National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization, 45652 [2015-18838]
Download as PDF
45652
Federal Register / Vol. 80, No. 147 / Friday, July 31, 2015 / Notices
Authorization to Issue Securities of AEP
Generating Company.
Filed Date: 7/24/15.
Accession Number: 20150724–5096.
Comments Due: 5 p.m. ET 8/14/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–18787 Filed 7–30–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–535–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
National Fuel Gas Supply Corporation;
Notice of Request Under Blanket
Authorization
Take notice that on July 17, 2015,
National Fuel Gas Supply Corporation
(National Fuel) 6363 Main Street,
Williamsville, New York 14221, filed in
Docket No. CP15–535–000 a prior notice
request pursuant to sections 157.205
and 157.216 of the Commission’s
regulations under the Natural Gas Act
for authorization to abandon certain
minor underground natural gas storage
facilities within the Colden Storage
Field in Erie County, New York, under
its blanket certificate issued in Docket
No. CP83–4–000, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
VerDate Sep<11>2014
17:44 Jul 30, 2015
Jkt 235001
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed Kenneth E.
Webster, Attorney for National Fuel,
6363 Main Street, Williamsville, New
York 14221, at (716) 857–7067.
Specifically, National Fuel proposes
to abandon three observation wells:
1013–I, 1028–I and 1229–I (within the
Colden Storage Field).
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Dated: July 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–18838 Filed 7–30–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9022–2]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www2.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EISs)
Filed 07/20/2015 Through 07/24/2015
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20150203, Final, NIH, MD, NIH
Bethesda Chilled Water Systems
Improvements, Review Period Ends:
08/31/2015, Contact: Valerie
Nottingham 301–496–7775.
EIS No. 20150204, Final, BOP, KY, U.S.
Penitentiary and Federal Prison
Camp, Review Period Ends: 08/31/
2015, Contact: Issac Gaston 202–514–
6470.
EIS No. 20150205, Final, NRC, IL,
Generic—License Renewal of Nuclear
Plants, Supplement 54, Regarding
Byron Station, Units 1 and 2,
NUREG–1437, Review Period Ends:
08/31/2015, Contact: Lois M. James
301–415–3306.
EIS No. 20150206, Final, USACE, CA,
Elverta Specific Plan Project, Review
Period Ends: 08/31/2015, Contact:
Marc A. Fugler 916–557–5255.
EIS No. 20150207, Draft, DOE, NH,
Northern Pass Transmission Line
Project, Comment Period Ends: 10/29/
2015, Contact: Brian Mills 202–586–
8267.
Amended Notices
EIS No. 20150088, Draft, USMC, Other,
Commonwealth of the Northern
Mariana Islands (CJMT) Joint Military
Training, Comment Period Ends: 08/
17/2015, Contact: Lori Robertson 808–
472–1409, Revision to FR Notice
Published 05/15/2015; Extending the
Comment Period from 08/03/2015 to
08/17/2015.
EIS No. 20150196, Draft Supplement,
BR, CA, Bay Delta Conservation Plan/
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 80, Number 147 (Friday, July 31, 2015)]
[Notices]
[Page 45652]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-18838]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-535-000]
National Fuel Gas Supply Corporation; Notice of Request Under
Blanket Authorization
Take notice that on July 17, 2015, National Fuel Gas Supply
Corporation (National Fuel) 6363 Main Street, Williamsville, New York
14221, filed in Docket No. CP15-535-000 a prior notice request pursuant
to sections 157.205 and 157.216 of the Commission's regulations under
the Natural Gas Act for authorization to abandon certain minor
underground natural gas storage facilities within the Colden Storage
Field in Erie County, New York, under its blanket certificate issued in
Docket No. CP83-4-000, all as more fully set forth in the application
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed Kenneth
E. Webster, Attorney for National Fuel, 6363 Main Street,
Williamsville, New York 14221, at (716) 857-7067.
Specifically, National Fuel proposes to abandon three observation
wells: 1013-I, 1028-I and 1229-I (within the Colden Storage Field).
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link.
Dated: July 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-18838 Filed 7-30-15; 8:45 am]
BILLING CODE 6717-01-P