Combined Notice Of Filings, 40060 [2015-16989]
Download as PDF
40060
Federal Register / Vol. 80, No. 133 / Monday, July 13, 2015 / Notices
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
23). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: July 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16998 Filed 7–10–15; 8:45 am]
BILLING CODE 6717–01–P
asabaliauskas on DSK5VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice Of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP15–1077–000.
VerDate Sep<11>2014
19:27 Jul 10, 2015
Jkt 235001
Applicants: Texas Gas Transmission,
LLC.
Description: § 4(d) rate filing per
154.204: Remove References to Expired
Operating Lease to be effective 4/1/
2015.
Filed Date: 6/24/15.
Accession Number: 20150624–5059.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: RP15–1078–000.
Applicants: Barclays Bank PLC.
Description: Petition for Temporary
Waiver of Commission Capacity Release
Regulations and Related Tariff
Provisions and Request for Expedited
Action of Barclays Bank PLC under
RP15–1078.
Filed Date: 6/24/15.
Accession Number: 20150624–5160.
Comments Due: 5 p.m. ET 7/1/15.
Docket Numbers: RP15–1079–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) rate filing per
154.204: BBPC 2015–07–01 Releases to
EDF Trading to be effective 7/1/2015.
Filed Date: 6/25/15.
Accession Number: 20150625–5022.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: RP15–1080–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) rate filing per
154.204: 20150625 Negotiated Rate to be
effective 7/1/2015.
Filed Date: 6/25/15.
Accession Number: 20150625–5025.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: RP15–1081–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) rate filing per
154.204: 2015 Enserco to Twin Eagle to
be effective 7/1/2015.
Filed Date: 6/25/15.
Accession Number: 20150625–5034.
Comments Due: 5 p.m. ET 7/7/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
Dated: June 25, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16989 Filed 7–10–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–499–000]
Texas Eastern Transmission, LP;
Notice of Intent to Prepare An
Environmental Assessment for the
Proposed South Texas Expansion
Project, And Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the South Texas Expansion Project
(Project) involving construction and
operation of facilities by Texas Eastern
Transmission, LP (Texas Eastern) in
Nueces, Matagorda, Brazoria, Chambers,
and Orange Counties, Texas. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
You can make a difference by providing
us with your specific comments or
concerns about the Project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before July 30,
2015.
If you sent comments on this project
to the Commission before the opening of
this docket on May 22, 2015, you will
need to file those comments in Docket
No. CP15–499–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this Project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a Texas Eastern representative
E:\FR\FM\13JYN1.SGM
13JYN1
Agencies
[Federal Register Volume 80, Number 133 (Monday, July 13, 2015)]
[Notices]
[Page 40060]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-16989]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice Of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP15-1077-000.
Applicants: Texas Gas Transmission, LLC.
Description: Sec. 4(d) rate filing per 154.204: Remove References
to Expired Operating Lease to be effective 4/1/2015.
Filed Date: 6/24/15.
Accession Number: 20150624-5059.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: RP15-1078-000.
Applicants: Barclays Bank PLC.
Description: Petition for Temporary Waiver of Commission Capacity
Release Regulations and Related Tariff Provisions and Request for
Expedited Action of Barclays Bank PLC under RP15-1078.
Filed Date: 6/24/15.
Accession Number: 20150624-5160.
Comments Due: 5 p.m. ET 7/1/15.
Docket Numbers: RP15-1079-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) rate filing per 154.204: BBPC 2015-07-01
Releases to EDF Trading to be effective 7/1/2015.
Filed Date: 6/25/15.
Accession Number: 20150625-5022.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: RP15-1080-000.
Applicants: Northern Natural Gas Company.
Description: Sec. 4(d) rate filing per 154.204: 20150625
Negotiated Rate to be effective 7/1/2015.
Filed Date: 6/25/15.
Accession Number: 20150625-5025.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: RP15-1081-000.
Applicants: Kern River Gas Transmission Company.
Description: Sec. 4(d) rate filing per 154.204: 2015 Enserco to
Twin Eagle to be effective 7/1/2015.
Filed Date: 6/25/15.
Accession Number: 20150625-5034.
Comments Due: 5 p.m. ET 7/7/15.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 25, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-16989 Filed 7-10-15; 8:45 am]
BILLING CODE 6717-01-P