Alexander Wind Farm, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 43422-43423 [2015-17945]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
43422
Federal Register / Vol. 80, No. 140 / Wednesday, July 22, 2015 / Notices
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–702–004.
Applicants: Entergy Arkansas, Inc.
Description: Tariff Amendment: EAI–
ESI_Response_7–16–2015 to be effective
12/31/9998.
Filed Date: 7/16/15.
Accession Number: 20150716–5152.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER14–1332–001.
Applicants: DATC Path 15, LLC.
Description: Compliance filing:
Compliance to 2181401 to be effective
5/17/2014.
Filed Date: 7/16/15.
Accession Number: 20150716–5134.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–1799–001.
Applicants: PJM Interconnection,
L.L.C., Virginia Electric and Power
Company.
Description: Tariff Amendment:
Virginia Electric and Power submits
revisions to Service Agreement No. 3453
to be effective 5/4/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5142.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–2214–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original SA Nos. 4205 and 4206 (Z2–
043/AA1–072 and Z2–044 ISAs) to be
effective 6/16/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5096.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–2215–000.
Applicants: San Diego Gas & Electric
Company.
Description: § 205(d) Rate Filing:
SDG&E TO4 Formula Depreciation Rate
Change 2015 to be effective 1/1/2016.
Filed Date: 7/16/15.
Accession Number: 20150716–5135.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–2216–000.
Applicants: EONY Generation
Limited.
Description: Compliance filing:
MBR—EONY Generation Limited to be
effective 7/17/2105.
Filed Date: 7/16/15.
Accession Number: 20150716–5138.
Comments Due: 5 p.m. ET 8/6/15.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA15–2–000.
Applicants: Indigo Generation LLC,
Larkspur Energy LLC, Wildflower
Energy LP, Mariposa Energy, LLC.
Description: Quarterly Land
Acquisition Report of the DGC
Companies under LA15–2.
Filed Date: 7/16/15.
VerDate Sep<11>2014
19:59 Jul 21, 2015
Jkt 235001
Accession Number: 20150716–5104.
Comments Due: 5 p.m. ET 8/6/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–17918 Filed 7–21–15; 8:45 am]
BILLING CODE 6717–01–P
Dated: July 16, 2015.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2015–17948 Filed 7–21–15; 8:45 am]
BILLING CODE 6717–01–P
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meeting related to the
transmission planning activities of the
Midcontinent Independent System
Operator, Inc. (MISO):
MISO Planning Advisory Committee
July 29, 2015, 9 a.m.–4:00 p.m. (EST)
The above-referenced meeting will be
held at: MISO Headquarters, 720 City
Center Drive, Carmel, IN 46032.
Further information may be found at
www.misoenergy.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket Nos. ER13–1944, et al., PJM
Interconnection, LLC
Docket No. ER14–1174, Southwest
Power Pool, Inc.
Docket No. ER14–1736, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2445, Midcontinent
Independent System Operator, Inc.
Docket No. ER13–1864, Southwest
Power Pool, Inc.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Docket No. EL14–21, Southwest Power
Pool, Inc. v. Midcontinent
Independent System Operator, Inc.
Docket No. EL14–30, Midcontinent
Independent System Operator, Inc. v.
Southwest Power Pool, Inc.
Docket No. EL11–34, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. EL13–88, Northern Indiana
Public Service Company v.
Midcontinent Independent System
Operator, Inc. and PJM
Interconnection, L.L.C.
Docket Nos. ER13–1923, et al.,
Midcontinent Independent System
Operator, Inc.
Docket Nos. ER13–1937, et al.,
Southwest Power Pool, Inc.
For more information, contact Chris
Miller, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5936 or
christopher.miller@ferc.gov; or Jason
Strong, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–6124 or
jason.strong@ferc.gov.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–2135–000]
Alexander Wind Farm, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Alexander Wind Farm, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
E:\FR\FM\22JYN1.SGM
22JYN1
Federal Register / Vol. 80, No. 140 / Wednesday, July 22, 2015 / Notices
LLC, Florida Power Development LLC,
Utility Contract Funding, L.L.C.
Description: Notice of Non-Material
Change in Status of J.P. Morgan Sellers.
Filed Date: 7/15/15.
Accession Number: 20150715–5179.
Comments Due: 5 p.m. ET 8/5/15.
Docket Numbers: ER10–3297–006.
Applicants: Powerex Corp.
Description: Notice of Non-Material
Change in Status of Powerex Corp.
Filed Date: 7/15/15.
Accession Number: 20150715–5183.
Comments Due: 5 p.m. ET 8/5/15.
Docket Numbers: ER13–1489–005;
ER13–1488–003.
Applicants: Quantum Choctaw Power,
LLC, Quantum Lake Power, LP,
Quantum Pasco Power, LP.
Description: Supplement to December
23, 2014 Updated Market Power
Analysis of the Quantum Entities.
Filed Date: 7/15/15.
Accession Number: 20150715–5181.
Comments Due: 5 p.m. ET 8/5/15.
Docket Numbers: ER15–518–003.
Applicants: Duke Energy Florida, Inc.,
Duke Energy Progress, Inc., Duke Energy
Carolinas, LLC.
Description: Compliance filing: Order
676–H Compliance Filing to be effective
7/15/2015.
Filed Date: 7/15/15.
Accession Number: 20150715–5089.
Comments Due: 5 p.m. ET 8/5/15.
Docket Numbers: ER15–1407–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–07–16_SA 2767 2nd Amendment
to ATC-Manitowoc CFA to be effective
5/31/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5048.
Dated: July 16, 2015.
Comments Due: 5 p.m. ET 8/6/15.
Kimberly D. Bose,
Docket Numbers: ER15–1411–002.
Secretary.
Applicants: Midcontinent
Independent System Operator, Inc.
[FR Doc. 2015–17945 Filed 7–21–15; 8:45 am]
Description: Tariff Amendment:
BILLING CODE 6717–01–P
2015–07–16_SA 2770 2nd Amendment
to ATC-Sun Prairie CFA to be effective
5/31/2015.
DEPARTMENT OF ENERGY
Filed Date: 7/16/15.
Federal Energy Regulatory
Accession Number: 20150716–5045.
Commission
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–1481–002.
Combined Notice of Filings #1
Applicants: Midcontinent
Independent System Operator, Inc.
Take notice that the Commission
Description: Tariff Amendment:
received the following electric rate
2015–07–16_SA 2776 2nd Amendment
filings:
to ATC-Village of Prairie du Sac CFA to
Docket Numbers: ER10–2331–033;
ER14–630–010; ER10–2319–025; ER10– be effective 6/9/2015.
Filed Date: 7/16/15.
2317–025; ER10–2326–031; ER14–1468–
Accession Number: 20150716–5053.
009; ER13–1351–007; ER10–2330–032.
Comments Due: 5 p.m. ET 8/6/15.
Applicants: J.P. Morgan Ventures
Energy Corporation, AlphaGen Power
Docket Numbers: ER15–1482–002.
LLC, BE Alabama LLC, BE CA LLC,
Applicants: Midcontinent
Cedar Brakes I, L.L.C., KMC Thermo,
Independent System Operator, Inc.
tkelley on DSK3SPTVN1PROD with NOTICES
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 5,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
VerDate Sep<11>2014
19:59 Jul 21, 2015
Jkt 235001
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
43423
Description: Tariff Amendment:
2015–07–16_SA 2777 2nd Amendment
to ATC-Wisconsin Rapids CFA to be
effective 6/9/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5056.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–1483–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–07–16_SA 2775 2nd Amendment
to ATC-Marshfield CFA to be effective
6/9/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5051.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–1618–001.
Applicants: Duke Energy Florida, Inc.
Description: Compliance filing: DEF
IA Annual Cost Factor Update
Amendment to RS 91 to be effective 5/
1/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5037.
Comments Due: 5 p.m. ET 8/6/15.
Docket Numbers: ER15–2212–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: Rate Schedule 13—Western Area
Power Administration JOA Cancellation
to be effective 12/31/9998.
Filed Date: 7/15/15.
Accession Number: 20150715–5151.
Comments Due: 5 p.m. ET 8/5/15.
Docket Numbers: ER15–2213–000.
Applicants: Portland General Electric
Company.
Description: Compliance filing: 2nd
NAESB V3 Standards Compliance Filing
to be effective 5/15/2015.
Filed Date: 7/16/15.
Accession Number: 20150716–5055.
Comments Due: 5 p.m. ET 8/6/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 80, Number 140 (Wednesday, July 22, 2015)]
[Notices]
[Pages 43422-43423]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-17945]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER15-2135-000]
Alexander Wind Farm, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Alexander Wind Farm, LLC's application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to
[[Page 43423]]
intervene or protest must serve a copy of that document on the
Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is August 5, 2015.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: July 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-17945 Filed 7-21-15; 8:45 am]
BILLING CODE 6717-01-P