Town of Grand Lake, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 46264-46265 [2015-19054]
Download as PDF
46264
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 18, 2015.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19062 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–31–000]
Town of Grand Lake, Colorado; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On July 16, 2015, the Town of Grand
Lake, Colorado, filed a notice of intent
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Grand
Lake WTP Hydro Project would have an
installed capacity of 20 kilowatts (kW),
and would be located along an existing
12-inch-diameter raw water pipeline
within the city’s water treatment plant.
The project would be located in the
Town of Grand Lake, Colorado.
Applicant Contact: Jim White, Town
Manager, P.O. Box 99, Grand Lake, CO,
Phone No. (970) 627–3435.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) An
approximately 360-square-foot
powerhouse within the existing water
treatment plant building; (2) a short
intake receiving water from the existing
12-inch-diameter raw water pipeline; (3)
one turbine/generator unit with an
installed capacity of 20 kW; (4) a short
discharge returning water to the existing
12-inch-diameter raw water pipeline;
and (5) appurtenant facilities.
The proposed project would have a
total installed capacity of 20 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA .............................................
The conduit the facility uses is a tunnel, canal, pipeline,
aqueduct, flume, ditch, or similar manmade water conveyance
that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the
generation of electricity
The facility is constructed, operated, or maintained for the
generation of electric power and uses for such generation
only the hydroelectric potential of a non-federally owned
conduit
The facility has an installed capacity that does not exceed 5
megawatts
On or before August 9, 2013, the facility is not licensed, or
exempted from the licensing requirements of Part I of the
FPA
Y
FPA 30(a)(3)(C)(i), as amended by HREA .........................................
FPA 30(a)(3)(C)(ii), as amended by HREA .........................................
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(iii), as amended by HREA ........................................
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Y
Y
Y
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
1 18
E:\FR\FM\04AUN1.SGM
CFR 385.2001–2005 (2014).
04AUN1
Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD15–31) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 18, 2015.
Dated: July 24, 2015.
Kimberly D. Bose,
Secretary.
Dated: July 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–19054 Filed 8–3–15; 8:45 am]
[FR Doc. 2015–19064 Filed 8–3–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EL14–26–000]
[Docket No. CP15–531–000]
tkelley on DSK3SPTVN1PROD with NOTICES
New York Independent System
Operator, Inc.; Notice of Filing
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on July 23, 2015,
New York Independent System
Operator, Inc. filed a compliance filing
in response to the Federal Energy
Regulatory Commission’s (Commission)
March 20, 2014 Order to Show Cause.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
1 Posting of Offers to Purchase Capacity, Order to
Show Cause, 146 FERC ¶ 61,203 (2014).
VerDate Sep<11>2014
18:45 Aug 03, 2015
Jkt 235001
Take notice that on July 14, 2015,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, TX 77056, filed in
Docket No. CP15–531–000, an
application pursuant to section 7(b) of
the Natural Gas Act and Part 157 of the
Commission’s regulations, seeking
authorization to abandon by sale certain
natural gas facilities located in various
Counties in Ohio to Columbia Gas of
Ohio. The facilities consist of 13.1 miles
of pipeline, 594 measuring stations, 35
mainline consumer taps and
appurtenances. In addition, Columbia
further request that the Commission
find that following abandonment by
sale, the facilities will perform
distribution activities and thus be
exempt from the Commission’s
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
46265
jurisdiction pursuant to Section 1(b) of
the NGA, all as more fully set forth in
the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Tyler
R. Brown, Senior Counsel, Columbia
Gas Transmission, LLC, 5151 San
Felipe, Suite 2500, Houston, TX 77056,
phone: (713) 386–3797 or email:
tbrown@cpg.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Pages 46264-46265]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-19054]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-31-000]
Town of Grand Lake, Colorado; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On July 16, 2015, the Town of Grand Lake, Colorado, filed a notice
of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act (FPA), as amended by
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA).
The proposed Grand Lake WTP Hydro Project would have an installed
capacity of 20 kilowatts (kW), and would be located along an existing
12-inch-diameter raw water pipeline within the city's water treatment
plant. The project would be located in the Town of Grand Lake,
Colorado.
Applicant Contact: Jim White, Town Manager, P.O. Box 99, Grand
Lake, CO, Phone No. (970) 627-3435.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) An approximately 360-square-foot
powerhouse within the existing water treatment plant building; (2) a
short intake receiving water from the existing 12-inch-diameter raw
water pipeline; (3) one turbine/generator unit with an installed
capacity of 20 kW; (4) a short discharge returning water to the
existing 12-inch-diameter raw water pipeline; and (5) appurtenant
facilities.
The proposed project would have a total installed capacity of 20
kW.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies
Statutory provision Description (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution
of water for agricultural, municipal, or industrial
consumption and not primarily for the generation of
electricity
FPA 30(a)(3)(C)(i), as amended by HREA.... The facility is constructed, operated, or maintained for Y
the generation of electric power and uses for such
generation only the hydroelectric potential of a non-
federally owned conduit
FPA 30(a)(3)(C)(ii), as amended by HREA... The facility has an installed capacity that does not Y
exceed 5 megawatts
FPA 30(a)(3)(C)(iii), as amended by HREA.. On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing requirements of
Part I of the FPA
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
[[Page 46265]]
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD15-31) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: July 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19054 Filed 8-3-15; 8:45 am]