Docket Numbers: ER15–1941–000;
ER15–1942–000.
Applicants: Barclays Bank PLC,
Barclays Capital Energy Inc.
Description: Amendment to June 16,
2015 Notice of Cancellation of Market
Based Rate Tariff of Barclays Bank PLC
and Barclays Capital Energy Inc.
Filed Date: 6/23/15.
Accession Number: 20150623–5127.
Comments Due: 5 p.m. ET 7/8/15.
Docket Numbers: ER15–1971–000.
Applicants: Roctop Investments, Inc.
Description: Initial rate filing per
35.12 Baseline New to be effective 7/1/
2015.
Filed Date: 6/23/15.
Accession Number: 20150623–5146.
Comments Due: 5 p.m. ET 7/14/15.
Docket Numbers: ER15–1972–000.
Applicants: Indeck Corinth Limited
Partnership.
Description: Initial rate filing per
35.12 Baseline New to be effective 7/1/
2015.
Filed Date: 6/23/15.
Accession Number: 20150623–5168.
Comments Due: 5 p.m. ET 7/14/15.
Docket Numbers: ER15–1973–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): 1518R9 Arkansas
Electric Cooperative Corp NITSA NOA
to be effective 6/1/2015.
Filed Date: 6/24/15.
Accession Number: 20150624–5029.
Comments Due: 5 p.m. ET 7/15/15.
Docket Numbers: ER15–1974–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): 2158R5 Arkansas
Electric Cooperative Corp NITSA and
NOA to be effective 6/1/2015.
Filed Date: 6/24/15.
Accession Number: 20150624–5037.
Comments Due: 5 p.m. ET 7/15/15.
Docket Numbers: ER15–1975–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Service Agreement
No. 4180; Queue AA1–065 to be
effective 5/29/2015.
Filed Date: 6/24/15.
Accession Number: 20150624–5038.
Comments Due: 5 p.m. ET 7/15/15.
Docket Numbers: ER15–1976–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): East River Electric
Power Cooperative Formula Rate to be
effective 10/1/2015.
Filed Date: 6/24/15.
Accession Number: 20150624–5058.
VerDate Sep<11>2014
21:16 Jul 01, 2015
Jkt 235001
Comments Due: 5 p.m. ET 7/15/15.
DEPARTMENT OF ENERGY
Docket Numbers: ER15–1977–000.
Applicants: Sunbury Energy, LLC.
Description: Notice of Cancellation of
Market Based Rate Tariff of Sunbury
Energy, LLC.
Filed Date: 6/24/15.
Accession Number: 20150624–5070.
Comments Due: 5 p.m. ET 7/15/15.
Federal Energy Regulatory
Commission
Docket Numbers: ER15–1978–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Service Agreement
No. 4185; Queue AA2–184 to be
effective 5/26/2015.
Filed Date: 6/24/15.
Accession Number: 20150624–5074.
Comments Due: 5 p.m. ET 7/15/15.
With respect to orders issued by the
Commission on August 5, 2013 and May
15, 2014 in the above-captioned docket,
with the exceptions noted below, the
staff of the Office of Enforcement are
designated as non-decisional in
deliberations by the Commission in this
docket. Accordingly, pursuant to 18
CFR 385.2202 (2014), they will not serve
as advisors to the Commission or take
part in the Commission’s review of any
offer of settlement. Likewise, as nondecisional staff, pursuant to 18 CFR
385.2201 (2014), they are prohibited
from communicating with advisory staff
concerning any deliberations in this
docket.
Exceptions to this designation as nondecisional are:
Docket Numbers: ER15–1979–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Withdrawal per
35.15: Cancellation of Service
Agreement Nos. 3685, 3667, 3629, 3751,
2706, 3768 to be effective 7/29/2014.
Filed Date: 6/24/15.
Accession Number: 20150624–5122.
Comments Due: 5 p.m. ET 7/15/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16305 Filed 7–1–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
[Docket No., IN13–15–000]
BP America Inc., BP Corporation North
America Inc., BP America Production
Company, and BP Energy Company;
Notice of Designation of Commission
Staff as Non-Decisional
James Owens
Timothy Helwick
Shawn Bennett
Jill Davis
Sebastian Krynski
Grace Kwon
Dated: June 25, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16303 Filed 7–1–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP15–517–000 PF15–4–000]
Gulf South Pipeline Company, LP;
Notice of Application
Take notice that on June 12, 2015,
Gulf South Pipeline Company, LP (Gulf
South), 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) requesting
authorization to construct and operate
its 1.42 Billion cubic feet per day
Coastal Bend Header Project.
Specifically, Gulf South proposes to
construct: (i) a new 66-mile, 36-inch
diameter pipeline lateral from Wharton
County, Texas to Freeport LNG
Development, LP’s (Freeport LNG)
terminal in Brazoria County, Texas; (ii)
E:\FR\FM\02JYN1.SGM
02JYN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 127 / Thursday, July 2, 2015 / Notices
the new 83,597 horsepower (HP) Wilson
Compressor Station (CS) in Wharton
County, Texas; (iii) the new 26,400 HP
Brazos CS in Fort Bend County, Texas;
(iv) the new 10,700 HP North Houston
CS in Harris County, Texas; (v) piping
modifications at Goodrich CS in Polk
County, Texas to allow for bi-directional
flow; and (vi) additional 15,748 HP and
modifications to allow for bi-directional
flow at Magasco CS site in Sabine
County, Texas. Gulf South estimates the
cost of the Coastal Bend Header Project
to be $690,357,089, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing is available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application may be directed to J. Kyle
Stephens, Vice President of Regulatory
Affairs, Gulf South Pipeline Company,
LP, 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, by telephone at
(713) 479–8252, or by email to
kyle.stephens@bwpmlp.com.
On November 5, 2014, the
Commission staff granted Gulf South’s
request to utilize the Pre-Filing Process
and assigned Docket No. PF15–4–000 to
staff activities involved in the Coastal
Bend Header Project. Now, as of the
filing of the June 12, 2015 application,
the Pre-Filing Process for this project
has ended. From this time forward, this
proceeding will be conducted in Docket
No. CP15–517–000, as noted in the
caption of this Notice.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
VerDate Sep<11>2014
21:16 Jul 01, 2015
Jkt 235001
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
five copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
38193
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and five copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on July 16, 2015.
Dated: June 25, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–16300 Filed 7–1–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulation
Commission
[Docket No. CP15–518–000]
Freeport LNG Development, L.P., FLNG
Liquefaction, LLC., FLNG Liquefaction
2, LLC. and FLNG Liquefaction 3, LLC.;
Notice of Application To Amend
Aurhtorization Under Section 3 of the
Natural Gas Act
Take notice that on June 15, 2015
Freeport LNG Development, L.P., FLNG
Liquefaction, LLC, FLNG Liquefaction 2,
LLC, and FLNG Liquefaction 3, LLC
(collectively Freeport LNG), 333 Clay
Street, Suite 5050, Houston, TX 77002,
filed in Docket No. CP15–518–000, an
application pursuant to section 3(a) of
the Natural Gas Act (NGA), and Part 153
of the Commission’s Regulations, to
amend the authorizations granted on
July 30, 2014 in Docket Nos. CP12–509–
000 and CP12–29–000. Freeport LNG
seeks authorization from the
Commission to increase the total
liquefied natural gas production
capacity of its Liquefaction Project from
the currently authorized 1.8 billion
cubic feet (Bcf) per day (657 Bcf per
year) to 2.14 Bcf per day (782 Bcf per
year). No new facilities are proposed, all
as more full set forth in the application
which is on file with the Commission
and open to public inspection.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number filed to access the
document. It is also available for review
in the Commission’s Public Reference
Room in Washington, DC. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 80, Number 127 (Thursday, July 2, 2015)]
[Notices]
[Pages 38192-38193]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-16300]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP15-517-000 PF15-4-000]
Gulf South Pipeline Company, LP; Notice of Application
Take notice that on June 12, 2015, Gulf South Pipeline Company, LP
(Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed
an application pursuant to section 7(c) of the Natural Gas Act (NGA)
requesting authorization to construct and operate its 1.42 Billion
cubic feet per day Coastal Bend Header Project. Specifically, Gulf
South proposes to construct: (i) a new 66-mile, 36-inch diameter
pipeline lateral from Wharton County, Texas to Freeport LNG
Development, LP's (Freeport LNG) terminal in Brazoria County, Texas;
(ii)
[[Page 38193]]
the new 83,597 horsepower (HP) Wilson Compressor Station (CS) in
Wharton County, Texas; (iii) the new 26,400 HP Brazos CS in Fort Bend
County, Texas; (iv) the new 10,700 HP North Houston CS in Harris
County, Texas; (v) piping modifications at Goodrich CS in Polk County,
Texas to allow for bi-directional flow; and (vi) additional 15,748 HP
and modifications to allow for bi-directional flow at Magasco CS site
in Sabine County, Texas. Gulf South estimates the cost of the Coastal
Bend Header Project to be $690,357,089, all as more fully set forth in
the application which is on file with the Commission and open to public
inspection. The filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application may be directed to J. Kyle
Stephens, Vice President of Regulatory Affairs, Gulf South Pipeline
Company, LP, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, by
telephone at (713) 479-8252, or by email to kyle.stephens@bwpmlp.com.
On November 5, 2014, the Commission staff granted Gulf South's
request to utilize the Pre-Filing Process and assigned Docket No. PF15-
4-000 to staff activities involved in the Coastal Bend Header Project.
Now, as of the filing of the June 12, 2015 application, the Pre-Filing
Process for this project has ended. From this time forward, this
proceeding will be conducted in Docket No. CP15-517-000, as noted in
the caption of this Notice.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit five copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and five copies of the protest or intervention to
the Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on July 16, 2015.
Dated: June 25, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-16300 Filed 7-1-15; 8:45 am]