New England Hydropower Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 39094-39095 [2015-16685]

Download as PDF 39094 Federal Register / Vol. 80, No. 130 / Wednesday, July 8, 2015 / Notices process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; including migratory birds; • air quality and noise; • endangered and threatened species; • public safety; and • cumulative impacts. We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. We may publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. srobinson on DSK5SPTVN1PROD with NOTICES Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. VerDate Sep<11>2014 18:49 Jul 07, 2015 Jkt 235001 applicable State Historic Preservation Offices (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPOs as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., C15–495). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502-8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: June 30, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–16682 Filed 7–7–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14550–001] New England Hydropower Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption from Licensing. E:\FR\FM\08JYN1.SGM 08JYN1 srobinson on DSK5SPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 130 / Wednesday, July 8, 2015 / Notices b. Project No.: 14550–001. c. Date filed: June 26, 2015. d. Applicant: New England Hydropower Company, LLC. e. Name of Project: Hanover Pond Dam Hydroelectric Project. f. Location: On the Quinnipiac River, near the city of Meriden, in New Haven County, Connecticut. No federal lands would be occupied by project works or located within the project boundary. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Mr. Michael C. Kerr, New England Hydropower Company, LLC, P.O. Box 5524, Beverly Farms, Massachusetts 01915; (978) 360– 2547, Michael@nehydropower.com. i. FERC Contact: John Ramer, (202) 502–8969, john.ramer@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: August 25, 2015. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14550–001. VerDate Sep<11>2014 18:49 Jul 07, 2015 Jkt 235001 m. The application is not ready for environmental analysis at this time. n. The Hanover Pond Dam Hydroelectric Project would consist of: (1) An existing 25-foot-high, 150-footlong earth embankment dam with four low-level sluice gates and a 250-footlong concrete spillway; (2) the existing approximately 71.0-acre Hanover Pond with a storage capacity of 1,800 acre-feet at a normal operating elevation of about 87.3 feet NGVD29; (3) an existing 175foot-long, 16.0-foot-wide fish ladder; (4) a new 8-foot-high, 12.5-foot-wide hydraulically-powered sluice gate equipped with a new 8-foot-high, 17foot-wide trashrack with 9-inch bar spacing; (5) a new 78-foot-long, 12-footdiameter buried precast concrete penstock; (6) a new 46.5-foot-long, 11.65-foot wide Archimedes screw generator unit, with an installed capacity of 192 kilowatts; (7) a new 12foot-high, 18-foot-long, 16.0-foot-wide concrete powerhouse containing a new gearbox, generator, and electrical controls; (8) a new 15-foot-long, variable-width concrete tailrace; (9) a new 500-foot-long, 35-kilovolt above ground transmission line connecting the powerhouse to Connecticut Light and Power’s distribution system; and (10) appurtenant facilities. The estimated annual generation of the proposed Hanover Pond Dam Project would be about 900 megawatt-hours. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. With this notice, we are initiating consultation with the New Hampshire State Historic Preservation Officer (SHPO), as required by section 106 of the National Historic Preservation Act and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. q. Procedural schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate (e.g., study requests and/ PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 39095 or application deficiencies may lengthen the schedule). Issue Notice of Acceptance/Ready for Environmental Analysis— September 2015 Issue EA/Order—February 2016 Dated: June 30, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–16685 Filed 7–7–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14–22–000] Tennessee Gas Pipeline Company, L.L.C.; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Northeast Energy Direct Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Northeast Energy Direct Project (Project) involving construction and operation of facilities by Tennessee Gas Pipeline Company, L.L.C. (Tennessee Gas) in Pennsylvania, New York, Massachusetts, New Hampshire, and Connecticut. The Commission will use this EIS in its decision-making process to determine whether the Project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the Project. You can make a difference by providing us with your specific comments or concerns about the Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EIS. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC, on or before August 31, 2015. If you sent comments on this project to the Commission before the opening of this docket on September 15, 2014, you will need to file those comments in Docket No. PF14–22–000 to ensure they are considered as part of this proceeding. E:\FR\FM\08JYN1.SGM 08JYN1

Agencies

[Federal Register Volume 80, Number 130 (Wednesday, July 8, 2015)]
[Notices]
[Pages 39094-39095]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-16685]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14550-001]


New England Hydropower Company, LLC; Notice of Application 
Tendered for Filing With the Commission and Soliciting Additional Study 
Requests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption from Licensing.

[[Page 39095]]

    b. Project No.: 14550-001.
    c. Date filed: June 26, 2015.
    d. Applicant: New England Hydropower Company, LLC.
    e. Name of Project: Hanover Pond Dam Hydroelectric Project.
    f. Location: On the Quinnipiac River, near the city of Meriden, in 
New Haven County, Connecticut. No federal lands would be occupied by 
project works or located within the project boundary.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Mr. Michael C. Kerr, New England Hydropower 
Company, LLC, P.O. Box 5524, Beverly Farms, Massachusetts 01915; (978) 
360-2547, Michael@nehydropower.com.
    i. FERC Contact: John Ramer, (202) 502-8969, john.ramer@ferc.gov.
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: August 25, 2015.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-14550-001.
    m. The application is not ready for environmental analysis at this 
time.
    n. The Hanover Pond Dam Hydroelectric Project would consist of: (1) 
An existing 25-foot-high, 150-foot-long earth embankment dam with four 
low-level sluice gates and a 250-foot-long concrete spillway; (2) the 
existing approximately 71.0-acre Hanover Pond with a storage capacity 
of 1,800 acre-feet at a normal operating elevation of about 87.3 feet 
NGVD29; (3) an existing 175-foot-long, 16.0-foot-wide fish ladder; (4) 
a new 8-foot-high, 12.5-foot-wide hydraulically-powered sluice gate 
equipped with a new 8-foot-high, 17-foot-wide trashrack with 9-inch bar 
spacing; (5) a new 78-foot-long, 12-foot-diameter buried precast 
concrete penstock; (6) a new 46.5-foot-long, 11.65-foot wide Archimedes 
screw generator unit, with an installed capacity of 192 kilowatts; (7) 
a new 12-foot-high, 18-foot-long, 16.0-foot-wide concrete powerhouse 
containing a new gearbox, generator, and electrical controls; (8) a new 
15-foot-long, variable-width concrete tailrace; (9) a new 500-foot-
long, 35-kilovolt above ground transmission line connecting the 
powerhouse to Connecticut Light and Power's distribution system; and 
(10) appurtenant facilities. The estimated annual generation of the 
proposed Hanover Pond Dam Project would be about 900 megawatt-hours.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. With this notice, we are initiating consultation with the New 
Hampshire State Historic Preservation Officer (SHPO), as required by 
section 106 of the National Historic Preservation Act and the 
regulations of the Advisory Council on Historic Preservation, 36 CFR 
800.4.
    q. Procedural schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate (e.g., study requests and/or application 
deficiencies may lengthen the schedule).
    Issue Notice of Acceptance/Ready for Environmental Analysis--
September 2015
    Issue EA/Order--February 2016

    Dated: June 30, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-16685 Filed 7-7-15; 8:45 am]
 BILLING CODE 6717-01-P