Hiland Partner Holdings, LLC; Notice of Application, 46982-46983 [2015-19304]

Download as PDF 46982 Federal Register / Vol. 80, No. 151 / Thursday, August 6, 2015 / Notices Filed Date: 7/29/15. Accession Number: 20150729–5071. Comments Due: 5 p.m. ET 8/10/15. Docket Numbers: RP15–1144–000. Applicants: Florida Gas Transmission Company, LLC. Description: Section 4(d) Rate Filing: Negotiated Rates Filing on 7–30–15 to be effective 8/1/2015. Filed Date: 7/30/15. Accession Number: 20150730–5031. Comments Due: 5 p.m. ET 8/11/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 30, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–19322 Filed 8–5–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–534–000] tkelley on DSK3SPTVN1PROD with NOTICES Hiland Partner Holdings, LLC; Notice of Application Take notice that on July 17, 2015, Hiland Partner Holdings LLC (Hiland), pursuant to section 7(c) of the Federal Energy Regulatory Commission’s (FERC) regulations under the Natural Gas Act (NGA), filed in Docket No. CP15–534– 000, application for a certificate of public convenience and necessity (Application) and all authorizations necessary for it to own, operate, and maintain an existing 6.65 miles long and 6-inch in diameter natural gas pipeline (Norse Residue Line) located in Divide County, North Dakota, all as more fully set forth in the Application which is on file with the Commission and open for public inspection. The filing may also be viewed on the web at https:// VerDate Sep<11>2014 17:50 Aug 05, 2015 Jkt 235001 www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application may be directed to: Mr. Peter Trombley, Associate General Counsel, Kinder Morgan Inc., 1001 Louisiana Street, Suite 1000, Houston, Texas, 77002, by phone at (713) 420– 3348, or email at peter_trombley@ kindermorgan.com. Specifically, Hiland requests (i) certificate authorization of Norse Residue Line for the limited purpose of transporting its own natural gas from the Hiland owned Norse processing plant to an interconnect with WBI interstate gas pipeline system; (ii) a Part 157, Subpart F blanket certificate authorizing certain routine construction, operation, and abandonment activities; (iii) waivers of certain regulatory requirements; and (iv) confirmation that the Commission’s assertion of jurisdiction over the Norse Residue Line will not jeopardize the nonjurisdictional status of Hiland’s otherwise non-jurisdictional gathering and processing facilities and operations. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on August 21, 2015. E:\FR\FM\06AUN1.SGM 06AUN1 Federal Register / Vol. 80, No. 151 / Thursday, August 6, 2015 / Notices Dated: July 31, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. Dated: July 31, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–19304 Filed 8–5–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EF15–9–000] tkelley on DSK3SPTVN1PROD with NOTICES Bonneville Power Administration; Notice of Filing Take notice that on July 29, 2015 the Bonneville Power Administration submitted a tariff filing per 300.10: Bonneville Power Administration BP– 16 Rate Filing (Proposed 2016 Wholesale Power and Transmission Rate Adjustment) to be effective 10/1/ 2015. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on August 28, 2015. VerDate Sep<11>2014 17:50 Aug 05, 2015 Jkt 235001 46983 Community Wind North 7 LLC, Community Wind North 8 LLC, Community Wind North 9 LLC, Community Wind North 10 LLC, [FR Doc. 2015–19305 Filed 8–5–15; 8:45 am] Community Wind North 11 LLC, BILLING CODE 6717–01–P Community Wind North 13 LLC, Community Wind North 15 LLC, Conemaugh Power LLC, Connecticut Jet DEPARTMENT OF ENERGY Power LLC, Cottonwood Energy Federal Energy Regulatory Company LP, CP Power Sales Commission Seventeen, L.L.C., CP Power Sales Nineteen, L.L.C., CP Power Sales Combined Notice of Filings #2 Twenty, L.L.C., Crofton Bluffs Wind, LLC, DeGreeff DP, LLC, DeGreeffpa, Take notice that the Commission LLC, Devon Power LLC, Dunkirk Power received the following electric rate LLC, Elkhorn Ridge Wind, LLC, El filings: Segundo Energy Center LLC, El Segundo Docket Numbers: ER10–2265–007; Power, LLC, Energy Alternatives ER12–21–017; ER11–2211–006; ER11– 2209–006; ER11–2210–006; ER11–2207– Wholesale, LLC, Energy Plus Holdings LLC, Forward WindPower LLC, 006; ER11–2206–006; ER13–1150–004; GenConn Devon LLC, GenConn Energy ER13–1151–004; ER10–2783–012; LLC, GenConn Middletown LLC, GenOn ER10–2784–012; ER11–2855–017; Energy Management, LLC, GenOn MidER10–2791–013; ER10–2333–006; Atlantic, LLC, Green Mountain Energy ER10–2792–013; ER14–1818–007; Company, Groen Wind, LLC, High ER12–1238–005; ER10–2260–004; Lonesome Mesa, LLC, High Plains ER10–2261–004; ER10–2337–007; Ranch II, LLC, Hillcrest Wind, LLC, ER14–1668–004; ER14–1669–004; Huntley Power LLC, Independence ER14–1674–004; ER14–1670–004; Energy Group LLC, Indian River Power ER14–1671–004; ER14–1675–004; LLC, Jeffers Wind 20, LLC, Keystone ER14–1673–004; ER14–1676–004; Power LLC, Laredo Ridge Wind, LLC, ER14–1677–004; ER14–1678–004; Larswind, LLC, Long Beach Generation ER14–1679–004; ER14–1672–004; LLC, Long Beach Peakers LLC. ER10–2795–012; ER10–2798–012; Description: Notification of Change in ER10–1575–011; ER10–2339–009; Status of NRG Power Marketing LLC, et ER10–2338–009; ER10–2340–009; al. ER12–1239–005; ER10–2336–006; Filed Date: 7/29/15. ER10–2335–006; ER10–2799–012; Accession Number: 20150729–5190. ER10–2801–012; ER10–2385–006; Comments Due: 5 p.m. ET 8/19/15. ER11–3727–012; ER10–2262–003; Docket Numbers: ER15–1020–001. ER12–2413–011; ER11–2062–016; Applicants: Rising Tree Wind Farm III ER10–2346–007; ER10–2812–011; LLC. ER10–1291–017; ER10–2843–010; Description: Notice of Non-Material ER11–2508–015; ER11–2863–009; Change in Status of Rising Tree Wind ER11–4307–016; ER10–2347–006; Farm III LLC. ER10–2348–005; ER12–1711–012; Filed Date: 7/30/15. ER10–2350–006; ER10–2846–012; Accession Number: 20150730–5106. ER12–261–015; ER10–3223–006; ER10– Comments Due: 5 p.m. ET 8/20/15. 2351–006; ER10–2875–012; ER10–2368– Docket Numbers: ER15–1650–001. 005; ER10–2352–006; ER10–2264–004; Applicants: ISO New England Inc. ER10–1581–014. Description: Compliance filing: Applicants: NRG Power Marketing Market Monitor Capacity Related LLC, Agua Caliente Solar, LLC, Alta Revisions to be effective 6/1/2015. Wind I, LLC, Alta Wind II, LLC, Alta Filed Date: 7/30/15. Wind III, LLC, Alta Wind IV, LLC, Alta Accession Number: 20150730–5096. Wind V, LLC, Alta Wind X, LLC, Alta Comments Due: 5 p.m. ET 8/20/15. Wind XI, LLC, Arthur Kill Power LLC, Docket Numbers: ER15–2308–000. Astoria Gas Turbine Power LLC, Avenal Applicants: PJM Interconnection, Park LLC, Bayou Cove Peaking Power, L.L.C. LLC, Bendwind, LLC, Big Cajun I Description: Section 205(d) Rate Peaking Power LLC, Boston Energy Filing: Second Revised Service Trading and Marketing LLC, Broken Agreement No. 937; Queue Z2–108 Bow Wind, LLC, Cabrillo Power I LLC, (ISA) to be effective 6/30/2015. Cabrillo Power II LLC, CL Power Sales Filed Date: 7/30/15. Eight, L.L.C., Community Wind North 1 Accession Number: 20150730–5095. LLC, Community Wind North 2 LLC, Comments Due: 5 p.m. ET 8/20/15. Community Wind North 3 LLC, Community Wind North 5 LLC, Docket Numbers: ER15–2309–000. Applicants: PacifiCorp. Community Wind North 6 LLC, PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 80, Number 151 (Thursday, August 6, 2015)]
[Notices]
[Pages 46982-46983]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19304]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-534-000]


Hiland Partner Holdings, LLC; Notice of Application

    Take notice that on July 17, 2015, Hiland Partner Holdings LLC 
(Hiland), pursuant to section 7(c) of the Federal Energy Regulatory 
Commission's (FERC) regulations under the Natural Gas Act (NGA), filed 
in Docket No. CP15-534-000, application for a certificate of public 
convenience and necessity (Application) and all authorizations 
necessary for it to own, operate, and maintain an existing 6.65 miles 
long and 6-inch in diameter natural gas pipeline (Norse Residue Line) 
located in Divide County, North Dakota, all as more fully set forth in 
the Application which is on file with the Commission and open for 
public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions concerning this application may be directed to: Mr. 
Peter Trombley, Associate General Counsel, Kinder Morgan Inc., 1001 
Louisiana Street, Suite 1000, Houston, Texas, 77002, by phone at (713) 
420-3348, or email at peter_trombley@kindermorgan.com.
    Specifically, Hiland requests (i) certificate authorization of 
Norse Residue Line for the limited purpose of transporting its own 
natural gas from the Hiland owned Norse processing plant to an 
interconnect with WBI interstate gas pipeline system; (ii) a Part 157, 
Subpart F blanket certificate authorizing certain routine construction, 
operation, and abandonment activities; (iii) waivers of certain 
regulatory requirements; and (iv) confirmation that the Commission's 
assertion of jurisdiction over the Norse Residue Line will not 
jeopardize the non-jurisdictional status of Hiland's otherwise non-
jurisdictional gathering and processing facilities and operations.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on August 21, 2015.


[[Page 46983]]


    Dated: July 31, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19304 Filed 8-5-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.