Columbia Gas Transmission, LLC; Notice of Application, 46265-46266 [2015-19061]
Download as PDF
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD15–31) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 18, 2015.
Dated: July 24, 2015.
Kimberly D. Bose,
Secretary.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19054 Filed 8–3–15; 8:45 am]
[FR Doc. 2015–19064 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EL14–26–000]
[Docket No. CP15–531–000]
tkelley on DSK3SPTVN1PROD with NOTICES
New York Independent System
Operator, Inc.; Notice of Filing
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on July 23, 2015,
New York Independent System
Operator, Inc. filed a compliance filing
in response to the Federal Energy
Regulatory Commission’s (Commission)
March 20, 2014 Order to Show Cause.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
1 Posting of Offers to Purchase Capacity, Order to
Show Cause, 146 FERC ¶ 61,203 (2014).
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
Take notice that on July 14, 2015,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, TX 77056, filed in
Docket No. CP15–531–000, an
application pursuant to section 7(b) of
the Natural Gas Act and Part 157 of the
Commission’s regulations, seeking
authorization to abandon by sale certain
natural gas facilities located in various
Counties in Ohio to Columbia Gas of
Ohio. The facilities consist of 13.1 miles
of pipeline, 594 measuring stations, 35
mainline consumer taps and
appurtenances. In addition, Columbia
further request that the Commission
find that following abandonment by
sale, the facilities will perform
distribution activities and thus be
exempt from the Commission’s
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
46265
jurisdiction pursuant to Section 1(b) of
the NGA, all as more fully set forth in
the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Tyler
R. Brown, Senior Counsel, Columbia
Gas Transmission, LLC, 5151 San
Felipe, Suite 2500, Houston, TX 77056,
phone: (713) 386–3797 or email:
tbrown@cpg.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
E:\FR\FM\04AUN1.SGM
04AUN1
46266
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
tkelley on DSK3SPTVN1PROD with NOTICES
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on August 18, 2015.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19061 Filed 8–3–15; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–91–000]
East Tennessee Natural Gas, LLC;
Supplemental Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Loudon Expansion
Project and Request for Comments on
Environmental Issues
On March 24, 2015, the Federal
Energy Regulatory Commission (FERC
or Commission) issued in Docket No.
CP15–91–000 a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Loudon Expansion
Project and Request for Comments on
Environmental Issues (NOI). In response
to scoping comments and data requested
by FERC staff, East Tennessee Natural
Gas, LLC (East Tennessee) has
developed Route G–1 as its new
proposed route for the above-referenced
project in Monroe and Loudon Counties,
Tennessee. FERC staff is further
evaluating Alternative Route B as
described in East Tennessee’s February
20, 2015 filing, the Eastside Alternate
Route as described in its May 8, 2015
filing, Alternate Route G as described in
its July 10, 2015 filing, as well as the
originally proposed route (Route F).
This Supplemental Notice is being
issued to seek comments on the new
Proposed Route G–1 and the alternatives
mentioned above, and opens a new
scoping period for interested parties to
file comments on environmental issues
specific to these routes.
The March 24, 2015 NOI announced
that the FERC staff will prepare an
environmental assessment (EA) to
address the environmental impacts of
the Loudon Expansion Project (Project).
Please refer to the NOI for more
information about the overall facilities
proposed by East Tennessee in
Tennessee, and FERC staff’s EA process.
The Commission will use the EA in its
decision-making process to determine
whether the Project is in the public
convenience and necessity.
We 1 are now specifically seeking
comments on the new Proposed Route
G–1, Alternate Route B, Alternate Route
G, and the Eastside Alternate Route to
help the Commission staff evaluates all
potential environmental impacts. Please
note that this supplemental scoping
period will close on August 27, 2015.
This Supplemental Notice is being
sent to the Commission’s current
BILLING CODE 6717–01–P
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
environmental mailing list for this
Project, including landowners along the
originally proposed route (Route F) and
new landowners that would be affected
by the new proposed route (Route G–1)
or the alternate routes (Alternate Routes
B, G, and the Eastside Alternate Route).
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the Project, that approval
conveys with it the right of eminent
domain. Therefore, if the easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility on My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov. Please carefully follow
these instructions so that your
comments are properly recorded.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
Web site (www.ferc.gov) under the link
to Documents and Filings. This is an
easy method for interested persons to
submit brief, text-only comments on a
project;
(2) You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Pages 46265-46266]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19061]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-531-000]
Columbia Gas Transmission, LLC; Notice of Application
Take notice that on July 14, 2015, Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite 2500, Houston, TX 77056, filed in
Docket No. CP15-531-000, an application pursuant to section 7(b) of the
Natural Gas Act and Part 157 of the Commission's regulations, seeking
authorization to abandon by sale certain natural gas facilities located
in various Counties in Ohio to Columbia Gas of Ohio. The facilities
consist of 13.1 miles of pipeline, 594 measuring stations, 35 mainline
consumer taps and appurtenances. In addition, Columbia further request
that the Commission find that following abandonment by sale, the
facilities will perform distribution activities and thus be exempt from
the Commission's jurisdiction pursuant to Section 1(b) of the NGA, all
as more fully set forth in the application, which is on file with the
Commission and open to public inspection. The filing may also be viewed
on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to
Tyler R. Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151
San Felipe, Suite 2500, Houston, TX 77056, phone: (713) 386-3797 or
email: tbrown@cpg.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in
[[Page 46266]]
the proceeding. Only parties to the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on August 18, 2015.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19061 Filed 8-3-15; 8:45 am]