WBI Energy Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Demicks Lake Pipeline Project and Request for Comments on Environmental Issues, 46261-46263 [2015-19069]
Download as PDF
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.5 We will
define the project-specific Area of
Potential Effects (APE) in consultation
with the SHPO(s) as the project
develops. On natural gas facility
projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
Midla. This preliminary list of issues
may be changed based on your
comments and our analysis.
• Potential impacts on lands under
the Conservation Reserve Program,
administered by the U.S. Department of
Agriculture;
• potential impacts on the Louisiana
black bear; and
• crossing of the Mississippi River.
tkelley on DSK3SPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s Web site.
Motions to intervene are more fully
described at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP15–523). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
46261
Dated: July 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19055 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF15–24–000]
WBI Energy Transmission, Inc.; Notice
of Intent To Prepare an Environmental
Assessment for the Planned Demicks
Lake Pipeline Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Demicks Lake Pipeline Project
(Project) involving construction and
operation of facilities by WBI Energy
Transmission, Inc (WBI Energy) in
McKenzie County, North Dakota. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before August 27,
2015.
If you sent comments on this project
to the Commission before the opening of
this docket on May 13, 2015, you will
need to file those comments in Docket
No. PF15–24–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
E:\FR\FM\04AUN1.SGM
04AUN1
46262
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
available to assist you at (202) 502–8258
or efiling@ferc.gov. Please carefully
follow these instructions so that your
comments are properly recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’ as
the filing type; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (PF15–24–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1A, Washington, DC 20426.
Summary of the Planned Project
WBI Energy plans to construct and
operate 22.7 miles of 24-inch-diameter
natural gas pipeline and appurtenant
facilities between a proposed nonjurisdictional gas plant, ONEOK Rockies
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
Midstream LLC’s (ONEOK) Demicks
Lake Plant, located west of Keene, North
Dakota and a tie-in along Northern
Border Pipeline Company’s (Northern
Border) existing mainline located
approximately 8 miles southeast of
Watford City, North Dakota. The Project
would provide approximately 221,500
Mmcf/d (million standard cubic feet per
day) of natural gas transportation
capacity to Northern Border’s mainline,
which would transport the gas to the
midcontinent region of the United
States. The maximum allowable
operating pressure of the new pipeline
would be 1,650 pounds per square inch
gauge.
The Demicks Lake Pipeline Project
would consist of the following facilities:
• 22.7 miles of 24-inch-diameter
natural gas pipeline;
• a meter station located at milepost
(MP) 22.7 at the site of ONEOK’s
Demicks Lake Plant;
• two pig launcher/receivers at MP
0.0 and MP 22.7; and
• one mid-point block valve located
at approximately MP 10.7.
WBI Energy also proposes to construct
a 3,300-foot-long, 16- to 24-inchdiameter tie across pipeline between the
proposed 24-inch-diameter Demicks
Lake pipeline and WBI Energy’s existing
16-inch-diameter Garden Creek II
pipeline just south of Highway 23. The
tie across pipeline facilities would
consist of a block valve on both of the
Demicks Lake pipeline and the Garden
Creek II pipeline, a pig launcher at both
ends of the tie across pipeline, and a
metering facility at one end of the tie
across pipeline.1
The general location of the Project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction of the planned facilities
would disturb about 266 acres of land
for the pipeline and aboveground
facilities. Following construction, WBI
Energy would maintain about 133 acres
of land for permanent operation of the
Project’s facilities; the remaining land
would be restored and revert to former
uses. About 67 percent of the planned
pipeline route parallels existing
pipeline, utility, or road rights-of-way.
1 The decision to construct the tie across pipeline
and associated facilities is still under review by
WBI Energy and is not shown on Project maps.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Non-Jurisdictional Facilities
Construction of ONEOK’s proposed
Demicks Lake Plant is not subject to
FERC jurisdiction. However, in the EA,
we will provide available descriptions
of the non-jurisdictional facilities and
include them under our analysis of
cumulative impacts. The plant would be
located west of Keene, North Dakota. As
proposed, the plant would be
constructed on a plot of approximately
160 acres located in the NE 1⁄4 of Section
20, Township 151 North, Range 96 West
in McKenzie County. Construction of
the plant would include the installation
of underground piping, above ground
piping, and above ground gas processing
facilities.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 3 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA/EIS we will discuss impacts
that could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
• public safety; and
• cumulative impacts.
We will also evaluate possible
alternatives to the planned project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. The purpose of the
pre-filing process is to encourage early
involvement of interested stakeholders
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
E:\FR\FM\04AUN1.SGM
04AUN1
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
and to identify and resolve issues before
the FERC receives an application. As
part of our pre-filing review, we have
begun to contact some federal and state
agencies to discuss their involvement in
the scoping process and the preparation
of the EA.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Directions for use of eLibrary
are provided on page 6 under
Additional Information. Depending on
the comments received during the
scoping process, we may also publish
and distribute the EA to the public for
an allotted comment period. We will
consider all comments on the EA before
we make our recommendations to the
Commission. To ensure we have the
opportunity to consider and address
your comments, please carefully follow
the instructions in the Public
Participation section, beginning on page
2.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues related to this
project to formally cooperate with us in
the preparation of the EA.4 Agencies
that would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
tkelley on DSK3SPTVN1PROD with NOTICES
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Office(s), and to solicit their views and
those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.5 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO(s)
as the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
5 The Advisory Council on Historic Preservation
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
Copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
2).
Becoming an Intervenor
Once WBI Energy files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
46263
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
24). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19069 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–22–000]
California Independent System
Operator Corporation; Notice of Filing
Take notice that on July 23, 2015,
California Independent System Operator
Corporation filed a compliance filing in
response to the Federal Energy
Regulatory Commission’s March 20,
2014 Order to Show Cause.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
1 Posting of Offers to Purchase Capacity, Order to
Show Cause, 146 FERC ¶ 61,203 (2014).
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Pages 46261-46263]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19069]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF15-24-000]
WBI Energy Transmission, Inc.; Notice of Intent To Prepare an
Environmental Assessment for the Planned Demicks Lake Pipeline Project
and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Demicks Lake Pipeline Project
(Project) involving construction and operation of facilities by WBI
Energy Transmission, Inc (WBI Energy) in McKenzie County, North Dakota.
The Commission will use this EA in its decision-making process to
determine whether the project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. You can make a difference by providing us with
your specific comments or concerns about the project. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
Your input will help the Commission staff determine what issues they
need to evaluate in the EA. To ensure that your comments are timely and
properly recorded, please send your comments so that the Commission
receives them in Washington, DC on or before August 27, 2015.
If you sent comments on this project to the Commission before the
opening of this docket on May 13, 2015, you will need to file those
comments in Docket No. PF15-24-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this planned
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
[[Page 46262]]
construct, operate, and maintain the planned facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has expert staff available to assist you at
(202) 502-8258 or efiling@ferc.gov. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' If you are filing a comment on a particular project,
please select ``Comment on a Filing'' as the filing type; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(PF15-24-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A,
Washington, DC 20426.
Summary of the Planned Project
WBI Energy plans to construct and operate 22.7 miles of 24-inch-
diameter natural gas pipeline and appurtenant facilities between a
proposed non-jurisdictional gas plant, ONEOK Rockies Midstream LLC's
(ONEOK) Demicks Lake Plant, located west of Keene, North Dakota and a
tie-in along Northern Border Pipeline Company's (Northern Border)
existing mainline located approximately 8 miles southeast of Watford
City, North Dakota. The Project would provide approximately 221,500
Mmcf/d (million standard cubic feet per day) of natural gas
transportation capacity to Northern Border's mainline, which would
transport the gas to the midcontinent region of the United States. The
maximum allowable operating pressure of the new pipeline would be 1,650
pounds per square inch gauge.
The Demicks Lake Pipeline Project would consist of the following
facilities:
22.7 miles of 24-inch-diameter natural gas pipeline;
a meter station located at milepost (MP) 22.7 at the site
of ONEOK's Demicks Lake Plant;
two pig launcher/receivers at MP 0.0 and MP 22.7; and
one mid-point block valve located at approximately MP
10.7.
WBI Energy also proposes to construct a 3,300-foot-long, 16- to 24-
inch-diameter tie across pipeline between the proposed 24-inch-diameter
Demicks Lake pipeline and WBI Energy's existing 16-inch-diameter Garden
Creek II pipeline just south of Highway 23. The tie across pipeline
facilities would consist of a block valve on both of the Demicks Lake
pipeline and the Garden Creek II pipeline, a pig launcher at both ends
of the tie across pipeline, and a metering facility at one end of the
tie across pipeline.\1\
---------------------------------------------------------------------------
\1\ The decision to construct the tie across pipeline and
associated facilities is still under review by WBI Energy and is not
shown on Project maps.
---------------------------------------------------------------------------
The general location of the Project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 266
acres of land for the pipeline and aboveground facilities. Following
construction, WBI Energy would maintain about 133 acres of land for
permanent operation of the Project's facilities; the remaining land
would be restored and revert to former uses. About 67 percent of the
planned pipeline route parallels existing pipeline, utility, or road
rights-of-way.
Non-Jurisdictional Facilities
Construction of ONEOK's proposed Demicks Lake Plant is not subject
to FERC jurisdiction. However, in the EA, we will provide available
descriptions of the non-jurisdictional facilities and include them
under our analysis of cumulative impacts. The plant would be located
west of Keene, North Dakota. As proposed, the plant would be
constructed on a plot of approximately 160 acres located in the NE \1/
4\ of Section 20, Township 151 North, Range 96 West in McKenzie County.
Construction of the plant would include the installation of underground
piping, above ground piping, and above ground gas processing
facilities.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\3\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA/EIS we will discuss impacts that could occur as a result
of the construction and operation of the planned project under these
general headings:
Geology and soils;
land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species;
public safety; and
cumulative impacts.
We will also evaluate possible alternatives to the planned project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process.
The purpose of the pre-filing process is to encourage early involvement
of interested stakeholders
[[Page 46263]]
and to identify and resolve issues before the FERC receives an
application. As part of our pre-filing review, we have begun to contact
some federal and state agencies to discuss their involvement in the
scoping process and the preparation of the EA.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Directions for
use of eLibrary are provided on page 6 under Additional Information.
Depending on the comments received during the scoping process, we may
also publish and distribute the EA to the public for an allotted
comment period. We will consider all comments on the EA before we make
our recommendations to the Commission. To ensure we have the
opportunity to consider and address your comments, please carefully
follow the instructions in the Public Participation section, beginning
on page 2.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues
related to this project to formally cooperate with us in the
preparation of the EA.\4\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the applicable State Historic Preservation Office(s), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\5\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO(s) as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
Copies of the EA will be sent to the environmental mailing list for
public review and comment. If you would prefer to receive a paper copy
of the document instead of the CD version or would like to remove your
name from the mailing list, please return the attached Information
Request (appendix 2).
Becoming an Intervenor
Once WBI Energy files its application with the Commission, you may
want to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site. Please note that the Commission will not accept requests for
intervenor status at this time. You must wait until the Commission
receives a formal application for the project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., PF15-
24). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19069 Filed 8-3-15; 8:45 am]
BILLING CODE 6717-01P