Soldier Canyon Filter Plant; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 36328-36329 [2015-15491]
Download as PDF
36328
Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices
Filed Date: 6/1/15.
Accession Number: 20150601–5402.
Comments Due: 5 p.m. ET 6/19/15.
Docket Numbers: RP15–1052–001.
Applicants: Discovery Gas
Transmission LLC.
Description: Compliance filing per
154.203: Substitute Order No. 801
Compliance filing (System Map
Migration to Web site) to be effective 7/
9/2015.
Filed Date: 6/15/15.
Accession Number: 20150615–5128.
Comments Due: 5 p.m. ET 6/29/15.
Docket Numbers: RP15–1053–001.
Applicants: Black Marlin Pipeline
Company.
Description: Compliance filing per
154.203: Substitute Order No. 801
Compliance Filing (System Map
Migration to Web site) to be effective 7/
9/2015.
Filed Date: 6/15/15.
Accession Number: 20150615–5226.
Comments Due: 5 p.m. ET 6/29/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 16, 2015.
Kimberly D. Bose,
Secretary.
for the continued operation of the 1.1megawatt Wallowa Falls Hydroelectric
Project (Wallowa Falls Project) No. 308.
On February 10, 2015, PacifiCorp filed
an updated application that included
modifications to its proposed action. On
March 6, 2015, the Commission issued
a Notice of Application Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions (REA
Notice). The REA notice included a
procedural schedule that included
preparation of a single Environmental
Assessment (EA).
Based on the comments received in
response to the REA notice, Commission
staff has determined that its analysis of
the proposed relicensing action will
require preparation of a Draft and Final
EA. A Draft EA will be issued and
circulated for review by all interested
parties. All comments filed on the Draft
EA will be analyzed by staff and
considered in the Final EA. Staff’s
conclusions and recommendations will
be available for the Commission’s
consideration in reaching its final
licensing decision.
The application will be processed
according to the following revised
procedural schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Issue Draft EA ...........
Comments on Draft
EA due.
Modified terms and
conditions due.
Commission issues
Final EA.
Target date
November 2015.
December 2015.
January 2016.
April 2016.
[FR Doc. 2015–15486 Filed 6–23–15; 8:45 am]
Any questions regarding this notice
may be directed to Matt Cutlip at (503)
552–2762, or by email at matt.cutlip@
ferc.gov.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[Project No. 308–007]
[FR Doc. 2015–15490 Filed 6–23–15; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES
PacifiCorp Energy; Notice of Intent To
Prepare a Draft and Final
Environmental Assessment and
Revised Procedural Schedule
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–18–000]
Soldier Canyon Filter Plant; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On January 23, 2015, Soldier Canyon
Filter Plant filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Soldier
Canyon Micro Hydro Facility would
have an installed capacity of 100
kilowatts (kW), and would be located
along the existing 36-inch-diameter
Soldier Canyon Pipeline at the Soldier
Canyon Filter Plant. The project would
be located near Fort Collins in Larimer
County, Colorado.
Applicant Contact: Mr. Chris Harris,
General Manager, 4424 Laporte Avenue,
Fort Collins, CO 80521, Phone No. (970)
482–3143.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
140-square-foot buried powerhouse; (2)
an approximately 30-foot-long, 16-inchdiameter intake pipe branching off the
36-inch-diameter Soldier Canyon
Pipeline; (3) one 100-kilowatt turbinegenerating unit; (4) an approximately
60-foot-long, 16-inch-diameter discharge
pipe returning water to the 36-inchdiameter Soldier Canyon Pipeline; and
(5) appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 880 megawatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
On February 28, 2014, PacifiCorp
Energy (PacifiCorp) filed an application
VerDate Sep<11>2014
16:43 Jun 23, 2015
Jkt 235001
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
E:\FR\FM\24JNN1.SGM
24JNN1
Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices
36329
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity..
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit..
The facility has an installed capacity that does not exceed 5 megawatts. ....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA..
Y
FPA 30(a)(3)(C)(i), as amended by HREA
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
1 18
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–18) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15491 Filed 6–23–15; 8:45 am]
BILLING CODE 6717–01–P
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
16:43 Jun 23, 2015
Jkt 235001
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Y
Y
Y
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14327–004]
Pershing County Water Conservation
District, Nevada; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
License.
b. Project No.: 14327–004.
c. Date Filed: June 4, 2015.
d. Licensee: Pershing County Water
Conservation District, Nevada.
e. Name of Project: Humboldt River
Hydropower Project.
f. Location: The unconstructed project
would be located at the U.S. Department
of the Interior, Bureau of Reclamation’s
Rye Patch Dam, on the Humboldt River
in Pershing County, Nevada. The project
would occupy 0.25 acre of federal land.
g. Filed Pursuant to: 18 CFR 6.2.
h. Licensee Contact: Mr. Bennie
Hodges, Manager, Pershing County
Water Conservation District, P.O. Box
218, Lovelock, NV 89419, Telephone:
(775) 273–2293, Email:
pcwcd@irrigation.lovelock.nv.us.
i. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
j. Deadline for filing comments,
interventions and protests is 30 days
from the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
E:\FR\FM\24JNN1.SGM
24JNN1
Agencies
[Federal Register Volume 80, Number 121 (Wednesday, June 24, 2015)]
[Notices]
[Pages 36328-36329]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15491]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-18-000]
Soldier Canyon Filter Plant; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On January 23, 2015, Soldier Canyon Filter Plant filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA), as amended by section 4
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The
proposed Soldier Canyon Micro Hydro Facility would have an installed
capacity of 100 kilowatts (kW), and would be located along the existing
36-inch-diameter Soldier Canyon Pipeline at the Soldier Canyon Filter
Plant. The project would be located near Fort Collins in Larimer
County, Colorado.
Applicant Contact: Mr. Chris Harris, General Manager, 4424 Laporte
Avenue, Fort Collins, CO 80521, Phone No. (970) 482-3143.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed 140-square-foot buried
powerhouse; (2) an approximately 30-foot-long, 16-inch-diameter intake
pipe branching off the 36-inch-diameter Soldier Canyon Pipeline; (3)
one 100-kilowatt turbine-generating unit; (4) an approximately 60-foot-
long, 16-inch-diameter discharge pipe returning water to the 36-inch-
diameter Soldier Canyon Pipeline; and (5) appurtenant facilities. The
proposed project would have an estimated annual generating capacity of
880 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
[[Page 36329]]
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies
Statutory provision Description (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the facility Y
HREA. uses is a tunnel,
canal, pipeline,
aqueduct, flume, ditch,
or similar manmade
water conveyance that
is operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity..
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for such
generation only the
hydroelectric potential
of a non-federally
owned conduit..
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity that
does not exceed 5
megawatts..
FPA 30(a)(3)(C)(iii), as amended On or before August 9, Y
by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA..
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD15-18) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15491 Filed 6-23-15; 8:45 am]
BILLING CODE 6717-01-P