Notice Of Revised Procedural Schedule, 46269 [2015-19059]
Download as PDF
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
46269
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
Dated: July 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19063 Filed 8–3–15; 8:45 am]
[FR Doc. 2015–19059 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Notice Of Revised Procedural
Schedule
[Docket No. CP15–532–000]
of automated collection techniques or
other forms of information technology.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19065 Filed 8–3–15; 8:45 am]
[Docket No. EL14–23–000]
Project Nos.
tkelley on DSK3SPTVN1PROD with NOTICES
ISO New England Inc.; Notice of Filing
Take notice that on July 23, 2015, ISO
New England Inc. filed a compliance
filing in response to the Federal Energy
Regulatory Commission’s March 20,
2014 Order to Show Cause.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 18, 2015.
1 Posting of Offers to Purchase Capacity, Order to
Show Cause, 146 FERC ¶ 61,203 (2014).
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
Clean River
LLC.
Clean River
LLC.
Clean River
LLC.
Clean River
LLC.
Clean River
LLC.
Clean River
LLC.
Power MR–3,
P–13404–002
Power MR–1,
P–13405–002
Power MR–5,
P–13406–002
Power MR–2,
P–13407–002
Power MR–7,
P–13408–002
Power MR–6,
P–13411–002
On October 31, 2012, Clean River
Power MR–3, LLC, Clean River Power
MR–1, LLC, Clean River Power MR–5,
LLC, Clean River Power MR–2, LLC,
Clean River Power MR–7, LLC, and
Clean River Power MR–6, LLC, filed
applications for original licenses to
construct, operate, and maintain the 3megawatt (MW) Beverly Lock and Dam
Water Power Project No. 13404, 4–MW
Devola Lock and Dam Water Power
Project No. 13405, 4–MW Malta/
McConnelsville Lock and Dam Water
Power Project No. 13406, 5–MW Lowell
Lock and Dam Water Power Project No.
13407, 3–MW Philo Lock and Dam
Water Power Project No. 13408, and 4–
MW Rokeby Lock and Dam Water Power
Project No. 13411 (Muskingum River
Projects), respectively. On January 14,
2014, the Commission issued a Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions (REA Notice) for
the Muskingum River Projects. The REA
Notice included a procedural schedule.
The above applications will be
processed according to the following
revised procedural schedule.
Milestone
Target date
Issue EA ...........................
Comments on EA due ......
August 2015.
September 2015.
Any questions regarding this notice
may be directed to Aaron Liberty at
(202) 502–6862, or by email at
aaron.liberty@ferc.gov.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on July 14, 2015,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, TX 77056, filed in
Docket No. CP15–531–000, an
application pursuant to section 7(b) of
the Natural Gas Act and Part 157 of the
Commission’s regulations, seeking
authorization to abandon by sale certain
natural gas facilities located in various
Counties in Pennsylvania to Columbia
Gas of Pennsylvania. The facilities
consist of 3.6 miles of pipeline, 213
measuring stations, 7 mainline
consumer taps and appurtenances. In
addition, Columbia further request that
the Commission find that following
abandonment by sale, the facilities will
perform distribution activities and thus
be exempt from the Commission’s
jurisdiction pursuant to Section 1(b) of
the NGA, all as more fully set forth in
the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Tyler
R. Brown, Senior Counsel, Columbia
Gas Transmission, LLC, 5151 San
Felipe, Suite 2500, Houston, TX 77056,
phone: (713) 386–3797 or email:
tbrown@cpg.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Page 46269]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19059]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Of Revised Procedural Schedule
------------------------------------------------------------------------
Project Nos.
------------------------------------------------------------------------
Clean River Power MR-3, LLC............. P-13404-002
Clean River Power MR-1, LLC............. P-13405-002
Clean River Power MR-5, LLC............. P-13406-002
Clean River Power MR-2, LLC............. P-13407-002
Clean River Power MR-7, LLC............. P-13408-002
Clean River Power MR-6, LLC............. P-13411-002
------------------------------------------------------------------------
On October 31, 2012, Clean River Power MR-3, LLC, Clean River Power
MR-1, LLC, Clean River Power MR-5, LLC, Clean River Power MR-2, LLC,
Clean River Power MR-7, LLC, and Clean River Power MR-6, LLC, filed
applications for original licenses to construct, operate, and maintain
the 3-megawatt (MW) Beverly Lock and Dam Water Power Project No. 13404,
4-MW Devola Lock and Dam Water Power Project No. 13405, 4-MW Malta/
McConnelsville Lock and Dam Water Power Project No. 13406, 5-MW Lowell
Lock and Dam Water Power Project No. 13407, 3-MW Philo Lock and Dam
Water Power Project No. 13408, and 4-MW Rokeby Lock and Dam Water Power
Project No. 13411 (Muskingum River Projects), respectively. On January
14, 2014, the Commission issued a Notice of Application Ready for
Environmental Analysis, and Soliciting Comments, Recommendations,
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
(REA Notice) for the Muskingum River Projects. The REA Notice included
a procedural schedule.
The above applications will be processed according to the following
revised procedural schedule.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue EA.................................. August 2015.
Comments on EA due........................ September 2015.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Aaron
Liberty at (202) 502-6862, or by email at aaron.liberty@ferc.gov.
Dated: July 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19059 Filed 8-3-15; 8:45 am]
BILLING CODE 6717-01-P