Download as PDF Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices 46269 Dated: July 28, 2015. Kimberly D. Bose, Secretary. Dated: July 29, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–19063 Filed 8–3–15; 8:45 am] [FR Doc. 2015–19059 Filed 8–3–15; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Federal Energy Regulatory Commission Notice Of Revised Procedural Schedule [Docket No. CP15–532–000] of automated collection techniques or other forms of information technology. Dated: July 28, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–19065 Filed 8–3–15; 8:45 am] [Docket No. EL14–23–000] Project Nos. tkelley on DSK3SPTVN1PROD with NOTICES ISO New England Inc.; Notice of Filing Take notice that on July 23, 2015, ISO New England Inc. filed a compliance filing in response to the Federal Energy Regulatory Commission’s March 20, 2014 Order to Show Cause.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on August 18, 2015. 1 Posting of Offers to Purchase Capacity, Order to Show Cause, 146 FERC ¶ 61,203 (2014). VerDate Sep<11>2014 18:45 Aug 03, 2015 Jkt 235001 Clean River LLC. Clean River LLC. Clean River LLC. Clean River LLC. Clean River LLC. Clean River LLC. Power MR–3, P–13404–002 Power MR–1, P–13405–002 Power MR–5, P–13406–002 Power MR–2, P–13407–002 Power MR–7, P–13408–002 Power MR–6, P–13411–002 On October 31, 2012, Clean River Power MR–3, LLC, Clean River Power MR–1, LLC, Clean River Power MR–5, LLC, Clean River Power MR–2, LLC, Clean River Power MR–7, LLC, and Clean River Power MR–6, LLC, filed applications for original licenses to construct, operate, and maintain the 3megawatt (MW) Beverly Lock and Dam Water Power Project No. 13404, 4–MW Devola Lock and Dam Water Power Project No. 13405, 4–MW Malta/ McConnelsville Lock and Dam Water Power Project No. 13406, 5–MW Lowell Lock and Dam Water Power Project No. 13407, 3–MW Philo Lock and Dam Water Power Project No. 13408, and 4– MW Rokeby Lock and Dam Water Power Project No. 13411 (Muskingum River Projects), respectively. On January 14, 2014, the Commission issued a Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions (REA Notice) for the Muskingum River Projects. The REA Notice included a procedural schedule. The above applications will be processed according to the following revised procedural schedule. Milestone Target date Issue EA ........................... Comments on EA due ...... August 2015. September 2015. Any questions regarding this notice may be directed to Aaron Liberty at (202) 502–6862, or by email at aaron.liberty@ferc.gov. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Columbia Gas Transmission, LLC; Notice of Application Take notice that on July 14, 2015, Columbia Gas Transmission, LLC (Columbia), 5151 San Felipe, Suite 2500, Houston, TX 77056, filed in Docket No. CP15–531–000, an application pursuant to section 7(b) of the Natural Gas Act and Part 157 of the Commission’s regulations, seeking authorization to abandon by sale certain natural gas facilities located in various Counties in Pennsylvania to Columbia Gas of Pennsylvania. The facilities consist of 3.6 miles of pipeline, 213 measuring stations, 7 mainline consumer taps and appurtenances. In addition, Columbia further request that the Commission find that following abandonment by sale, the facilities will perform distribution activities and thus be exempt from the Commission’s jurisdiction pursuant to Section 1(b) of the NGA, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Tyler R. Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151 San Felipe, Suite 2500, Houston, TX 77056, phone: (713) 386–3797 or email: tbrown@cpg.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the E:\FR\FM\04AUN1.SGM 04AUN1

Agencies

[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Page 46269]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19059]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Of Revised Procedural Schedule

------------------------------------------------------------------------
                                                   Project Nos.
------------------------------------------------------------------------
Clean River Power MR-3, LLC.............  P-13404-002
Clean River Power MR-1, LLC.............  P-13405-002
Clean River Power MR-5, LLC.............  P-13406-002
Clean River Power MR-2, LLC.............  P-13407-002
Clean River Power MR-7, LLC.............  P-13408-002
Clean River Power MR-6, LLC.............  P-13411-002
------------------------------------------------------------------------

    On October 31, 2012, Clean River Power MR-3, LLC, Clean River Power 
MR-1, LLC, Clean River Power MR-5, LLC, Clean River Power MR-2, LLC, 
Clean River Power MR-7, LLC, and Clean River Power MR-6, LLC, filed 
applications for original licenses to construct, operate, and maintain 
the 3-megawatt (MW) Beverly Lock and Dam Water Power Project No. 13404, 
4-MW Devola Lock and Dam Water Power Project No. 13405, 4-MW Malta/
McConnelsville Lock and Dam Water Power Project No. 13406, 5-MW Lowell 
Lock and Dam Water Power Project No. 13407, 3-MW Philo Lock and Dam 
Water Power Project No. 13408, and 4-MW Rokeby Lock and Dam Water Power 
Project No. 13411 (Muskingum River Projects), respectively. On January 
14, 2014, the Commission issued a Notice of Application Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions 
(REA Notice) for the Muskingum River Projects. The REA Notice included 
a procedural schedule.
    The above applications will be processed according to the following 
revised procedural schedule.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Issue EA..................................  August 2015.
Comments on EA due........................  September 2015.
------------------------------------------------------------------------

    Any questions regarding this notice may be directed to Aaron 
Liberty at (202) 502-6862, or by email at aaron.liberty@ferc.gov.

    Dated: July 29, 2015.
 Kimberly D. Bose,
 Secretary.