Pershing County Water Conservation District, Nevada; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 36329-36330 [2015-15493]
Download as PDF
Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices
36329
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity..
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit..
The facility has an installed capacity that does not exceed 5 megawatts. ....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA..
Y
FPA 30(a)(3)(C)(i), as amended by HREA
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
1 18
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–18) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15491 Filed 6–23–15; 8:45 am]
BILLING CODE 6717–01–P
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
16:43 Jun 23, 2015
Jkt 235001
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Y
Y
Y
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14327–004]
Pershing County Water Conservation
District, Nevada; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
License.
b. Project No.: 14327–004.
c. Date Filed: June 4, 2015.
d. Licensee: Pershing County Water
Conservation District, Nevada.
e. Name of Project: Humboldt River
Hydropower Project.
f. Location: The unconstructed project
would be located at the U.S. Department
of the Interior, Bureau of Reclamation’s
Rye Patch Dam, on the Humboldt River
in Pershing County, Nevada. The project
would occupy 0.25 acre of federal land.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Mr. Bennie
Hodges, Manager, Pershing County
Water Conservation District, P.O. Box
218, Lovelock, NV 89419, Telephone:
(775) 273–2293, Email:
pcwcd@irrigation.lovelock.nv.us.
i. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
j. Deadline for filing comments,
interventions and protests is 30 days
from the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
E:\FR\FM\24JNN1.SGM
24JNN1
tkelley on DSK3SPTVN1PROD with NOTICES
36330
Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14327–004.
k. Description of Project Facilities:
The unconstructed project works would
consist of (1) an 18-foot by 18-foot
powerhouse to be located in an existing
parking area immediately downstream
of the dam on the west side of the
spillway; (2) a new 750-kilowatt
generator to be installed within the
powerhouse and connected to a new
Kaplan turbine via a driveshaft; (3) the
Kaplan turbine which would be
installed outside of the powerhouse and
connected to an existing 48-inchdiameter steel discharge pipe; (4) a
second existing 48-inch-diameter steel
pipe that would be used to bypass flow
past the turbine; (5) a new 24.9-kilovolt,
9,360-foot-long primary transmission
line; and (6) appurtenant facilities.
l. Description of Proceeding: On June
4, 2015, Pershing County Water
Conservation District, Nevada filed a
request to surrender their license for the
unconstructed project stating that due to
the current drought in the western
United States, the project is not feasible
at this time.
m. This filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
VerDate Sep<11>2014
16:43 Jun 23, 2015
Jkt 235001
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15493 Filed 6–23–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice Of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG15–97–000.
Applicants: Route 66 Wind Power,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Route 66 Wind
Power, LLC.
Filed Date: 6/17/15.
Accession Number: 20150617–5235.
Comments Due: 5 p.m. ET 7/8/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1937–000.
Applicants: PJM Interconnection,
L.L.C., Old Dominion Electric
Cooperative.
Description: § 205(d) Rate Filing:
Second Revised Service Agreement No.
3746—NITSA between PJM and ODEC
to be effective 6/1/2015.
Filed Date: 6/17/15.
Accession Number: 20150617–5248.
Comments Due: 5 p.m. ET 7/8/15.
Docket Numbers: ER15–1938–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA Service Agreement No.
4183; Queue No. Z2–105 to be effective
10/31/2014.
Filed Date: 6/17/15.
Accession Number: 20150617–5266.
Comments Due: 5 p.m. ET 7/8/15.
Docket Numbers: ER15–1939–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3050
Sunwind Energy Group GIA to be
effective 6/3/2015.
Filed Date: 6/17/15.
Accession Number: 20150617–5267.
Comments Due: 5 p.m. ET 7/8/15.
Docket Numbers: ER15–1940–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Service Agreement No. 4184; Queue No.
Z2–106 to be effective 10/31/2014.
Filed Date: 6/17/15.
Accession Number: 20150617–5268.
Comments Due: 5 p.m. ET 7/8/15.
Docket Numbers: ER15–1941–000.
Applicants: Barclays Bank PLC.
Description: Notice of Cancellation of
Market Based Rate Tariff of Barclays
Bank PLC.
Filed Date: 6/17/15.
E:\FR\FM\24JNN1.SGM
24JNN1
Agencies
[Federal Register Volume 80, Number 121 (Wednesday, June 24, 2015)]
[Notices]
[Pages 36329-36330]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15493]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14327-004]
Pershing County Water Conservation District, Nevada; Notice of
Application Accepted for Filing, Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Surrender of License.
b. Project No.: 14327-004.
c. Date Filed: June 4, 2015.
d. Licensee: Pershing County Water Conservation District, Nevada.
e. Name of Project: Humboldt River Hydropower Project.
f. Location: The unconstructed project would be located at the U.S.
Department of the Interior, Bureau of Reclamation's Rye Patch Dam, on
the Humboldt River in Pershing County, Nevada. The project would occupy
0.25 acre of federal land.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Mr. Bennie Hodges, Manager, Pershing County
Water Conservation District, P.O. Box 218, Lovelock, NV 89419,
Telephone: (775) 273-2293, Email: pcwcd@irrigation.lovelock.nv.us.
i. FERC Contact: Mr. Ashish Desai, (202) 502-8370,
Ashish.Desai@ferc.gov.
j. Deadline for filing comments, interventions and protests is 30
days from the issuance date of this notice. The Commission strongly
encourages electronic filing. Please file motions to intervene,
protests and comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your
[[Page 36330]]
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14327-004.
k. Description of Project Facilities: The unconstructed project
works would consist of (1) an 18-foot by 18-foot powerhouse to be
located in an existing parking area immediately downstream of the dam
on the west side of the spillway; (2) a new 750-kilowatt generator to
be installed within the powerhouse and connected to a new Kaplan
turbine via a driveshaft; (3) the Kaplan turbine which would be
installed outside of the powerhouse and connected to an existing 48-
inch-diameter steel discharge pipe; (4) a second existing 48-inch-
diameter steel pipe that would be used to bypass flow past the turbine;
(5) a new 24.9-kilovolt, 9,360-foot-long primary transmission line; and
(6) appurtenant facilities.
l. Description of Proceeding: On June 4, 2015, Pershing County
Water Conservation District, Nevada filed a request to surrender their
license for the unconstructed project stating that due to the current
drought in the western United States, the project is not feasible at
this time.
m. This filing may be viewed on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
excluding the last three digits in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction in the Commission's Public Reference Room located at 888
First Street NE., Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.212 and .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15493 Filed 6-23-15; 8:45 am]