New England Hydropower Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 39094-39095 [2015-16685]
Download as PDF
39094
Federal Register / Vol. 80, No. 130 / Wednesday, July 8, 2015 / Notices
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife; including
migratory birds;
• air quality and noise;
• endangered and threatened species;
• public safety; and
• cumulative impacts.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. We may publish and distribute
the EA to the public for an allotted
comment period. We will consider all
comments on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
srobinson on DSK5SPTVN1PROD with NOTICES
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
VerDate Sep<11>2014
18:49 Jul 07, 2015
Jkt 235001
applicable State Historic Preservation
Offices (SHPO), and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 We will
define the project-specific Area of
Potential Effects (APE) in consultation
with the SHPOs as the project develops.
On natural gas facility projects, the APE
at a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., C15–495). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502-8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: June 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16682 Filed 7–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14550–001]
New England Hydropower Company,
LLC; Notice of Application Tendered
for Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
E:\FR\FM\08JYN1.SGM
08JYN1
srobinson on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 130 / Wednesday, July 8, 2015 / Notices
b. Project No.: 14550–001.
c. Date filed: June 26, 2015.
d. Applicant: New England
Hydropower Company, LLC.
e. Name of Project: Hanover Pond
Dam Hydroelectric Project.
f. Location: On the Quinnipiac River,
near the city of Meriden, in New Haven
County, Connecticut. No federal lands
would be occupied by project works or
located within the project boundary.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Mr. Michael C.
Kerr, New England Hydropower
Company, LLC, P.O. Box 5524, Beverly
Farms, Massachusetts 01915; (978) 360–
2547, Michael@nehydropower.com.
i. FERC Contact: John Ramer, (202)
502–8969, john.ramer@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 25, 2015.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–14550–001.
VerDate Sep<11>2014
18:49 Jul 07, 2015
Jkt 235001
m. The application is not ready for
environmental analysis at this time.
n. The Hanover Pond Dam
Hydroelectric Project would consist of:
(1) An existing 25-foot-high, 150-footlong earth embankment dam with four
low-level sluice gates and a 250-footlong concrete spillway; (2) the existing
approximately 71.0-acre Hanover Pond
with a storage capacity of 1,800 acre-feet
at a normal operating elevation of about
87.3 feet NGVD29; (3) an existing 175foot-long, 16.0-foot-wide fish ladder; (4)
a new 8-foot-high, 12.5-foot-wide
hydraulically-powered sluice gate
equipped with a new 8-foot-high, 17foot-wide trashrack with 9-inch bar
spacing; (5) a new 78-foot-long, 12-footdiameter buried precast concrete
penstock; (6) a new 46.5-foot-long,
11.65-foot wide Archimedes screw
generator unit, with an installed
capacity of 192 kilowatts; (7) a new 12foot-high, 18-foot-long, 16.0-foot-wide
concrete powerhouse containing a new
gearbox, generator, and electrical
controls; (8) a new 15-foot-long,
variable-width concrete tailrace; (9) a
new 500-foot-long, 35-kilovolt above
ground transmission line connecting the
powerhouse to Connecticut Light and
Power’s distribution system; and (10)
appurtenant facilities. The estimated
annual generation of the proposed
Hanover Pond Dam Project would be
about 900 megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the New Hampshire
State Historic Preservation Officer
(SHPO), as required by section 106 of
the National Historic Preservation Act
and the regulations of the Advisory
Council on Historic Preservation, 36
CFR 800.4.
q. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate (e.g., study requests and/
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
39095
or application deficiencies may
lengthen the schedule).
Issue Notice of Acceptance/Ready for
Environmental Analysis—
September 2015
Issue EA/Order—February 2016
Dated: June 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16685 Filed 7–7–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF14–22–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Intent To Prepare an
Environmental Impact Statement for
the Planned Northeast Energy Direct
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meetings
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Northeast Energy Direct
Project (Project) involving construction
and operation of facilities by Tennessee
Gas Pipeline Company, L.L.C.
(Tennessee Gas) in Pennsylvania, New
York, Massachusetts, New Hampshire,
and Connecticut. The Commission will
use this EIS in its decision-making
process to determine whether the
Project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
You can make a difference by providing
us with your specific comments or
concerns about the Project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EIS. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC, on or before August
31, 2015.
If you sent comments on this project
to the Commission before the opening of
this docket on September 15, 2014, you
will need to file those comments in
Docket No. PF14–22–000 to ensure they
are considered as part of this
proceeding.
E:\FR\FM\08JYN1.SGM
08JYN1
Agencies
[Federal Register Volume 80, Number 130 (Wednesday, July 8, 2015)]
[Notices]
[Pages 39094-39095]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-16685]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14550-001]
New England Hydropower Company, LLC; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
[[Page 39095]]
b. Project No.: 14550-001.
c. Date filed: June 26, 2015.
d. Applicant: New England Hydropower Company, LLC.
e. Name of Project: Hanover Pond Dam Hydroelectric Project.
f. Location: On the Quinnipiac River, near the city of Meriden, in
New Haven County, Connecticut. No federal lands would be occupied by
project works or located within the project boundary.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Mr. Michael C. Kerr, New England Hydropower
Company, LLC, P.O. Box 5524, Beverly Farms, Massachusetts 01915; (978)
360-2547, Michael@nehydropower.com.
i. FERC Contact: John Ramer, (202) 502-8969, john.ramer@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: August 25, 2015.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-14550-001.
m. The application is not ready for environmental analysis at this
time.
n. The Hanover Pond Dam Hydroelectric Project would consist of: (1)
An existing 25-foot-high, 150-foot-long earth embankment dam with four
low-level sluice gates and a 250-foot-long concrete spillway; (2) the
existing approximately 71.0-acre Hanover Pond with a storage capacity
of 1,800 acre-feet at a normal operating elevation of about 87.3 feet
NGVD29; (3) an existing 175-foot-long, 16.0-foot-wide fish ladder; (4)
a new 8-foot-high, 12.5-foot-wide hydraulically-powered sluice gate
equipped with a new 8-foot-high, 17-foot-wide trashrack with 9-inch bar
spacing; (5) a new 78-foot-long, 12-foot-diameter buried precast
concrete penstock; (6) a new 46.5-foot-long, 11.65-foot wide Archimedes
screw generator unit, with an installed capacity of 192 kilowatts; (7)
a new 12-foot-high, 18-foot-long, 16.0-foot-wide concrete powerhouse
containing a new gearbox, generator, and electrical controls; (8) a new
15-foot-long, variable-width concrete tailrace; (9) a new 500-foot-
long, 35-kilovolt above ground transmission line connecting the
powerhouse to Connecticut Light and Power's distribution system; and
(10) appurtenant facilities. The estimated annual generation of the
proposed Hanover Pond Dam Project would be about 900 megawatt-hours.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are initiating consultation with the New
Hampshire State Historic Preservation Officer (SHPO), as required by
section 106 of the National Historic Preservation Act and the
regulations of the Advisory Council on Historic Preservation, 36 CFR
800.4.
q. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate (e.g., study requests and/or application
deficiencies may lengthen the schedule).
Issue Notice of Acceptance/Ready for Environmental Analysis--
September 2015
Issue EA/Order--February 2016
Dated: June 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-16685 Filed 7-7-15; 8:45 am]
BILLING CODE 6717-01-P