Combined Notice of Filings #1, 44095-44097 [2015-18106]
Download as PDF
44095
Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices
natural gas pipelines and Hinshaw 1
pipelines. In addition to fulfilling the
Commission’s obligations under the
NGA, the FERC–546 enables the
Commission to monitor the activities
and evaluate transactions of the natural
gas industry, and to ensure
competitiveness, and improved
efficiency of the industry’s operations.
In summary, the Commission uses the
FERC–546 information to:
• Ensure adequate customer
protections under section 4(f) of the
NGA;
• review rate and tariff changes by
natural gas companies for the
transportation of gas, natural gas storage
services;
• provide general industry oversight;
and
• supplement documentation during
its audits process.
Failure to collect this information
would prevent the Commission from
being able to monitor and evaluate
transactions and operations of interstate
pipelines and perform its regulatory
functions.
Type of Respondents: Pipeline
companies and storage operators.
Estimate of Annual Burden: 2 The
Commission estimates the annual public
reporting burden for the information
collection as:
FERC–546 (CERTIFICATED RATE FILINGS)
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average
burden & cost
per response 3
Total annual
burden hours
& total annual
cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Pipeline Companies .................................
50
1
50
Storage Operators ...................................
1
1
Total ..................................................
........................
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–17946 Filed 7–23–15; 8:45 am]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
1 Hinshaw pipelines are those that receive all outof-state gas from entities within or at the boundary
of a state if all the natural gas so received is
ultimately consumed within the state in which it is
received, 15 U.S.C. 717(c). Congress concluded that
Hinshaw pipelines are ‘‘matters primarily of local
concern,’’ and so are more appropriately regulated
by pertinent state agencies rather than by FERC.
The Natural Gas Act section 1(c) exempts Hinshaw
pipelines from FERC jurisdiction. A Hinshaw
VerDate Sep<11>2014
19:59 Jul 23, 2015
Jkt 235001
1
40 hrs.;
$2,880
350 hrs.;
$25,200
2,000 hrs.;
$144,000
350 hrs.;
$25,200
........................
........................
2,880
2,350 hrs.;
$169,200
25,200
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3643–000.
Applicants: PacifiCorp.
Description: Report Filing: Refund
Report (Surcharge) to be effective N/A.
Filed Date: 7/17/15.
Accession Number: 20150717–5126.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER14–693–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/17/15.
Accession Number: 20150717–5007.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER14–695–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5205.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–696–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5214.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–697–005.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/17/15.
Accession Number: 20150717–5006.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER14–699–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5219.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–699–005.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
pipeline, however, may apply for a FERC certificate
to transport gas outside of state lines.
2 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, refer to 5 Code of
Federal Regulations 1320.3.
3 The estimates for cost per response are derived
using the following formula: Average Burden Hours
per Response * $72.00 per Hour = Average Cost per
Response. The hourly cost figure comes from the
2015 FERC average salary and benefits (for one Full
Time Equivalent) of $149,489/year. FERC staff
believes that industry’s hourly cost (salary and
benefits) for this collection are similar to FERC staff
costs.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
E:\FR\FM\24JYN1.SGM
24JYN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
44096
Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices
Filed Date: 7/16/15.
Accession Number: 20150716–5225.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–700–005.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5221.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–701–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5222.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–703–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5223.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–704–004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI–
ESI Response 7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5224.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–2574–005.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2015–
07–16 FRAC MOO Compliance to be
effective 11/1/2014.
Filed Date: 7/16/15.
Accession Number: 20150716–5188.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–517–002.
Applicants: ISO New England Inc.,
Northeast Utilities Service Company (as,
Cross-Sound Cable Company, LLC, New
England Power Company, Fitchburg Gas
and Electric Light Company.
Description: Compliance filing:
Standards for Bus. Prac. & Comm.
Protocols for Public Utilities ER15–517to be effective 5/15/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5227.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–524–001.
Applicants: Tucson Electric Power
Company.
Description: Compliance filing: Order
No. 676–H Compliance Filing to be
effective 6/3/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5206.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–525–001.
VerDate Sep<11>2014
19:59 Jul 23, 2015
Jkt 235001
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order
676–H Compliance Filing to be effective
5/15/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5207.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–527–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance Filing per 5/18/15 Order in
Docket No. ER15–527–001 to be
effective 5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5083.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–530–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2015–
07–17 Attachment Q Compliance Filing
to be effective 5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5061.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–540–001.
Applicants: Alabama Power
Company.
Description: Compliance filing: OATT
Attachment O Order No. 676–H Second
Compliance Filing to be effective 5/15/
2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5107.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–543–001.
Applicants: Black Hills Power, Inc.
Description: Compliance filing:
Compliance Filing to be effective 5/15/
2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5106.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–545–001.
Applicants: Black Hills/Colorado
Electric Utility Co.
Description: Compliance filing:
Compliance Filing to be effective 5/15/
2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5108.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–546–001.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Compliance filing:
Compliance Filing to be effective 5/15/
2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5109.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–644–001.
Applicants: Idaho Power Company.
Description: Compliance filing: Order
No. 676–H Second Compliance Filing to
be effective 7/17/2015.
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
Filed Date: 7/17/15.
Accession Number: 20150717–5002.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–1675–001.
Applicants: Puget Sound Energy, Inc.
Description: Tariff Amendment:
Blaine NITSA SA No. 785 Compliance
Filing to be effective 3/1/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5136.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–2127–001.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Tariff Amendment:
NMPC errata filing of amended and
restated LGIA between National Grid
and Sithe to be effective 6/30/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5065.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–2218–000.
Applicants: Public Service Company
of New Hampshire.
Description: Tariff Cancellation:
Cancellation of PSNH FERC Rate
Schedule No.SA–1 to be effective 7/1/
2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5192.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–2219–000.
Applicants: EONY Generation
Limited.
Description: Compliance filing:
Baseline refile to be effective 7/17/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5208.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–2220–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notices of Cancellation GIA and Distrib
Serv Agmt SunEdison IM Fontana
Project to be effective 4/30/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5003.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–2221–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notices of Cancellation SGIA and
Distrib Service Agmt SunEdison 825 E.
Project to be effective 7/1/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5029.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–2222–000.
Applicants: Midcontinent
Independent System Operator, Inc., ITC
Midwest LLC.
Description: Section 205(d) Rate
Filing: 2015–07–17_SA 2820 ITC
Midwest-SMEC D–TIA to be effective 7/
31/2015.
E:\FR\FM\24JYN1.SGM
24JYN1
Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices
Filed Date: 7/17/15.
Accession Number: 20150717–5110.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15–2223–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Michigan Electric Transmission
Company, LLC, Wolverine Power
Supply Cooperative, Inc.
Description: Section 205(d) Rate
Filing: 2015–07–17_SA 2818 METCWolverine Power E&P (J392) to be
effective 7/18/2015.
Filed Date: 7/17/15.
Accession Number: 20150717–5131.
Comments Due: 5 p.m. ET 8/7/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–18106 Filed 7–23–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–026]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
FirstLight Hydro Generating Company;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
to Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
Temporary Variance.
b. Project No.: 2662–026.
c. Date Filed: June 30, 2015.
d. Applicant: FirstLight Hydro
Generating Company (licensee).
e. Name of Project: Scotland
Hydroelectric Project.
VerDate Sep<11>2014
19:59 Jul 23, 2015
Jkt 235001
f. Location: Windham County,
Connecticut.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Richard
Laudenat, Plant Manager, (860) 350–
3617, or richard.laudenat@
gdfsuezna.com.
i. FERC Contact: Alicia Burtner, (202)
502–8038, or alicia.burtner@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number (P–
2662–026) on any comments, motions,
or recommendations filed.
k. Description of Request: The
licensee requests a one-year temporary
variance from the operating
requirements of the Commission’s
November 21, 2013 Order Issuing New
License and Denying Competing License
Application. Specifically, the licensee
requests to operate its turbine in cycling
mode, lower the flashboards and the
operating range of the reservoir
elevation, continuously spill 10 cubic
feet per second, and keep the existing
flow valve closed unless otherwise
authorized by the Connecticut
Department of Energy and
Environmental Protection. Due to
economic shifts, the licensee indicates
that it is no longer feasible to install a
low-flow turbine that had been
paramount to being able to comply with
the license conditions. The licensee
requests this variance in order to
maintain compliance while determining
an appropriate alternative operating
scenario.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
44097
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project
operations, which are the subject of the
variance. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 80, Number 142 (Friday, July 24, 2015)]
[Notices]
[Pages 44095-44097]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-18106]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-3643-000.
Applicants: PacifiCorp.
Description: Report Filing: Refund Report (Surcharge) to be
effective N/A.
Filed Date: 7/17/15.
Accession Number: 20150717-5126.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER14-693-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/17/15.
Accession Number: 20150717-5007.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER14-695-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5205.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-696-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5214.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-697-005.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/17/15.
Accession Number: 20150717-5006.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER14-699-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5219.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-699-005.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
[[Page 44096]]
Filed Date: 7/16/15.
Accession Number: 20150716-5225.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-700-005.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5221.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-701-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5222.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-703-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5223.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-704-004.
Applicants: Entergy Services, Inc.
Description: Tariff Amendment: EAI-ESI Response 7-16-2015 to be
effective 12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716-5224.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14-2574-005.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2015-07-16 FRAC MOO Compliance to
be effective 11/1/2014.
Filed Date: 7/16/15.
Accession Number: 20150716-5188.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15-517-002.
Applicants: ISO New England Inc., Northeast Utilities Service
Company (as, Cross-Sound Cable Company, LLC, New England Power Company,
Fitchburg Gas and Electric Light Company.
Description: Compliance filing: Standards for Bus. Prac. & Comm.
Protocols for Public Utilities ER15-517- to be effective 5/15/2015.
Filed Date: 7/16/15.
Accession Number: 20150716-5227.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15-524-001.
Applicants: Tucson Electric Power Company.
Description: Compliance filing: Order No. 676-H Compliance Filing
to be effective 6/3/2015.
Filed Date: 7/16/15.
Accession Number: 20150716-5206.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15-525-001.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order 676-H Compliance Filing to be
effective 5/15/2015.
Filed Date: 7/16/15.
Accession Number: 20150716-5207.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15-527-002.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing per 5/18/15 Order
in Docket No. ER15-527-001 to be effective 5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5083.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-530-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2015-07-17 Attachment Q Compliance
Filing to be effective 5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5061.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-540-001.
Applicants: Alabama Power Company.
Description: Compliance filing: OATT Attachment O Order No. 676-H
Second Compliance Filing to be effective 5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5107.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-543-001.
Applicants: Black Hills Power, Inc.
Description: Compliance filing: Compliance Filing to be effective
5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5106.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-545-001.
Applicants: Black Hills/Colorado Electric Utility Co.
Description: Compliance filing: Compliance Filing to be effective
5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5108.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-546-001.
Applicants: Cheyenne Light, Fuel and Power Company.
Description: Compliance filing: Compliance Filing to be effective
5/15/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5109.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-644-001.
Applicants: Idaho Power Company.
Description: Compliance filing: Order No. 676-H Second Compliance
Filing to be effective 7/17/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5002.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-1675-001.
Applicants: Puget Sound Energy, Inc.
Description: Tariff Amendment: Blaine NITSA SA No. 785 Compliance
Filing to be effective 3/1/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5136.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-2127-001.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Tariff Amendment: NMPC errata filing of amended and
restated LGIA between National Grid and Sithe to be effective 6/30/
2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5065.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-2218-000.
Applicants: Public Service Company of New Hampshire.
Description: Tariff Cancellation: Cancellation of PSNH FERC Rate
Schedule No.SA-1 to be effective 7/1/2015.
Filed Date: 7/16/15.
Accession Number: 20150716-5192.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15-2219-000.
Applicants: EONY Generation Limited.
Description: Compliance filing: Baseline refile to be effective 7/
17/2015.
Filed Date: 7/16/15.
Accession Number: 20150716-5208.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15-2220-000.
Applicants: Southern California Edison Company.
Description: Tariff Cancellation: Notices of Cancellation GIA and
Distrib Serv Agmt SunEdison IM Fontana Project to be effective 4/30/
2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5003.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-2221-000.
Applicants: Southern California Edison Company.
Description: Tariff Cancellation: Notices of Cancellation SGIA and
Distrib Service Agmt SunEdison 825 E. Project to be effective 7/1/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5029.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-2222-000.
Applicants: Midcontinent Independent System Operator, Inc., ITC
Midwest LLC.
Description: Section 205(d) Rate Filing: 2015-07-17_SA 2820 ITC
Midwest-SMEC D-TIA to be effective 7/31/2015.
[[Page 44097]]
Filed Date: 7/17/15.
Accession Number: 20150717-5110.
Comments Due: 5 p.m. ET 8/7/15.
Docket Numbers: ER15-2223-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Michigan Electric Transmission Company, LLC, Wolverine Power Supply
Cooperative, Inc.
Description: Section 205(d) Rate Filing: 2015-07-17_SA 2818 METC-
Wolverine Power E&P (J392) to be effective 7/18/2015.
Filed Date: 7/17/15.
Accession Number: 20150717-5131.
Comments Due: 5 p.m. ET 8/7/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-18106 Filed 7-23-15; 8:45 am]
BILLING CODE 6717-01-P