Download as PDF 42096 Federal Register / Vol. 80, No. 136 / Thursday, July 16, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP15–1062–000. Applicants: WBI Energy Transmission, Inc. Description: § 4(d) rate filing per 154.204: Inactive Points to be effective 7/18/2015. Filed Date: 6/17/15. Accession Number: 20150617–5221. Comments Due: 5 p.m. ET 6/29/15. Docket Numbers: RP15–1063–000. Applicants: Black Hills Shoshone Pipeline, LLC Description: Compliance filing per 154.203: Black Hills Shoshone Pipeline LLC Baseline Tariff Filing to be effective 7/1/2015. Filed Date: 6/17/15. Accession Number: 20150617–5269. Comments Due: 5 p.m. ET 6/29/15. Docket Numbers: RP15–1064–000. Applicants: Honeoye Storage Corporation. Description: Compliance filing per 154.203: Honeoye Storage Corp, Pipeline Map Compliance Filing to be effective 8/1/2015. Filed Date: 6/18/15. Accession Number: 20150618–5050. Comments Due: 5 p.m. ET 6/30/15. Docket Numbers: RP15–1065–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) rate filing per 154.204: Amendment to Neg Rate Agmt (Encana 37663–105) to be effective 6/18/ 2015. Filed Date: 6/18/15. Accession Number: 20150618–5079. Comments Due: 5 p.m. ET 6/30/15. Docket Numbers: CP15–519. Applicants: TC Offshore LLC. Description: Abbreviated Application to Abandon Part 157 Service Rate Schedule X–64 of TC Offshore LLC under CP15–519. Filed Date: 6/18/15. Accession Number: 20150618–5131. Comments Due: 5 p.m. ET 7/9/15. Docket Numbers: RP15–1066–000. Applicants: Bobcat Gas Storage. Description: § 4(d) rate filing per 154.204: Bobcat 2015 Cleanup Filing to be effective 7/20/2015. Filed Date: 6/19/15. Accession Number: 20150619–5056. Comments Due: 5 p.m. ET 7/1/15. Docket Numbers: RP15–1067–000. Applicants: Egan Hub Storage, LLC. VerDate Sep<11>2014 17:39 Jul 15, 2015 Jkt 235001 Description: § 4(d) rate filing per 154.204: Egan 2015 Cleanup Filing to be effective 7/20/2015. Filed Date: 6/19/15. Accession Number: 20150619–5057. Comments Due: 5 p.m. ET 7/1/15. Docket Numbers: RP15–1068–000. Applicants: East Tennessee Natural Gas, LLC. Description: § 4(d) rate filing per 154.204: ETNG 2015 Negotiated Rate Cleanup Filing to be effective. Filed Date: 6/19/15. Accession Number: 20150619–5058. Comments Due: 5 p.m. ET 7/1/15. Docket Numbers: RP15–1069–000. Applicants: Saltville Gas Storage Company L.L.C. Description: § 4(d) rate filing per 154.204: SGSC 2015 Negotiated Rates Cleanup Filing to be effective 7/20/ 2015. Filed Date: 6/19/15. Accession Number: 20150619–5059. Comments Due: 5 p.m. ET 7/1/15. Docket Numbers: RP15–1070–000. Applicants: WBI Energy Transmission, Inc. Description: § 4(d) rate filing per 154.204: NAESB Revisions to be effective 7/20/2015. Filed Date: 6/19/15. Accession Number: 20150619–5064. Comments Due: 5 p.m. ET 7/1/15 Docket Numbers: RP15–1071–000. Applicants: High Point Gas Transmission, LLC. Description: § 4(d) rate filing per 154.204: Off-System Capacity Filing to be effective 7/23/2015. Filed Date: 6/22/15. Accession Number: 20150622–5077. Comments Due: 5 p.m. ET 7/6/15. Docket Numbers: RP15–1072–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) rate filing per 154.204: BG Energy Merchants’ Negotiated Rate to be effective 6/23/ 2015. Filed Date: 6/22/15. Accession Number: 20150622–5135. Comments Due: 5 p.m. ET 7/6/15. Docket Numbers: RP15–1073–000. Applicants: WBI Energy Transmission, Inc. Description: § 4(d) rate filing per 154.204: 2015 Revised Non-conforming Negotiated SA of Basin Electric to be effective 6/1/2015. Filed Date: 6/22/15. Accession Number: 20150622–5175. Comments Due: 5 p.m. ET 7/6/15. Docket Numbers: RP15–584–000. Applicants: Rockies Express Pipeline LLC. Description: Compliance filing per 154.501: Refund Report RP15–584 to be effective N/A0. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Filed Date: 6/22/15. Accession Number: 20150622–5183. Comments Due: 5 p.m. ET 7/6/15. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP15–905–001. Applicants: Gas Transmission Northwest LLC. Description: Compliance filing per 154.203: Compliance to RP15–905–000. to be effective 6/1/2015. Filed Date: 6/18/15. Accession Number: 20150618–5034. Comments Due: 5 p.m. ET 6/30/15. Docket Numbers: RP15–905–001. Applicants: Gas Transmission Northwest LLC. Description: Compliance filing per 154.203: Compliance to RP15–905–000. to be effective 6/1/2015. Filed Date: 6/18/15. Accession Number: 20150618–5034. Comments Due: 5 p.m. ET 6/30/15. Docket Numbers: RP15–276–001. Applicants: MoGas Pipeline LLC. Description: Compliance filing per 154.203: MoGas Pipeline LLC Compliance Filing to be effective 7/1/ 2015. Filed Date: 6/19/15. Accession Number: 20150619–5098. Comments Due: 5 p.m. ET 7/1/15. Docket Numbers: RP15–23–007. Applicants: Transwestern Pipeline Company, LLC. Description: Compliance filing per 154.203: RP15–23 Rate Case Settlement Agreement to be effective N/A. Filed Date: 6/22/15. Accession Number: 20150622–5000. Comments Due: 5 p.m. ET 7/6/15. Docket Numbers: RP15–956–002. Applicants: Gulf South Pipeline Company, LP. Description: Compliance filing per 154.203: Compliance Filing in RP15– 596–000., et al. to be effective 5/1/2015. Filed Date: 6/23/15. Accession Number: 20150623–5029. Comments Due: 5 p.m. ET 7/6/15. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by E:\FR\FM\16JYN1.SGM 16JYN1 Federal Register / Vol. 80, No. 136 / Thursday, July 16, 2015 / Notices clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 23, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–17440 Filed 7–15–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM15–20–000] tkelley on DSK3SPTVN1PROD with NOTICES Five-Year Review of the Oil Pipeline Index; Notice Regarding Conference On June 30, 2015, the Commission issued a notice of inquiry (NOI) in the above-captioned proceeding initiating its five-year review of the oil pipeline index. The Commission stated that it planned to hold a conference on July 30, 2015, regarding the issues raised by the NOI.1 The conference will be held on July 30, 2015, from 2:00 p.m. to 3:30 p.m. (EST), at the offices of the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The conference will be led by Commission Staff and may be attended by one or more Commissioners. The purpose of the conference is to gain an understanding of the positions of the parties in advance of the filed comments in this proceeding. At the conference, interested persons will be permitted to give brief presentations regarding the index level proposed in the notice of inquiry and any alternative methodologies for calculating the index level. Each presenter will be allowed up to 15 minutes as time permits based on the number of presentations. The technical conference will not be transcribed. However, there will be a free webcast of the conference. The webcast will allow persons to listen to the technical conference, but not participate. Anyone with Internet access who wants to listen to the conference can do so my navigating to the Calendar of Events at www.ferc.gov and locating the technical conference in the Calendar. The Calendar will contain a link to the webcast. The Capitol 1 Five-Year Review of the Oil Pipeline Index, 151 FERC ¶ 61,278 (2015). VerDate Sep<11>2014 17:39 Jul 15, 2015 Jkt 235001 Connection provides technical support for the webcast and offers the option of listening to the meeting via a phonebridge for a fee. If you have any questions, visit www.CapitolConnection.org or call 703– 993–3100.2 Those interested in providing presentations are asked to submit a brief request to speak in this docket on or before July 15, 2015, by completing the form available at: (https://www.ferc.gov/ whats-new/registration/07-30-15-RM-1520-000-speaker-form.asp). Once the speaking requests have been submitted, a further notice will be issued with the speaking schedule for the conference. This conference is open to the public. Pre-registration for attending is not required, but is recommended. Registrations can be made at: (https:// www.ferc.gov/whats-new/registration/ 07-30-15-form.asp). Commission conferences are accessible under section 208 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–502–8659 (TTY); or send a fax to 202–208–2106 with the required accommodations. For further information about these conferences, please contact: Sarah McKinley, Office of External Affairs, (202) 502–8004, Sarah.McKinley@ ferc.gov. Dated: July 10, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–17423 Filed 7–15–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–523–000] American Midstream (Midla), LLC; Notice of Application Take notice that on June 29, 2015, American Midstream (Midla), LLC (Midla) filed an application with the Federal Energy Regulatory Commission pursuant to section 7(c) of the Natural Gas Act (NGA) requesting authority to construct its Natchez Pipeline, consisting of approximately 51.97 miles of 12-inch-diameter pipeline and approximately 0.5 miles of 4-inchdiameter lateral pipeline from 2 The webcast will continue to be available on the Calendar of Events on the Commission’s Web site at www.ferc.gov for three months after the conference. PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 42097 interconnections with Tennessee Gas Pipeline Company, L.L.C. and Columbia Gulf Transmission, LLC in the Winnsboro, Louisiana area, through Franklin, Catahoula, and Concordia Parishes, Louisiana, under the Mississippi River, and into Adams County, Mississippi to the Natchez, Mississippi area. The Natchez Pipeline will provide up to 48,300 Dekatherms per day at an estimated cost of $66.2 million, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the application should be directed to Dennis J. Kelly, Senior Counsel for Midla, 1400 16th Street, Suite 300, Denver, CO 80202, by phone at (720) 457–6076 or by email at dkelly@ AmericanMidstream.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance E:\FR\FM\16JYN1.SGM 16JYN1

Agencies

[Federal Register Volume 80, Number 136 (Thursday, July 16, 2015)]
[Notices]
[Pages 42096-42097]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-17440]



[[Page 42096]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

    Docket Numbers: RP15-1062-000.
    Applicants: WBI Energy Transmission, Inc.
    Description: Sec.  4(d) rate filing per 154.204: Inactive Points to 
be effective 7/18/2015.
    Filed Date: 6/17/15.
    Accession Number: 20150617-5221.
    Comments Due: 5 p.m. ET 6/29/15.

    Docket Numbers: RP15-1063-000.
    Applicants: Black Hills Shoshone Pipeline, LLC
    Description: Compliance filing per 154.203: Black Hills Shoshone 
Pipeline LLC Baseline Tariff Filing to be effective 7/1/2015.
    Filed Date: 6/17/15.
    Accession Number: 20150617-5269.
    Comments Due: 5 p.m. ET 6/29/15.

    Docket Numbers: RP15-1064-000.
    Applicants: Honeoye Storage Corporation.
    Description: Compliance filing per 154.203: Honeoye Storage Corp, 
Pipeline Map Compliance Filing to be effective 8/1/2015.
    Filed Date: 6/18/15.
    Accession Number: 20150618-5050.
    Comments Due: 5 p.m. ET 6/30/15.

    Docket Numbers: RP15-1065-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) rate filing per 154.204: Amendment to Neg 
Rate Agmt (Encana 37663-105) to be effective 6/18/2015.
    Filed Date: 6/18/15.
    Accession Number: 20150618-5079.
    Comments Due: 5 p.m. ET 6/30/15.

    Docket Numbers: CP15-519.
    Applicants: TC Offshore LLC.
    Description: Abbreviated Application to Abandon Part 157 Service 
Rate Schedule X-64 of TC Offshore LLC under CP15-519.
    Filed Date: 6/18/15.
    Accession Number: 20150618-5131.
    Comments Due: 5 p.m. ET 7/9/15.

    Docket Numbers: RP15-1066-000.
    Applicants: Bobcat Gas Storage.
    Description: Sec.  4(d) rate filing per 154.204: Bobcat 2015 
Cleanup Filing to be effective 7/20/2015.
    Filed Date: 6/19/15.
    Accession Number: 20150619-5056.
    Comments Due: 5 p.m. ET 7/1/15.

    Docket Numbers: RP15-1067-000.
    Applicants: Egan Hub Storage, LLC.
    Description: Sec.  4(d) rate filing per 154.204: Egan 2015 Cleanup 
Filing to be effective 7/20/2015.
    Filed Date: 6/19/15.
    Accession Number: 20150619-5057.
    Comments Due: 5 p.m. ET 7/1/15.

    Docket Numbers: RP15-1068-000.
    Applicants: East Tennessee Natural Gas, LLC.
    Description: Sec.  4(d) rate filing per 154.204: ETNG 2015 
Negotiated Rate Cleanup Filing to be effective.
    Filed Date: 6/19/15.
    Accession Number: 20150619-5058.
    Comments Due: 5 p.m. ET 7/1/15.

    Docket Numbers: RP15-1069-000.
    Applicants: Saltville Gas Storage Company L.L.C.
    Description: Sec.  4(d) rate filing per 154.204: SGSC 2015 
Negotiated Rates Cleanup Filing to be effective 7/20/2015.
    Filed Date: 6/19/15.
    Accession Number: 20150619-5059.
    Comments Due: 5 p.m. ET 7/1/15.

    Docket Numbers: RP15-1070-000.
    Applicants: WBI Energy Transmission, Inc.
    Description: Sec.  4(d) rate filing per 154.204: NAESB Revisions to 
be effective 7/20/2015.
    Filed Date: 6/19/15.
    Accession Number: 20150619-5064.
    Comments Due: 5 p.m. ET 7/1/15

    Docket Numbers: RP15-1071-000.
    Applicants: High Point Gas Transmission, LLC.
    Description: Sec.  4(d) rate filing per 154.204: Off-System 
Capacity Filing to be effective 7/23/2015.
    Filed Date: 6/22/15.
    Accession Number: 20150622-5077.
    Comments Due: 5 p.m. ET 7/6/15.

    Docket Numbers: RP15-1072-000.
    Applicants: Natural Gas Pipeline Company of America.
    Description: Sec.  4(d) rate filing per 154.204: BG Energy 
Merchants' Negotiated Rate to be effective 6/23/2015.
    Filed Date: 6/22/15.
    Accession Number: 20150622-5135.
    Comments Due: 5 p.m. ET 7/6/15.

    Docket Numbers: RP15-1073-000.
    Applicants: WBI Energy Transmission, Inc.
    Description: Sec.  4(d) rate filing per 154.204: 2015 Revised Non-
conforming Negotiated SA of Basin Electric to be effective 6/1/2015.
    Filed Date: 6/22/15.
    Accession Number: 20150622-5175.
    Comments Due: 5 p.m. ET 7/6/15.

    Docket Numbers: RP15-584-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Compliance filing per 154.501: Refund Report RP15-584 
to be effective N/A0.
    Filed Date: 6/22/15.
    Accession Number: 20150622-5183.
    Comments Due: 5 p.m. ET 7/6/15.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and Sec.  385.214) on or 
before 5:00 p.m. Eastern time on the specified comment date. Protests 
may be considered, but intervention is necessary to become a party to 
the proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP15-905-001.
    Applicants: Gas Transmission Northwest LLC.
    Description: Compliance filing per 154.203: Compliance to RP15-905-
000. to be effective 6/1/2015.
    Filed Date: 6/18/15.
    Accession Number: 20150618-5034.
    Comments Due: 5 p.m. ET 6/30/15.

    Docket Numbers: RP15-905-001.
    Applicants: Gas Transmission Northwest LLC.
    Description: Compliance filing per 154.203: Compliance to RP15-905-
000. to be effective 6/1/2015.
    Filed Date: 6/18/15.
    Accession Number: 20150618-5034.
    Comments Due: 5 p.m. ET 6/30/15.

    Docket Numbers: RP15-276-001.
    Applicants: MoGas Pipeline LLC.
    Description: Compliance filing per 154.203: MoGas Pipeline LLC 
Compliance Filing to be effective 7/1/2015.
    Filed Date: 6/19/15.
    Accession Number: 20150619-5098.
    Comments Due: 5 p.m. ET 7/1/15.

    Docket Numbers: RP15-23-007.
    Applicants: Transwestern Pipeline Company, LLC.
    Description: Compliance filing per 154.203: RP15-23 Rate Case 
Settlement Agreement to be effective N/A.
    Filed Date: 6/22/15.
    Accession Number: 20150622-5000.
    Comments Due: 5 p.m. ET 7/6/15.

    Docket Numbers: RP15-956-002.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Compliance filing per 154.203: Compliance Filing in 
RP15-596-000., et al. to be effective 5/1/2015.
    Filed Date: 6/23/15.
    Accession Number: 20150623-5029.
    Comments Due: 5 p.m. ET 7/6/15.

    Any person desiring to protest in any of the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system by

[[Page 42097]]

clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 23, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-17440 Filed 7-15-15; 8:45 am]