Sage Grouse Energy Project, LLC (Complainant v. PacifiCorp (Respondent); Notice of Amended Complaint, 36326-36327 [2015-15429]
Download as PDF
36326
Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–513–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Texas Gas Transmission, LLC; Notice
of Application
Take notice that on June 5, 2015,
Texas Gas Transmission, LLC (Texas
Gas) filed an application with the
Federal Energy Regulatory Commission
pursuant to sections 7(c) of the Natural
Gas Act (NGA) requesting authority to
construct and operate the Northern
Supply Access Project (Project).
Specifically, Texas Gas requests
authorization to: (i) Construct the new
23,877 hp Harrison Compressor Station
in Hamilton County, Ohio; ii) install gas
cooling facilities at the Dillsboro
Compressor Station in Dearborn County,
Indiana; (iii) install a new 9,688 hp gas
turbine compressor and various piping
modifications at the Bastrop Compressor
Station in Morehouse Parish, Louisiana;
and (iv) make certain yard and station
piping modifications at existing
compressor stations in Lawrence
County, Indiana; Jeffersontown,
Breckinridge and Webster Counties,
Kentucky; Tipton County, Tennessee;
and Coahoma County, Mississippi. The
project is designed to provide an
additional 384,000 MMBtu/d of north to
south transportation capacity on Texas
Gas’s system for eight shippers while
maintaining bi-directional flow
capability on its system. The estimated
cost of the Northern Supply Access
Project is $149 million.
This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to Kathy
D. Fort, Manager, Certificates ad Tariffs,
Texas Gas Transmission, LLC, 9
Greenway Plaza, Suite 2800, Houston,
TX 77046, by phone at (713) 479–8033
or by email at kathy.fort@bwpmlp.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
VerDate Sep<11>2014
16:43 Jun 23, 2015
Jkt 235001
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on July 8, 2015.
Dated: June 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15427 Filed 6–23–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–44–000]
Sage Grouse Energy Project, LLC
(Complainant v. PacifiCorp
(Respondent); Notice of Amended
Complaint
Take notice that on June 16, 2015,
Sage Grouse Energy Project LLC (Sage
Grouse) filed a second answer in
response to PacifiCorp’s April 22, 2015
filed answer; thereby, Sage Grouse
amended its original complaint filed on
February 9, 2015, as more fully
explained in its amendment. In
addition, on June 17, 2015, Sage Grouse
supplemented the June 16, 2015 filing
with exhibits.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
E:\FR\FM\24JNN1.SGM
24JNN1
Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 6, 2015.
Dated: June 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15429 Filed 6–23–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
tkelley on DSK3SPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP15–1057–000.
Applicants: Destin Pipeline Company,
L.L.C.
Description: Section 4(d) rate filing
per 154.204: Asset Management
Arrangements to be effective 6/13/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5046.
Comments Due: 5 p.m. ET 6/24/15.
Docket Numbers: RP15–1058–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Section 4(d) rate filing
per 154.204: Revise Evergreen Provision
for Firm Services to be effective 7/12/
2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5074.
VerDate Sep<11>2014
16:43 Jun 23, 2015
Jkt 235001
Comments Due: 5 p.m. ET 6/24/15.
Docket Numbers: RP15–1059–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Section 4(d) rate filing
per 154.204: Neg Rate Agmt Filing
(Tenaska 44540) to be effective 6/12/
2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5078.
Comments Due: 5 p.m. ET 6/24/15.
Docket Numbers: RP15–1060–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Section 4(d) rate filing
per 154.204: Neg Rate 2015/06/15
Chesapeake to be effective 6/15/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5182.
Comments Due: 5 p.m. ET 6/24/15.
Docket Numbers: RP15–1061–000.
Applicants: Gulfstream Natural Gas
System, L.L.C.
Description: Section 4(d) rate filing
per 154.204: Capacity Release Timeline
Cleanup to be effective 7/15/2015.
Filed Date: 6/15/15.
Accession Number: 20150615–5092.
Comments Due: 5 p.m. ET 6/29/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP07–34–000.
Applicants: PANHANDLE JOINT
PARTIES, Southwest Gas Storage
Company, Panhandle Complainants,
Panhandle Complainants v. Southwest
Gas.
Description: Southwest Gas Storage
Company submits its Semi-Annual
Compliance Report, for the period May
1, 2014 through October 31, 2014, under
RP07–34, et al.
Filed Date: 11/25/14.
Accession Number: 20141125–5393.
Comments Due: 5 p.m. ET 6/19/15.
Docket Numbers: RP07–541–000.
Applicants: Southwest Gas Storage
Company.
Description: Southwest Gas Storage
Company submits its Semi-Annual
Compliance Report, for the period May
1, 2014 through October 31, 2014, under
RP07–34, et al.
Filed Date: 11/25/14.
Accession Number: 20141125–5393.
Comments Due: 5 p.m. ET 6/19/15.
Docket Numbers: RP07–34–000.
Applicants: PANHANDLE JOINT
PARTIES, Southwest Gas Storage
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
36327
Company, Panhandle Complainants,
Panhandle Complainants v. Southwest
Gas.
Description: Southwest Gas Storage
Company submits its Semi-Annual
Compliance Report, for the period
November 1, 2014 through April 30,
2015, under RP07–34, et al.
Filed Date: 6/2/15.
Accession Number: 20150602–5191.
Comments Due: 5 p.m. ET 6/19/15.
Docket Numbers: RP07–541–000.
Applicants: Southwest Gas Storage
Company.
Description: Southwest Gas Storage
Company submits its Semi-Annual
Compliance Report, for the period
November 1, 2014 through April 30,
2015, under RP07–34, et al.
Filed Date: 6/2/15.
Accession Number: 20150602–5191.
Comments Due: 5 p.m. ET 6/19/15.
Docket Numbers: RP10–896–003.
Applicants: Granite State Gas
Transmission, Inc.
Description: Petition of Granite State
Gas Transmission, Inc. for Approval of
Second Amended Settlement.
Filed Date: 6/11/15.
Accession Number: 20150611–5237.
Comments Due: 5 p.m. ET 6/22/15.
Docket Numbers: RP15–583–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Compliance filing per
154.501: Refund Report in Docket Nos.
RP15–583, RP08–426 and RP10–1398.
Filed Date: 6/11/15
Accession Number: 20150611–5070.
Comments Due: 5 p.m. ET 6/23/15.
Docket Numbers: RP15–615–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Compliance filing per
154.501: Refund Report in Docket Nos.
RP15–615, RP08–426 and RP10–1398.
Filed Date: 6/11/15.
Accession Number: 20150611–5073.
Comments Due: 5 p.m. ET 6/23/15.
Docket Numbers: RP01–382–025.
Applicants: Northern Natural Gas
Company.
Description: Northern Natural Gas
Company submits for filing its annual
report setting forth the Carlton
Resolution buyout and surcharge dollars
reimbursed to the Carlton Sourcers on
their May Reservation invoices for the
2014–2015 heating season.
Filed Date: 6/1/15.
Accession Number: 20150601–5403.
Comments Due: 5 p.m. ET 6/19/15.
Docket Numbers: RP15–1041–000.
Applicants: Elba Express Company,
L.L.C.
Description: 2015 Annual Cashout
True-Up Report of Elba Express
Company, L.L.C.
E:\FR\FM\24JNN1.SGM
24JNN1
Agencies
[Federal Register Volume 80, Number 121 (Wednesday, June 24, 2015)]
[Notices]
[Pages 36326-36327]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15429]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL15-44-000]
Sage Grouse Energy Project, LLC (Complainant v. PacifiCorp
(Respondent); Notice of Amended Complaint
Take notice that on June 16, 2015, Sage Grouse Energy Project LLC
(Sage Grouse) filed a second answer in response to PacifiCorp's April
22, 2015 filed answer; thereby, Sage Grouse amended its original
complaint filed on February 9, 2015, as more fully explained in its
amendment. In addition, on June 17, 2015, Sage Grouse supplemented the
June 16, 2015 filing with exhibits.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as
[[Page 36327]]
appropriate. The Respondent's answer and all interventions, or protests
must be filed on or before the comment date. The Respondent's answer,
motions to intervene, and protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
``eSubscription'' link on the Web site that enables subscribers to
receive email notification when a document is added to a subscribed
docket(s). For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on July 6, 2015.
Dated: June 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15429 Filed 6-23-15; 8:45 am]
BILLING CODE 6717-01-P