Transcontinental Gas Pipe Line Company, LLC; Notice of Application, 48519 [2015-19892]

Download as PDF Federal Register / Vol. 80, No. 156 / Thursday, August 13, 2015 / Notices least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by May 31, 2018. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: August 6, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–19889 Filed 8–12–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–536–000] tkelley on DSK3SPTVN1PROD with NOTICES Transcontinental Gas Pipe Line Company, LLC; Notice of Application Take notice that on July 27, 2015, Transcontinental Gas Pipe Line Company, LLC (Transco), PO Box 1396, Houston, Texas 77251, filed in Docket No. CP15–536–000 an application pursuant to section 7(b) of the Natural Gas Act (NGA) and part 157 of the Commission’s regulations, requesting authorization to abandon by sale approximately 26.55 miles of 20-inchdiameter gathering pipeline and appurtenances to Tana Exploration Company LLC (Tana). Transco states that the facilities extend from the point of interconnection in Matagorda Island Block 669 between Tana’s 10-inchdiameter gathering pipeline and Transco’s pipeline to Fieldwood Energy LLC’s Platform A in Brazos Block A– 133, located in federal waters offshore Texas, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Scott C. Turkington, Director Rates & Regulatory, Transcontinental Gas Pipe Line Company, LLC, P.O. Box 1396, Houston, Texas 77251–1396, by telephone at (713) 215–3391, or by email at sott.c.turkington@williams.com. VerDate Sep<11>2014 16:56 Aug 12, 2015 Jkt 235001 Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit five copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 48519 Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and five copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5 p.m. Eastern Time on August 27, 2015. Dated: August 6, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–19892 Filed 8–12–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Seville Solar One LLC ................. Tallbear Seville LLC .................... Garrison Energy Center LLC ........ RE Mustang LLC ........................... RE Mustang 3 LLC ....................... RE Mustang 4 LLC ....................... Logan’s Gap Wind LLC ................ Fowler Ridge IV Wind Farm LLC Cameron Wind I, LLC .................. 67RK 8me LLC ............................. 65HK 8me LLC ............................. Balko Wind Transmission, LLC .. Goodwell Wind Project, LLC ....... Breckinridge Wind Project, LLC Alpaca Energy LLC ...................... Beaver Dam Energy LLC .............. Milan Energy LLC ........................ Oxbow Creek Energy LLC ............ Greenleaf Power Management LLC ............................................ Adelanto Solar, LLC ..................... Adelanto Solar II, LLC ................. E:\FR\FM\13AUN1.SGM 13AUN1 EG15–71–000 EG15–72–000 EG15–73–000 EG15–74–000 EG15–75–000 EG15–76–000 EG15–77–000 EG15–78–000 EG15–79–000 EG15–80–000 EG15–81–000 EG15–82–000 EG15–83–000 EG15–84–000 EG15–85–000 EG15–86–000 EG15–87–000 EG15–88–000 EG15–89–000 EG15–90–000 EG15–91–000

Agencies

[Federal Register Volume 80, Number 156 (Thursday, August 13, 2015)]
[Notices]
[Page 48519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19892]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-536-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Application

    Take notice that on July 27, 2015, Transcontinental Gas Pipe Line 
Company, LLC (Transco), PO Box 1396, Houston, Texas 77251, filed in 
Docket No. CP15-536-000 an application pursuant to section 7(b) of the 
Natural Gas Act (NGA) and part 157 of the Commission's regulations, 
requesting authorization to abandon by sale approximately 26.55 miles 
of 20-inch-diameter gathering pipeline and appurtenances to Tana 
Exploration Company LLC (Tana). Transco states that the facilities 
extend from the point of interconnection in Matagorda Island Block 669 
between Tana's 10-inch-diameter gathering pipeline and Transco's 
pipeline to Fieldwood Energy LLC's Platform A in Brazos Block A-133, 
located in federal waters offshore Texas, all as more fully set forth 
in the application which is on file with the Commission and open to 
public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Scott C. Turkington, Director Rates & Regulatory, Transcontinental Gas 
Pipe Line Company, LLC, P.O. Box 1396, Houston, Texas 77251-1396, by 
telephone at (713) 215-3391, or by email at 
sott.c.turkington@williams.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and five copies of the protest or intervention to 
the Federal Energy regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    Comment Date: 5 p.m. Eastern Time on August 27, 2015.

    Dated: August 6, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19892 Filed 8-12-15; 8:45 am]
BILLING CODE 6717-01-P