Hazardous Materials: Notification of Anticipated Delay in Administrative Appeal Decisions, 47987 [2015-19507]
Download as PDF
Federal Register / Vol. 80, No. 153 / Monday, August 10, 2015 / Notices
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials
Safety Administration
[Docket No. PHMSA–2015–0168 (Notice No.
15–14)]
Hazardous Materials: Notification of
Anticipated Delay in Administrative
Appeal Decisions
Pipeline and Hazardous
Materials Safety Administration
(PHMSA), DOT.
ACTION: Notice.
AGENCY:
issued final rule titled, ‘‘Hazardous
Materials: Enhanced Tank Car
Standards and Operational Controls for
High-Hazard Flammable Trains’’ (80 FR
26643). In accordance with applicable
regulatory requirements, this notice
provides notification to parties having
brought certain administrative appeals
of the anticipated delay in processing
these administrative appeals.
This notice advises the public
that PHMSA is currently reviewing
administrative appeals on a recently
Charles E. Betts, Director, Standards and
Rulemaking Division, Office of
Hazardous Materials Safety, (202) 366–
4512, PHMSA, 1200 New Jersey Avenue
SE., Washington, DC 20590.
SUPPLEMENTARY INFORMATION:
Appeals from
PHMSA–2012–0082–3480 ....................
American Chemistry Council (ACC) ........................
PHMSA–2012–0082–3473 ....................
American Fuel & Petrochemical Manufacturers
(AFPM).
Columbia River and Northwest Treaty Tribes .........
PHMSA–2012–0082–3470 ....................
PHMSA–2012–0082–3478 ....................
Dangerous Goods Advisory Council (DGAC) .........
PHMSA–2012–0082–3471 ....................
The Pipeline and Hazardous Materials
Safety Administration’s (PHMSA) Office
of Hazardous Materials Standards
received a number of administrative
appeals in relation to the PHMSA final
rule, titled, ‘‘Hazardous Materials:
Enhanced Tank Car Standards and
Operational Controls for High-Hazard
Flammable Trains’’ (80 FR 26643). Key
information on the administrative
appeals is provided below.
HM–251 [Docket No. PHMSA–2012–
0082]
Hazardous Materials: Enhanced Tank
Car Standards and Operational Controls
for High-Hazard Flammable Trains
Docket No.
Association of American Railroads (AAR) ...............
II. Notification of Anticipated Delay in
Appeal Decisions
tkelley on DSK3SPTVN1PROD with NOTICES
I. Appeals
FOR FURTHER INFORMATION CONTACT:
SUMMARY:
49 CFR 106.130(a)(4) provides that if
PHMSA does not issue a decision on
whether to grant or deny an
administrative appeal within 90 days
after the date that the final rule is
published in the Federal Register and
that we anticipate a substantial delay in
making a decision, PHMSA will notify
the parties having brought
administrative appeals directly and
provide an expected decision date. In
addition, PHMSA will publish a notice
of the delay in the Federal Register. Due
to the complexity of the appeals
received, we anticipate delays in
making administrative appeal decisions
as we will require additional time to
adequately review and consider the
appeals. As a result, in accordance with
49 CFR 106.130(a)(4), we are publishing
this notice in the Federal Register to
notify the public, and we will be
directly contacting parties having
brought these administrative appeals
shortly.
VerDate Sep<11>2014
18:16 Aug 07, 2015
Jkt 235001
Focus of appeal
•
•
•
•
•
•
•
•
•
•
•
•
Issued in Washington, DC, on August 4,
2015.
Magdy El-Sibaie,
Associate Administrator for Hazardous
Materials Safety.
[FR Doc. 2015–19507 Filed 8–7–15; 8:45 am]
BILLING CODE 4910–60–P
DEPARTMENT OF THE TREASURY
Office of the Comptroller of the
Currency
Agency Information Collection
Activities: Information Collection
Renewal; Comment Request; Market
Risk
Office of the Comptroller of the
Currency (OCC), Treasury.
ACTION: Notice and request for
comment.
AGENCY:
The OCC, as part of its
continuing effort to reduce paperwork
and respondent burden, invites the
general public and other Federal
agencies to take this opportunity to
comment on a continuing information
collection, as required by the Paperwork
Reduction Act of 1995 (PRA).
SUMMARY:
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
47987
Advanced Brake Signal Propagation Systems.
Scope of the Rulemaking.
Thermal Protection for Tank Cars.
Advanced Brake Signal Propagation Systems.
Retrofit Timeline and Tank Car Reporting Requirements.
Scope of the Rulemaking.
Retrofit Timeline and Tank Car Reporting Requirements.
Information Sharing/Notification.
Tribal Impacts and Consultation.
Advanced Brake Signal Propagation Systems.
Scope of the Rulemaking.
Testing and Sampling Program.
Under the PRA, Federal agencies are
required to publish notice in the
Federal Register concerning each
proposed collection of information,
including each proposed extension of an
existing collection of information, and
to allow 60 days for public comment in
response to the notice.
In accordance with the requirements
of the PRA, the OCC may not conduct
or sponsor, and the respondent is not
required to respond to, an information
collection unless it displays a currently
valid Office of Management and Budget
(OMB) control number. The OCC is
soliciting comment concerning the
renewal of its information collection
titled, ‘‘Market Risk.’’
DATES: You should submit written
comments by: October 9, 2015.
ADDRESSES: Because paper mail in the
Washington, DC area and at the OCC is
subject to delay, commenters are
encouraged to submit comments by
email, if possible. Comments may be
sent to: Legislative and Regulatory
Activities Division, Office of the
Comptroller of the Currency, Attention:
1557–0247, 400 7th Street SW., Suite
3E–218, Mail Stop 9W–11, Washington,
DC 20219. In addition, comments may
be sent by fax to (571) 465–4326 or by
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 80, Number 153 (Monday, August 10, 2015)]
[Notices]
[Page 47987]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19507]
[[Page 47987]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
[Docket No. PHMSA-2015-0168 (Notice No. 15-14)]
Hazardous Materials: Notification of Anticipated Delay in
Administrative Appeal Decisions
AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA),
DOT.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice advises the public that PHMSA is currently
reviewing administrative appeals on a recently issued final rule
titled, ``Hazardous Materials: Enhanced Tank Car Standards and
Operational Controls for High-Hazard Flammable Trains'' (80 FR 26643).
In accordance with applicable regulatory requirements, this notice
provides notification to parties having brought certain administrative
appeals of the anticipated delay in processing these administrative
appeals.
FOR FURTHER INFORMATION CONTACT: Charles E. Betts, Director, Standards
and Rulemaking Division, Office of Hazardous Materials Safety, (202)
366-4512, PHMSA, 1200 New Jersey Avenue SE., Washington, DC 20590.
SUPPLEMENTARY INFORMATION:
I. Appeals
The Pipeline and Hazardous Materials Safety Administration's
(PHMSA) Office of Hazardous Materials Standards received a number of
administrative appeals in relation to the PHMSA final rule, titled,
``Hazardous Materials: Enhanced Tank Car Standards and Operational
Controls for High-Hazard Flammable Trains'' (80 FR 26643). Key
information on the administrative appeals is provided below.
HM-251 [Docket No. PHMSA-2012-0082]
Hazardous Materials: Enhanced Tank Car Standards and Operational
Controls for High-Hazard Flammable Trains
------------------------------------------------------------------------
Appeals from Docket No. Focus of appeal
------------------------------------------------------------------------
Association of American PHMSA-2012-0082-3 Advanced
Railroads (AAR). 480. Brake Signal
Propagation Systems.
Scope of the
Rulemaking.
Thermal
Protection for Tank
Cars.
American Chemistry Council PHMSA-2012-0082-3 Advanced
(ACC). 473. Brake Signal
Propagation Systems.
Retrofit
Timeline and Tank
Car Reporting
Requirements.
Scope of the
Rulemaking.
American Fuel & Petrochemical PHMSA-2012-0082-3 Retrofit
Manufacturers (AFPM). 470. Timeline and Tank
Car Reporting
Requirements.
Columbia River and Northwest PHMSA-2012-0082-3 Information
Treaty Tribes. 478. Sharing/
Notification.
Tribal
Impacts and
Consultation.
Dangerous Goods Advisory PHMSA-2012-0082-3 Advanced
Council (DGAC). 471. Brake Signal
Propagation Systems.
Scope of the
Rulemaking.
Testing and
Sampling Program.
------------------------------------------------------------------------
II. Notification of Anticipated Delay in Appeal Decisions
49 CFR 106.130(a)(4) provides that if PHMSA does not issue a
decision on whether to grant or deny an administrative appeal within 90
days after the date that the final rule is published in the Federal
Register and that we anticipate a substantial delay in making a
decision, PHMSA will notify the parties having brought administrative
appeals directly and provide an expected decision date. In addition,
PHMSA will publish a notice of the delay in the Federal Register. Due
to the complexity of the appeals received, we anticipate delays in
making administrative appeal decisions as we will require additional
time to adequately review and consider the appeals. As a result, in
accordance with 49 CFR 106.130(a)(4), we are publishing this notice in
the Federal Register to notify the public, and we will be directly
contacting parties having brought these administrative appeals shortly.
Issued in Washington, DC, on August 4, 2015.
Magdy El-Sibaie,
Associate Administrator for Hazardous Materials Safety.
[FR Doc. 2015-19507 Filed 8-7-15; 8:45 am]
BILLING CODE 4910-60-P