Linden VFT, LLC v. PJM Interconnection, L.L.C.; Notice of Amended Complaint, 42797 [2015-17695]

Download as PDF Federal Register / Vol. 80, No. 138 / Monday, July 20, 2015 / Notices Electronic Access to This Document: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF). To use PDF you must have Adobe Acrobat Reader, which is available free at the site. You may also access documents of the Department published in the Federal Register by using the article search feature at: www.federalregister.gov. Specifically, through the advanced search feature at this site, you can limit your search to documents published by the Department. Dated: July 15, 2015. Michael K. Yudin, Assistant Secretary for Special Education and Rehabilitative Services. [FR Doc. 2015–17766 Filed 7–17–15; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15–67–000] mstockstill on DSK4VPTVN1PROD with NOTICES Linden VFT, LLC v. PJM Interconnection, L.L.C.; Notice of Amended Complaint Take notice that on July 10, 2015, pursuant to sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824(e) and 825(e) and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Linden VFT, LLC (Complainant), filed an amended complaint against PJM Interconnection, L.L.C. (PJM or Respondent), alleging that the Respondent’s proposed cost allocations for projects resulting from PJM’s 2013 Regional Transmission Expansion Plan, including Public Service Electric and Gas Company upgrades, are unjust, unreasonable, unduly discriminatory, and preferential, as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts for the Respondent as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of VerDate Sep<11>2014 16:30 Jul 17, 2015 Jkt 235001 the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 30, 2015. Dated: July 14, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–17695 Filed 7–17–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–3576–012; ER11–3401–011. Applicants: Golden Spread Electric Cooperative, Inc., Golden Spread Panhandle Wind Ranch, LLC. Description: Notice of Non-material Change in Status of Golden Spread Electric Cooperative, Inc. Filed Date: 7/13/15 Accession Number: 20150713–5221. Comments Due: 5 p.m. ET 8/3/15. PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 42797 Docket Numbers: ER13–1947–001. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Designation of Filing Party assoc to Compliance Filing in Docket No. ER13– 1947 to be effective N/A. Filed Date: 7/14/15. Accession Number: 20150714–5095. Comments Due: 5 p.m. ET 8/4/15. Docket Numbers: ER15–1196–003. Applicants: Nevada Power Company, Sierra Pacific Power Company. Description: Compliance Filing with no tariff revisions of Nevada Power Company, et al. Filed Date: 7/13/15. Accession Number: 20150713–5227. Comments Due: 5 p.m. ET 8/3/15. Docket Numbers: ER15–2200–000. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance Filing per 5/14/2015 Order in Docket No. ER13–1947–000 to be effective 1/1/2014. Filed Date: 7/14/15. Accession Number: 20150714–5087. Comments Due: 5 p.m. ET 8/4/15. Docket Numbers: ER15–2201–000. Applicants: Alabama Power Company. Description: Section 205(d) Rate Filing: Wheeler Solar (McRae Solar) SGIA Filing to be effective 6/29/2015. Filed Date: 7/14/15. Accession Number: 20150714–5107. Comments Due: 5 p.m. ET 8/4/15. Docket Numbers: ER15–2202–000. Applicants: Alabama Power Company. Description: Section 205(d) Rate Filing: Wheeler Solar (Wheeler Solar) SGIA Filing to be effective 6/29/2015. Filed Date: 7/14/15. Accession Number: 20150714–5108. Comments Due: 5 p.m. ET 8/4/15. Docket Numbers: ER15–2203–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) Rate Filing: 2015–07–14_SA 2819 Certificate of Concurrence ComEd-Ameren TIA to be effective 7/13/2015. Filed Date: 7/14/15. Accession Number: 20150714–5127. Comments Due: 5 p.m. ET 8/4/15. Docket Numbers: ER15–2204–000. Applicants: California Independent System Operator Corporation. Description: Section 205(d) Rate Filing: 2015–07–14 Pricing Enhancements—ETC–TOR SelfSchedules to be effective 9/15/2015. Filed Date: 7/14/15. Accession Number: 20150714–5135. Comments Due: 5 p.m. ET 8/4/15. E:\FR\FM\20JYN1.SGM 20JYN1

Agencies

[Federal Register Volume 80, Number 138 (Monday, July 20, 2015)]
[Notices]
[Page 42797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-17695]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL15-67-000]


Linden VFT, LLC v. PJM Interconnection, L.L.C.; Notice of Amended 
Complaint

    Take notice that on July 10, 2015, pursuant to sections 206 and 306 
of the Federal Power Act, 16 U.S.C. 824(e) and 825(e) and Rule 206 of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.206, Linden VFT, LLC (Complainant), 
filed an amended complaint against PJM Interconnection, L.L.C. (PJM or 
Respondent), alleging that the Respondent's proposed cost allocations 
for projects resulting from PJM's 2013 Regional Transmission Expansion 
Plan, including Public Service Electric and Gas Company upgrades, are 
unjust, unreasonable, unduly discriminatory, and preferential, as more 
fully explained in the complaint.
    The Complainant certifies that copies of the complaint were served 
on the contacts for the Respondent as listed on the Commission's list 
of Corporate Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on July 30, 2015.

    Dated: July 14, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-17695 Filed 7-17-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.