Fair Wind Power Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 46258-46259 [2015-19057]
Download as PDF
46258
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’; ‘‘PROTESTS’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19068 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
tkelley on DSK3SPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–177–000.
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
Applicants: DG North Carolina Solar
Holding, LLC.
Description: Section 203 Application
of DG North Carolina Solar Holding,
LLC.
Filed Date: 7/28/15.
Accession Number: 20150728–5214.
Comments Due: 5 p.m. ET 8/18/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1471–002.
Applicants: Blue Sky West, LLC.
Description: Notice of Change in
Status and Request for Confidential
Treatment of Blue Sky West, LLC.
Filed Date: 7/29/15.
Accession Number: 20150729–5051.
Comments Due: 5 p.m. ET 8/19/15.
Docket Numbers: ER15–2294–000.
Applicants: Pacific Gas and Electric
Company.
Description: Section 205(d) Rate
Filing: Transmission Owner Rate Case
2016 (TO17) to be effective 10/1/2015.
Filed Date: 7/29/15.
Accession Number: 20150729–5000.
Comments Due: 5 p.m. ET 8/19/15.
Docket Numbers: ER15–2295–000.
Applicants: Southwest Power Pool,
Inc.
Description: Petition of Southwest
Power Pool, Inc. For Tariff Waiver.
Filed Date: 7/28/15.
Accession Number: 20150728–5198.
Comments Due: 5 p.m. ET 8/18/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–2–000.
Applicants: MidAmerican Energy
Company.
Description: Quarterly Land
Acquisition Report of the MidAmerican
Energy Companies.
Filed Date: 7/29/15.
Accession Number: 20150729–5046.
Comments Due: 5 p.m. ET 8/19/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–19046 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2293–000]
Fair Wind Power Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Fair
Wind Power Partners, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 18,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
E:\FR\FM\04AUN1.SGM
04AUN1
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19057 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–86–000]
tkelley on DSK3SPTVN1PROD with NOTICES
ITC Grid Development LLC; Notice of
Petition for Declaratory Order
Take notice that on July 28, 2015,
pursuant to rule 207(a) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure and sections 366.3(d) and
366.4(b)(3) of the Commission’s
regulations, 18 CFR 385.207(a), 366.3(d),
and 366.4(b)(3), ITC Grid Development
LLC (ITC Grid), filed a petition for
declaratory order (petition) seeking a
Commission ruling: (1) That binding
revenue requirement bids selected as
the result of Commission-approved,
Order No. 1000-compliant, and
demonstrably competitive transmission
project selection processes will be
deemed just and reasonable when filed
at the Commission as a stated rate
pursuant to Federal Power Act (FPA)
section 205; and (2) that such binding
bids are entitled to protection under the
Mobile-Sierra standard, and may not
subsequently be changed by means of a
complaint filed under FPA section 206
unless required by the public interest.
ITC Grid requests that the Commission
rule on this petition within 90 days of
when its petition was filed, or by
October 26, 2015, in order to facilitate
ITC Grid’s participation in upcoming
competitive project solicitations, as
more fully explained in its petition. .
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 27, 2015.
Dated: July 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19060 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–523–000]
American Midstream, LLC; Notice of
Intent To Prepare an Environmental
Assessment for the Proposed Natchez
Pipeline Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Natchez Pipeline Project involving
construction and operation of facilities
by American Midstream, LLC (Midla) in
Franklin, Catahoula, and Concordia
Parishes, Louisiana, and Adams County,
Mississippi. The Commission will use
this EA in its decision-making process
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
46259
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before August 24,
2015.
If you sent comments on this project
to the Commission before the opening of
this docket on June 29, 2015, you will
need to file those comments in Docket
No. CP15–523–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Midla provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert staff
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Pages 46258-46259]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19057]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER15-2293-000]
Fair Wind Power Partners, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Fair Wind Power Partners, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is August 18, 2015.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the
[[Page 46259]]
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: July 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19057 Filed 8-3-15; 8:45 am]
BILLING CODE 6717-01-P