry and Machine Permit No. 72-A-060-S5 8/19/02 6/10/04, 69 FR 32454.................... Provisions of the permit
Company. (Cupola). that relate to
pollutants other than
PM10 are not approved
by EPA as part of this
SIP.
(29) Grain Processing Corporation..... Administrative Consent 2/14/14 12/1/14, 79 FR 71025.................... The last sentence of
Order NO.2014-AQ-A1. Paragraph 5, Section
III and Section VI are
not approved by EPA as
part of the SIP.
(30) Muscatine Power and Water........ Permit No. 74-A-175-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(31) Muscatine Power and Water........ Permit No. 80-A-006-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(32) Muscatine Power and Water........ Permit No. 80-A-007-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(33) Muscatine Power and Water........ Permit No. 80-A-191-P2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(34) Muscatine Power and Water........ Permit No. 80-A-193-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(35) Muscatine Power and Water........ Permit No. 80-A-194-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(36) Muscatine Power and Water........ Permit No. 80-A-197-S2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(37) Muscatine Power and Water........ Permit No. 80-A-200-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(38) Muscatine Power and Water........ Permit No. 80-A-201-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(39) Muscatine Power and Water........ Permit No. 80-A-202-S2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(40) Muscatine Power and Water........ Permit No. 93-A-283-S2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(41) Muscatine Power and Water........ Permit No. 93-A-288-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(42) Muscatine Power and Water........ Permit No. 93-A-289-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(43) Muscatine Power and Water........ Permit No. 93-A-290-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(44) Muscatine Power and Water........ Permit No. 93-A-373-P2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(45) Muscatine Power and Water........ Permit No. 00-A-638-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(46) Muscatine Power and Water........ Permit No. 00-A-639-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(47) Muscatine Power and Water........ Permit No. 00-A-689-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(48) Muscatine Power and Water........ Permit No. 00-A-684-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(49) Muscatine Power and Water........ Permit No. 00-A-686-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(50) Muscatine Power and Water........ Permit No. 00-A-687-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(51) Muscatine Power and Water........ Permit No. 01-A-193-S2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(52) Muscatine Power and Water........ Permit No. 01-A-218-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(53) Muscatine Power and Water........ Permit No. 01-A-456-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(54) Muscatine Power and Water........ Permit No. 01-A-617-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(55) Muscatine Power and Water........ Permit No. 04-A-618-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
[[Page 48727]]
(56) Muscatine Power and Water........ Permit No. 04-A-619-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(57) Muscatine Power and Water........ Permit No. 11-A-562-S1... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(58) Muscatine Power and Water........ Permit No. 13-A-139...... 7/23/13 12/1/14, 79 FR 71025.................... ........................
(59) Muscatine Power and Water........ Permit No. 13-A-140...... 7/23/13 12/1/14, 79 FR 71025.................... ........................
(60) Muscatine Power and Water........ Permit No. 13-A-141...... 7/23/13 12/1/14, 79 FR 71025.................... ........................
(61) Muscatine Power and Water........ Permit No. 13-A-142...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(62) Muscatine Power and Water........ Permit No. 13-A-143...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(63) Muscatine Power and Water........ Permit No. 13-A-146...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(64) Muscatine Power and Water........ Permit No. 13-A-147...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(65) Muscatine Power and Water........ Permit No. 13-A-148...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(66) Muscatine Power and Water........ Permit No. 13-A-150...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(67) Muscatine Power and Water........ Permit No. 13-A-151...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(68) Muscatine Power and Water........ Permit No. 13-A-152...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(69) Muscatine Power and Water........ Permit No. 13-A-153...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(70) Muscatine Power and Water........ Permit No. 13-A-154...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(71) Muscatine Power and Water........ Permit No. 13-A-155...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(72) Muscatine Power and Water........ Permit No. 13-A-157...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(73) Muscatine Power and Water........ Permit No. 13-A-158...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(74) Muscatine Power and Water........ Permit No. 13-A-159...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(75) Muscatine Power and Water........ Permit No. 13-A-161...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(76) Muscatine Power and Water........ Permit No. 80-A-196-S3... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(77) Muscatine Power and Water........ Permit No. 93-A-286-S4... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(78) Muscatine Power and Water........ Permit No. 01-A-457-S4... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(79) Muscatine Power and Water........ Permit No. 06-A-650-S2... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(80) Muscatine Power and Water........ Permit No. 13-A-160...... 7/22/13 12/1/14, 79 FR 71025.................... ........................
(81) Union Tank Car Company........... Permit No. 93-A-251-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(82) Union Tank Car Company........... Permit No. 93-A-252-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(83) Union Tank Car Company........... Permit No. 93-A-253-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(84) Union Tank Car Company........... Permit No. 93-A-254-S3... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(85) Union Tank Car Company........... Permit No. 00-A-1086-S2.. 4/08/13 12/1/14, 79 FR 71025.................... ........................
(86) Union Tank Car Company........... Permit No. 00-A-1087-S2.. 4/08/13 12/1/14, 79 FR 71025.................... ........................
(87) Union Tank Car Company........... Permit No. 00-A-1088-S2.. 4/08/13 12/1/14, 79 FR 71025.................... ........................
(88) Union Tank Car Company........... Permit No. 93-A-255-S7... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(89) Union Tank Car Company........... Permit No. 96-A-629-S3... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(90) Union Tank Car Company........... Permit No. 96-A-630-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(91) Union Tank Car Company........... Permit No. 96-A-631-S3... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(92) Union Tank Car Company........... Permit No. 96-A-636-S3... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(93) Union Tank Car Company........... Permit No. 00-A-529-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(94) Union Tank Car Company........... Permit No. 00-A-530-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(95) Union Tank Car Company........... Permit No. 00-A-531-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(96) Union Tank Car Company........... Permit No. 00-A-532-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(97) Union Tank Car Company........... Permit No. 00-A-533-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(98) Union Tank Car Company........... Permit No. 93-A-256-S6... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(99) Union Tank Car Company........... Permit No. 96-A-632-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(100) Union Tank Car Company.......... Permit No. 96-A-633-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
[[Page 48728]]
(101) Union Tank Car Company.......... Permit No. 96-A-634-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(102) Union Tank Car Company.......... Permit No. 96-A-635-S5... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(103) Union Tank Car Company.......... Permit No. 00-A-1089-S2.. 4/08/13 12/1/14, 79 FR 71025.................... ........................
(104) Union Tank Car Company.......... Permit No. 00-A-1090-S2.. 4/08/13 12/1/14, 79 FR 71025.................... ........................
(105) Union Tank Car Company.......... Permit No. 00-A-1091-S2.. 4/08/13 12/1/14, 79 FR 71025.................... ........................
(106) Union Tank Car Company.......... Permit No. 10-A-043-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(107) Union Tank Car Company.......... Permit No. 09-A-009-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(108) Union Tank Car Company.......... Permit No. 09-A-010-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
(109) Union Tank Car Company.......... Permit No. 94-A-434-S2... 4/08/13 12/1/14, 79 FR 71025.................... ........................
--------------------------------------------------------------------------------------------------------------------------------------------------------
(e) The EPA approved nonregulatory provisions and quasi-regulatory
measures.
EPA-Approved Iowa Nonregulatory Provisions
----------------------------------------------------------------------------------------------------------------
Applicable
Name of nonregulatory SIP geographic or State submittal
provision nonattainment date EPA Approval date Explanation
area
----------------------------------------------------------------------------------------------------------------
(1) Air Pollution Control Statewide....... 1/27/72 5/31/72, 37 FR 10842....... ...............
Implementation Plan.
(2) Request for a Two Year Council Bluffs.. 1/27/72 5/31/72, 37 FR 10842....... Correction
Extension to Meet the NAAQS. notice
published
3/2/76.
(3) Revisions to Appendices D Statewide....... 2/2/72 5/31/72, 37 FR 10842....... Correction
and G. notice
published
3/2/76.
(4) Source Surveillance and Statewide....... 4/14/72 3/2/76, 41 FR 8956......... [FRL 484-4].
Record Maintenance
Statements.
(5) Statement Regarding Statewide....... 5/2/72 3/2/76, 41 FR 8956......... [FRL 484-4].
Public Availability of
Emissions Data.
(7) Letter Describing the Linn County, 12/14/72 10/1/76, 41 FR 43406....... [FRL 616-1].
Certificates of Acceptance Polk County.
for Local Air Pollution
Control Programs.
(8) High Air Pollution Statewide....... 6/20/73 10/1/76, 41 FR 43406....... [FRL 616-1].
Episode Contingency Plan.
(9) Summary of Public Hearing Statewide....... 9/3/75 10/1/76, 41 FR 43406....... [FRL 616-1].
on Revised Rules Which Were
Submitted on July 17, 1975.
(10) Air Quality Modeling to Statewide....... 3/4/77 6/1/77, 42 FR 27892........ [FRL 739-1].
Support Sulfur Dioxide
Emission Standards.
(11) Nonattainment Plans..... Mason City, 6/22/79 3/6/80, 45 FR 14561........ [FRL 1427-5].
Davenport,
Cedar Rapids,
Des Moines.
(12) Information on VOC Linn County..... 10/8/79 3/6/80, 45 FR 14561........ [FRL 1427-5].
Sources to Support the
Nonattainment Plan.
(13) Information and Linn County..... 11/16/79 3/6/80, 45 FR 14561........ [FRL 1427-5].
Commitments Pertaining to
Legally Enforceable RACT
Rules to Support the
Nonattainment Plan.
(14) Lead Plan............... Statewide....... 8/19/80 3/20/81, 46 FR 17778....... [A-7-FRL-1776-5
].
(15) Letter to Support the Statewide....... 1/19/81 3/20/81, 46 FR 17778....... [A-7-FRL-1776-5
Lead Plan. ].
[[Page 48729]]
(16) Nonattainment Plans to Mason City, 4/18/80 4/17/81, 46 FR 22368....... [A-7-FRL 1792-
Attain Secondary Standards. Cedar Rapids, 2].
Des Moines,
Davenport,
Keokuk, Council
Bluffs, Fort
Dodge, Sioux
City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
(17) Information to Support Mason City, 9/16/80 4/17/81, 46 FR 22368....... [A-7-FRL 1792-
the Particulate Matter Cedar Rapids, 2].
Nonattainment Plan. Des Moines,
Davenport,
Keokuk, Council
Bluffs, Fort
Dodge, Sioux
City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
(18) Information to Support Mason City, 11/17/80 4/17/81, 46 FR 22368....... [A-7-FRL 1792-
the Particulate Matter Cedar Rapids, 2].
Nonattainment Plan. Des Moines,
Davenport,
Keokuk, Council
Bluffs, Fort
Dodge, Sioux
City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
(19) Schedule for Studying Mason City, 6/26/81 3/5/82, 47 FR 9462......... [A-7-FRL-2057-7
Nontraditional Sources of Cedar Rapids, ].
Particulate Matter and for Des Moines,
Implementing the Results. Davenport,
Keokuk, Council
Bluffs, Fort
Dodge, Sioux
City, Clinton,
Marshalltown,
Muscatine,
Waterloo.
(20) Air Monitoring Strategy. Statewide....... 7/15/81 4/12/82, 47 FR 15583....... [A-5-FRL-2076-5
].
(21) Letter of Commitment to Statewide....... 5/14/85 9/12/85, 50 FR 37176....... [EPA Action IA
Revise Unapprovable Portions 1582; A-7-FRL-
of Chapter 22. 2895-9].
(22) Letter of Commitment to Statewide....... 4/22/86 7/11/86, 51 FR 25199....... [EPA Action IA
Submit Stack Height 2060; A-7-FRL-
Regulations and to Implement 3046-8].
the EPA's Regulations until
the State's Rules Are
Approved.
(23) Letter of Commitment to Statewide....... 4/22/87 6/26/87, 52 FR 23981....... [A-7-FRL-3216-5
Implement the Stack Height ].
Regulations in a Manner
Consistent with the EPA's
Stack Height Regulations
with Respect to NSR/PSD
Regulations.
(24) PM10 SIP................ Statewide....... 10/28/88 8/15/89, 54 FR 33536....... [FRL-3627-7].
(25) Letter Pertaining to NOX Statewide....... 11/8/90 2/13/91, 56 FR 5757........ [FRL-3903-5].
Rules and Analysis Which
Certifies the Material Was
Adopted by the State on
October 17, 1990.
(26) SO2 Plan................ Clinton......... 3/13/91 11/1/91, 56 FR 56158....... [IA-21-5182;
FRL-4014-4].
(27) Letter Withdrawing Polk County..... 10/23/91 11/29/91, 56 FR 60924...... [FRL-IA-4-1-530
Variance Provisions. 8; FRL-4034-5]
Correction
notice
published 1/26/
93.
(28) Letter Concerning Open Statewide....... 10/3/91 1/22/92, 57 FR 2472........ [IA5-1-5380;
Burning Exemptions. FRL-4039-5].
(29) Compliance Sampling Statewide....... 1/5/93 5/12/93, 58 FR 27939....... [IA-8-1-5750;
Manual. FRL-4618-6].
(30) Small Business Statewide....... 12/22/92 9/27/93, 58 FR 50266....... [IA-9-1-5859;
Assistance Plan. FRL-4734-5].
(31) Voluntary Operating Statewide....... 12/8/94, 2/16/96, 4/30/96, 61 FR 18958....... [IA 003-1003,
Permit Program. 2/27/96 FRL-5455-4].
(32) SO2 Plan................ Muscatine....... 6/19/96 12/1/97, 62 FR 63454....... [IA 036-1036,
5/21/97 FRL-5929-3].
(33) SO2 Maintenance Plan.... Muscatine....... 4/25/97 3/19/98, 63 FR 13343....... [IA 040-
1040(a), FRL-
5980-2].
(34) SO2 Control Plan........ Cedar Rapids.... 9/11/98 3/11/99, 64 FR 12087....... [IA 058-1058a;
FRL-6308-5].
(35) PM10 Control Plan....... Buffalo, Iowa... 10/1/98 3/18/99, 64 FR 13346....... [IA 059-1059a;
FRL-6310-7].
(36) CAA 110(a)(2)(D)(i) SIP-- Statewide....... 11/22/06 3/8/07, 72 FR 10380........ [EPA-R07-OAR-20
Interstate Transport. 06-1015; FRL-
8285-1].
(37) SO2 Maintenance Plan for Muscatine....... 4/5/07 8/1/07; 72 FR 41900........ [EPA-R07-OAR-20
the Second 10-year Period. 07-0477, FRL-
8448-5].
(38) CAA 110(a)(1) and (2)- Statewide....... 6/15/07 3/04/08; 73 FR 11554....... [EPA-R07-OAR-20
Ozone Infrastructure SIP. 07-1180, FRL-
8535-9].
[[Page 48730]]
(39) Regional Haze plan for Statewide....... 3/25/08 6/26/12, 77 FR 38007....... [EPA-R07-OAR-20
the first implementation 12-0153, FRL-
period. 9688-1] Sec.
52.842(a);
Limited
Approval.
----------------------------------------------------------------------------------------------------------------
[FR Doc. 2015-19588 Filed 8-13-15; 8:45 am]
BILLING CODE 6560-50-P