Federal Register / Vol. 80, No. 156 / Thursday, August 13, 2015 / Notices
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by May 31, 2018.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: August 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–19889 Filed 8–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–536–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
Take notice that on July 27, 2015,
Transcontinental Gas Pipe Line
Company, LLC (Transco), PO Box 1396,
Houston, Texas 77251, filed in Docket
No. CP15–536–000 an application
pursuant to section 7(b) of the Natural
Gas Act (NGA) and part 157 of the
Commission’s regulations, requesting
authorization to abandon by sale
approximately 26.55 miles of 20-inchdiameter gathering pipeline and
appurtenances to Tana Exploration
Company LLC (Tana). Transco states
that the facilities extend from the point
of interconnection in Matagorda Island
Block 669 between Tana’s 10-inchdiameter gathering pipeline and
Transco’s pipeline to Fieldwood Energy
LLC’s Platform A in Brazos Block A–
133, located in federal waters offshore
Texas, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Scott
C. Turkington, Director Rates &
Regulatory, Transcontinental Gas Pipe
Line Company, LLC, P.O. Box 1396,
Houston, Texas 77251–1396, by
telephone at (713) 215–3391, or by
email at sott.c.turkington@williams.com.
VerDate Sep<11>2014
16:56 Aug 12, 2015
Jkt 235001
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
five copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
48519
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and five copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5 p.m. Eastern Time
on August 27, 2015.
Dated: August 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–19892 Filed 8–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Seville Solar One LLC .................
Tallbear Seville LLC ....................
Garrison Energy Center LLC ........
RE Mustang LLC ...........................
RE Mustang 3 LLC .......................
RE Mustang 4 LLC .......................
Logan’s Gap Wind LLC ................
Fowler Ridge IV Wind Farm LLC
Cameron Wind I, LLC ..................
67RK 8me LLC .............................
65HK 8me LLC .............................
Balko Wind Transmission, LLC ..
Goodwell Wind Project, LLC .......
Breckinridge Wind Project, LLC
Alpaca Energy LLC ......................
Beaver Dam Energy LLC ..............
Milan Energy LLC ........................
Oxbow Creek Energy LLC ............
Greenleaf Power Management
LLC ............................................
Adelanto Solar, LLC .....................
Adelanto Solar II, LLC .................
E:\FR\FM\13AUN1.SGM
13AUN1
EG15–71–000
EG15–72–000
EG15–73–000
EG15–74–000
EG15–75–000
EG15–76–000
EG15–77–000
EG15–78–000
EG15–79–000
EG15–80–000
EG15–81–000
EG15–82–000
EG15–83–000
EG15–84–000
EG15–85–000
EG15–86–000
EG15–87–000
EG15–88–000
EG15–89–000
EG15–90–000
EG15–91–000
48520
Federal Register / Vol. 80, No. 156 / Thursday, August 13, 2015 / Notices
Take notice that during the month of
June and July 2015, the status of the
above-captioned entities as Exempt
Wholesale Generators became effective
by operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: August 7, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–19894 Filed 8–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–537–000]
tkelley on DSK3SPTVN1PROD with NOTICES
DBM Pipeline, LLC; Notice of Request
Under Blanket Authorization
Take notice that on July 27, 2015,
DBM Pipeline, LLC (DBM Pipeline),
1201 Lake Robbins Drive, The
Woodlands, Texas 77380, filed in
Docket No. CP15–537–000, a prior
notice request pursuant to sections
157.205, 157.208, and 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA). DBM Pipeline
seeks authorization to construct and
operate approximately 9 miles of 20inch-diameter pipeline in Reeves and
Culberson Counties, Texas, and Eddy
County, New Mexico. DBM Pipeline
proposes to perform these activities
under its blanket certificate issued in
Docket No. CP15–104–000 [152 FERC
¶ 62,056 (2015)], all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
The filing may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Philip
H. Peacock, Vice President, General
Counsel, and Corporate Secretary, DBM
Pipeline, LLC, 1201 Lake Robbins Drive,
The Woodlands, Texas, 77380, or by
calling (832) 636–6000 (telephone)
philip.peacock@anadarko.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
VerDate Sep<11>2014
16:56 Aug 12, 2015
Jkt 235001
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: August 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–19886 Filed 8–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2380–000]
Willey Battery Utility, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Willey
Battery Utility, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 26,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 80, Number 156 (Thursday, August 13, 2015)]
[Notices]
[Pages 48519-48520]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19894]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
Seville Solar One LLC.................................. EG15-71-000
Tallbear Seville LLC................................... EG15-72-000
Garrison Energy Center LLC............................. EG15-73-000
RE Mustang LLC......................................... EG15-74-000
RE Mustang 3 LLC....................................... EG15-75-000
RE Mustang 4 LLC....................................... EG15-76-000
Logan's Gap Wind LLC................................... EG15-77-000
Fowler Ridge IV Wind Farm LLC.......................... EG15-78-000
Cameron Wind I, LLC.................................... EG15-79-000
67RK 8me LLC........................................... EG15-80-000
65HK 8me LLC........................................... EG15-81-000
Balko Wind Transmission, LLC........................... EG15-82-000
Goodwell Wind Project, LLC............................. EG15-83-000
Breckinridge Wind Project, LLC......................... EG15-84-000
Alpaca Energy LLC...................................... EG15-85-000
Beaver Dam Energy LLC.................................. EG15-86-000
Milan Energy LLC....................................... EG15-87-000
Oxbow Creek Energy LLC................................. EG15-88-000
Greenleaf Power Management LLC......................... EG15-89-000
Adelanto Solar, LLC.................................... EG15-90-000
Adelanto Solar II, LLC................................. EG15-91-000
[[Page 48520]]
Take notice that during the month of June and July 2015, the status
of the above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: August 7, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19894 Filed 8-12-15; 8:45 am]