Sunshine Act Meeting Notice, 41032-41033 [2015-17305]

Download as PDF 41032 Federal Register / Vol. 80, No. 134 / Tuesday, July 14, 2015 / Notices docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 8, 2015. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Note: Items listed on the agenda may be deleted without further notice. Federal Energy Regulatory Commission CONTACT PERSON FOR MORE INFORMATION: Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: July 16, 2015 10 a.m. PLACE: Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: OPEN. MATTERS TO BE CONSIDERED: Agenda. [FR Doc. 2015–17221 Filed 7–13–15; 8:45 am] BILLING CODE 6717–01–P Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 1018TH—MEETING [Regular Meeting—July 16, 2015, 10:00 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 .................... A–2 .................... AD02–7–000 ............................................ AD02–1–000 ............................................ Customer Matters, Reliability, Security and Market Operations. Agency Business Matters. ELECTRIC E–1 E–2 E–3 E–4 E–5 E–6 .................... .................... .................... .................... .................... .................... E–7 .................... E–8 .................... E–9 .................... E–10 .................. E–11 .................. E–12 .................. E–13 .................. E–14 .................. RM15–14–000 ......................................... ER15–1745–000 ...................................... ER12–2170–000 ...................................... ER12–2170–001 ...................................... RM15–3–000 ........................................... OA08–53–005 ......................................... ER15–133–000 ........................................ ER05–1056–008 ...................................... ER14–2553–001, ER14–2553–002 ........ ER14–1469–002 ...................................... OMITTED. OMITTED. EC15–138–000 ........................................ EL15–59–000 .......................................... EL15–57–000 .......................................... Revised Critical Infrastructure Protection Reliability Standards. Midcontinent Independent System Operator, Inc. International Transmission Company. International Transmission Company. Revisions to Public Utility Filing Requirements. Midwest Independent Transmission System Operator, Inc. Midcontinent Independent System Operator, Inc. Chehalis Power Generating, L.P. Southwest Power Pool, Inc. PJM Interconnection, L.L.C. DTE Electric Company and DTE East China, LLC. Navopache Electric Cooperative, Inc. GenOn Energy Management, LLC v. ISO New England Inc. MISCELLANEOUS M–1 .................... RM13–17–002 ......................................... Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission Operators. GAS G–1 .................... G–2 .................... G–3 .................... asabaliauskas on DSK5VPTVN1PROD with NOTICES G–4 G–5 G–6 G–7 .................... .................... .................... .................... RP14–380–001 ........................................ RM96–1–038 ........................................... RP12–498–003 ........................................ RP12–498–004 ........................................ RP12–816–001, RP12–816–002 ............ RP08–426–017, RP12–806–000 ............ PL15–1–001 ............................................ IS12–236–001 ......................................... National Fuel Gas Supply Corporation and Empire Pipeline, Inc. Standards for Business Practices of Interstate Natural Gas Pipelines. Enable Gas Transmission, LLC formerly CenterPoint. Energy Gas Transmission Company, LLC. EL Paso Natural Gas Company, L.L.C. EL Paso Natural Gas Company, L.L.C. Cost Recovery Mechanisms for Modernization of Natural Gas Facilities. Enbridge Energy, Limited Partnership. HYDRO H–1 .................... H–2 .................... P–14245–001 .......................................... P–2197–107 ............................................ KC Hydro LLC of New Hampshire. Alcoa Power Generating Inc. CERTIFICATES C–1 .................... C–2 .................... VerDate Sep<11>2014 CP13–541–000 ........................................ CP15–23–000 .......................................... 19:09 Jul 13, 2015 Jkt 235001 PO 00000 Frm 00042 Floridian Natural Gas Storage Company, LLC. Southern Natural Gas Company, L.L.C. Fmt 4703 Sfmt 4703 E:\FR\FM\14JYN1.SGM 14JYN1 Federal Register / Vol. 80, No. 134 / Tuesday, July 14, 2015 / Notices 41033 1018TH—MEETING—Continued [Regular Meeting—July 16, 2015, 10:00 a.m.] Item No. Docket No. Company C–3 .................... RM12–11–003 ......................................... Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations. Issued: July 9, 2015. Kimberly D. Bose, Secretary. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2015–17305 Filed 7–10–15; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–2129–000] asabaliauskas on DSK5VPTVN1PROD with NOTICES Slate Creek Wind Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Slate Creek Wind Project, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 VerDate Sep<11>2014 19:09 Jul 13, 2015 Jkt 235001 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 28, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 8, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–17222 Filed 7–13–15; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2015–0092; FRL–9930–50– OAR] Notice of Opportunity To Comment on an Analysis of the Greenhouse Gas Emissions Attributable to Production and Transport of Cotton (Gossypium spp.) Seed Oil for Use in Biofuel Production Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) is inviting comment on its analysis of the greenhouse gas (GHG) emissions attributable to the production and transport of Gossypium spp. seed oil (‘‘cottonseed oil’’) feedstock for use in making biofuels such as biodiesel, renewable diesel, and jet fuel. This document explains EPA’s analysis of the feedstock production and transportrelated components of the lifecycle GHG emissions of biofuel made from cottonseed oil, including both direct and indirect agricultural and forestry sector emissions. This notice also describes how EPA may apply this analysis in the future to determine whether biofuels produced from cottonseed oil meet the necessary GHG reductions required for qualification as renewable fuel under the Renewable Fuel Standard program. Based on this analysis, we anticipate that biofuels produced from cottonseed oil could qualify as biomass-based diesel or advanced biofuel if typical fuel production process technologies are used. SUMMARY: Comments must be received on or before August 13, 2015. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– OAR–2015–0092, by one of the following methods: • https://www.regulations.gov. Follow the on-line instructions for submitting comments. • Email: a-and-r-docket@epa.gov, Attention Air and Radiation Docket ID No. EPA–HQ–OAR–2015–0092. • Mail: Air and Radiation Docket, Docket No. EPA–HQ–OAR–2015–0092, Environmental Protection Agency, Mail DATES: E:\FR\FM\14JYN1.SGM 14JYN1

Agencies

[Federal Register Volume 80, Number 134 (Tuesday, July 14, 2015)]
[Notices]
[Pages 41032-41033]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-17305]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: July 16, 2015 10 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: OPEN.

MATTERS TO BE CONSIDERED: Agenda.

    Note: Items listed on the agenda may be deleted without further 
notice.


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.


                             1018th--Meeting
              [Regular Meeting--July 16, 2015, 10:00 a.m.]
------------------------------------------------------------------------
       Item No.           Docket No.                 Company
------------------------------------------------------------------------
                             ADMINISTRATIVE
------------------------------------------------------------------------
A-1..................  AD02-7-000......  Customer Matters, Reliability,
                                          Security and Market
                                          Operations.
A-2..................  AD02-1-000......  Agency Business Matters.
------------------------------------------------------------------------
                                ELECTRIC
------------------------------------------------------------------------
E-1..................  RM15-14-000.....  Revised Critical Infrastructure
                                          Protection Reliability
                                          Standards.
E-2..................  ER15-1745-000...  Midcontinent Independent System
                                          Operator, Inc.
E-3..................  ER12-2170-000...  International Transmission
                                          Company.
E-4..................  ER12-2170-001...  International Transmission
                                          Company.
E-5..................  RM15-3-000......  Revisions to Public Utility
                                          Filing Requirements.
E-6..................  OA08-53-005.....  Midwest Independent
                                          Transmission System Operator,
                                          Inc.
                       ER15-133-000....  Midcontinent Independent System
                                          Operator, Inc.
E-7..................  ER05-1056-008...  Chehalis Power Generating, L.P.
E-8..................  ER14-2553-001,    Southwest Power Pool, Inc.
                        ER14-2553-002.
E-9..................  ER14-1469-002...  PJM Interconnection, L.L.C.
E-10.................  OMITTED.........
E-11.................  OMITTED.........
E-12.................  EC15-138-000....  DTE Electric Company and DTE
                                          East China, LLC.
E-13.................  EL15-59-000.....  Navopache Electric Cooperative,
                                          Inc.
E-14.................  EL15-57-000.....  GenOn Energy Management, LLC v.
                                          ISO New England Inc.
------------------------------------------------------------------------
                              MISCELLANEOUS
------------------------------------------------------------------------
M-1..................  RM13-17-002.....  Communication of Operational
                                          Information Between Natural
                                          Gas Pipelines and Electric
                                          Transmission Operators.
------------------------------------------------------------------------
                                   GAS
------------------------------------------------------------------------
G-1..................  RP14-380-001....  National Fuel Gas Supply
                                          Corporation and Empire
                                          Pipeline, Inc.
G-2..................  RM96-1-038......  Standards for Business
                                          Practices of Interstate
                                          Natural Gas Pipelines.
G-3..................  RP12-498-003....  Enable Gas Transmission, LLC
                                          formerly CenterPoint.
                       RP12-498-004....  Energy Gas Transmission
                                          Company, LLC.
G-4..................  RP12-816-001,     EL Paso Natural Gas Company,
                        RP12-816-002.     L.L.C.
G-5..................  RP08-426-017,     EL Paso Natural Gas Company,
                        RP12-806-000.     L.L.C.
G-6..................  PL15-1-001......  Cost Recovery Mechanisms for
                                          Modernization of Natural Gas
                                          Facilities.
G-7..................  IS12-236-001....  Enbridge Energy, Limited
                                          Partnership.
------------------------------------------------------------------------
                                  HYDRO
------------------------------------------------------------------------
H-1..................  P-14245-001.....  KC Hydro LLC of New Hampshire.
H-2..................  P-2197-107......  Alcoa Power Generating Inc.
------------------------------------------------------------------------
                              CERTIFICATES
------------------------------------------------------------------------
C-1..................  CP13-541-000....  Floridian Natural Gas Storage
                                          Company, LLC.
C-2..................  CP15-23-000.....  Southern Natural Gas Company,
                                          L.L.C.

[[Page 41033]]

 
C-3..................  RM12-11-003.....  Revisions to Auxiliary
                                          Installations, Replacement
                                          Facilities, and Siting and
                                          Maintenance Regulations.
------------------------------------------------------------------------


    Issued: July 9, 2015.
Kimberly D. Bose,
Secretary.
    A free webcast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its webcast. The 
Capitol Connection provides technical support for the free webcasts. It 
also offers access to this event via television in the DC area and via 
phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2015-17305 Filed 7-10-15; 11:15 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.