El Paso Natural Gas Company, L.L.C.; Notice of Application, 36984-36985 [2015-15871]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 36984 Federal Register / Vol. 80, No. 124 / Monday, June 29, 2015 / Notices Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–031; ER14–630–008; ER10–2326–029; ER10– 2330–030. Applicants: J.P. Morgan Ventures Energy Corporation, AlphaGen Power LLC, Cedar Brakes I, L.L.C., Utility Contract Funding, L.L.C. Description: Updated market power analysis for the Central Region of the JPMorgan Sellers. Filed Date: 6/23/15. Accession Number: 20150623–5061. Comments Due: 5 p.m. ET 8/24/15. Docket Numbers: ER13–1371–001. Applicants: GP Big Island, LLC. Description: Compliance filing per 35: compliance to 8202016 to be effective 6/ 24/2015. Filed Date: 6/23/15. Accession Number: 20150623–5007. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER13–1923–002. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing per 35: 2015–06–22_MISO_SERTP Order 1000 Compliance to be effective 1/1/2015. Filed Date: 6/22/15. Accession Number: 20150622–5185. Comments Due: 5 p.m. ET 7/13/15. Docket Numbers: ER15–1841–001. Applicants: Panda Liberty LLC. Description: Tariff Amendment per 35.17(b): Supplement to Market-Based Rate Application to be effective 7/17/ 2015. Filed Date: 6/22/15. Accession Number: 20150622–5195. Comments Due: 5 p.m. ET 7/13/15. Docket Numbers: ER15–1905–001. Applicants: AZ721 LLC. Description: Tariff Amendment per 35.17(b): Amendment to Market Based Rate to be effective 8/11/2015. Filed Date: 6/22/15. Accession Number: 20150622–5177. Comments Due: 5 p.m. ET 7/13/15. Docket Numbers: ER15–1961–000. Applicants: L’Anse Warden Electric Company. Description: Tariff Withdrawal per 35.15: Notice of Cancellation to be effective 6/23/2015. Filed Date: 6/22/15. Accession Number: 20150622–5188. Comments Due: 5 p.m. ET 7/13/15. Docket Numbers: ER15–1962–000. Applicants: 67RK 8me LLC. Description: Initial rate filing per 35.12 SFA to be effective 7/16/2015. Filed Date: 6/22/15. Accession Number: 20150622–5194. Comments Due: 5 p.m. ET 7/13/15. Docket Numbers: ER15–1963–000. VerDate Sep<11>2014 17:13 Jun 26, 2015 Jkt 235001 Applicants: 65HK 8me LLC. Description: Initial rate filing per 35.12 SFA to be effective 7/16/2015. Filed Date: 6/22/15. Accession Number: 20150622–5199. Comments Due: 5 p.m. ET 7/13/15. Docket Numbers: ER15–1964–000. Applicants: 87RL 8me LLC. Description: Initial rate filing per 35.12 SFA to be effective 7/16/2015. Filed Date: 6/23/15. Accession Number: 20150623–5001. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER15–1965–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): 1276R8 KCP&L NITSA NOA and Cancellation of 1765R11 KCPL–GMO to be effective 6/ 1/2015. Filed Date: 6/23/15. Accession Number: 20150623–5039. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER15–1966–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Revisions to OATT Att K-Appendix and OA Schedule 1 re Lost Opportunity Cost to be effective 9/ 1/2015. Filed Date: 6/23/15. Accession Number: 20150623–5102. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER15–1967–000. Applicants: Renaissance Power, L.L.C. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Reactive Rate Filing to be effective 1/21/2015. Filed Date: 6/23/15. Accession Number: 20150623–5106. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER15–1968–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): 2015–06–23_SA 2707 NSP-Odell Wind Farm 2nd Rev GIA (G826) to be effective 6/24/2015. Filed Date: 6/23/15. Accession Number: 20150623–5111. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER15–1969–000. Applicants: NorthWestern Corporation. Description: Section 205(d) rate filing per 35.13(a)(2)(iii): Revised Rate Schedule 188—Colstrip 1 and 2 Transmission Agreement to be effective 9/1/2015. Filed Date: 6/23/15. Accession Number: 20150623–5112. Comments Due: 5 p.m. ET 7/14/15. Docket Numbers: ER15–1970–000. Applicants: San Diego Gas & Electric Company. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Description: Initial rate filing per 35.12 System Impact Study Agreement, Service Agreement No. 51 to be effective 6/24/2015. Filed Date: 6/23/15. Accession Number: 20150623–5133. Comments Due: 5 p.m. ET 7/14/15. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES15–37–000. Applicants: Michigan Electric Transmission Company, LLC. Description: Application under Section 204 of Michigan Electric Transmission Company, LLC. Filed Date: 6/22/15. Accession Number: 20150622–5200. Comments Due: 5 p.m. ET 7/13/15. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 23, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–15869 Filed 6–26–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–516–000] El Paso Natural Gas Company, L.L.C.; Notice of Application Take notice that on June 11, 2015, El Paso Natural Gas Company, L.L.C. (El Paso), filed an application pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s Regulations, for a certificate of public convenience and necessity to increase the certificated maximum reservoir pressure at its Washington Ranch Storage Field, located in Eddy County, New Mexico. This proposed higher E:\FR\FM\29JNN1.SGM 29JNN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 80, No. 124 / Monday, June 29, 2015 / Notices pressure will increase operational flexibility and allow El Paso to more fully use the existing certificated capacity of Washington Ranch. Further, El Paso is not proposing to change any other certificated physical parameters of its storage field and this proposal will not require any physical modifications to the Washington Ranch storage field facilities. The filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Francisco Tarin, Director, Regulatory Affairs Department, El Paso Natural Gas Company, L.L.C., P.O. Box 1087, Colorado Springs, Colorado 90944, call at (719) 667–7517, or email EPNGregulatoryaffairs@elpaso.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and VerDate Sep<11>2014 17:13 Jun 26, 2015 Jkt 235001 by all other parties. A party must submit 5 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: July 13, 2015. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of NorthWestern Corporation, Deseret Generation & Transmission Cooperative, Inc., Portland General Electric Company, Idaho Power Company, and PacifiCorp: Northern Tier Transmission Group Quarter 6 Stakeholder Meeting June 30, 2015, 10:30 a.m.–2:30 p.m. (MDT) The above-referenced meeting will be held at: Boise Airport Conference Center, 3201 Airport Way #1000, Boise, ID 83705. The above-referenced meeting is open to stakeholders. Further information may be found at https://www.nttg.biz/site/. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER13–1448, NorthWestern Corporation Docket No. ER13–1457, Deseret Generation & Transmission Cooperative, Inc. Docket No. ER13–1463, Portland General Electric Company Docket No. ER13–1467, Idaho Power Company Docket No. ER13–1473, PacifiCorp For more information, contact Natalie Propst, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–8896 or natalie.propst@ferc.gov. Dated: June 23, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–15873 Filed 6–26–15; 8:45 am] BILLING CODE 6717–01–P Dated: June 22, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–15871 Filed 6–26–15; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 9990 36985 E:\FR\FM\29JNN1.SGM 29JNN1

Agencies

[Federal Register Volume 80, Number 124 (Monday, June 29, 2015)]
[Notices]
[Pages 36984-36985]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15871]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-516-000]


El Paso Natural Gas Company, L.L.C.; Notice of Application

    Take notice that on June 11, 2015, El Paso Natural Gas Company, 
L.L.C. (El Paso), filed an application pursuant to section 7(c) of the 
Natural Gas Act (NGA) and Part 157 of the Commission's Regulations, for 
a certificate of public convenience and necessity to increase the 
certificated maximum reservoir pressure at its Washington Ranch Storage 
Field, located in Eddy County, New Mexico. This proposed higher

[[Page 36985]]

pressure will increase operational flexibility and allow El Paso to 
more fully use the existing certificated capacity of Washington Ranch. 
Further, El Paso is not proposing to change any other certificated 
physical parameters of its storage field and this proposal will not 
require any physical modifications to the Washington Ranch storage 
field facilities. The filing may be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Francisco Tarin, Director, Regulatory Affairs Department, El Paso 
Natural Gas Company, L.L.C., P.O. Box 1087, Colorado Springs, Colorado 
90944, call at (719) 667-7517, or email 
EPNGregulatoryaffairs@elpaso.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the Internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: July 13, 2015.

    Dated: June 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15871 Filed 6-26-15; 8:45 am]
BILLING CODE 6717-01-P