Natural Gas Pipeline Company of America LLC; Notice of Application, 35343-35344 [2015-15105]
Download as PDF
Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: June 12, 2015.
Kimberly D. Bose,
Secretary.
[Docket No. ER15–1908–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
West Chicago Battery Storage LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2015–15095 Filed 6–18–15; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of West
Chicago Battery Storage LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 2, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
VerDate Sep<11>2014
19:33 Jun 18, 2015
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–2586–002.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing per 35:
20150612_IPE4–5_SecondCompliance
to be effective 2/2/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5130.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1430–001.
Applicants: Appalachian Power
Company.
Description: Tariff Amendment per
35.17(b): Reactive Supply and Voltage
Control Amendment Amd to be effective
6/1/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5143.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1432–001.
Applicants: AEP Generation
Resources Inc.
Description: Tariff Amendment per
35.17(b): Reactive Supply and Voltage
Control Amendment Amd to be effective
6/1/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5145.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1444–001.
Applicants: Wheeling Power
Company.
Description: Compliance filing per 35:
Power Coordination Agreement
Concurrence Compliance to be effective
6/1/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5150.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1446–001.
Applicants: Wheeling Power
Company.
Description: Compliance filing per 35:
System Integration Agreement
Concurrence Compliance to be effective
6/1/2015.
Filed Date: 6/12/15.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
35343
Accession Number: 20150612–5151.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1912–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Service Agreement
Nos. 2526, 2527, 2528, and 2529 to be
effective 5/13/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5207.
Comments Due: 5 p.m. ET 7/6/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15102 Filed 6–18–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–505–000]
Natural Gas Pipeline Company of
America LLC; Notice of Application
Take notice that on June 1, 2015,
Natural Gas Pipeline Company of
America LLC (Natural) 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515–7918, filed an application
pursuant to section 7(c) of the Natural
Gas Act (NGA) and the Federal Energy
Regulatory Commission’s (Commission)
regulations seeking authorization to
construct and operate a new greenfield
compressor station and related facilities
located in Livingston County, Illinois
(Chicago Market Expansion Project).
The Chicago Market Expansion Project
will add 30,000 horsepower of new
compression to Natural’s system. The
proposed project is in response to
market demand and will support an
E:\FR\FM\19JNN1.SGM
19JNN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
35344
Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices
additional 238,000 dekatherms per day
of firm transportation service to the
Chicago market area, all as more fully
described in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Bruce
H. Newsome, Vice President, Natural
Gas Pipeline Company of America LLC,
3250 Lacey Road, Suite 700, Downers
Grove, IL 60515 or call (630) 725–3070
or by email bruce_newsome@
kindermorgan.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
VerDate Sep<11>2014
19:33 Jun 18, 2015
Jkt 235001
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on July 6, 2015.
Dated: June 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15105 Filed 6–18–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–1907–000]
Joliet Battery Storage LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Joliet
Battery Storage LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 2, 2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 80, Number 118 (Friday, June 19, 2015)]
[Notices]
[Pages 35343-35344]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15105]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-505-000]
Natural Gas Pipeline Company of America LLC; Notice of
Application
Take notice that on June 1, 2015, Natural Gas Pipeline Company of
America LLC (Natural) 3250 Lacey Road, Suite 700, Downers Grove,
Illinois 60515-7918, filed an application pursuant to section 7(c) of
the Natural Gas Act (NGA) and the Federal Energy Regulatory
Commission's (Commission) regulations seeking authorization to
construct and operate a new greenfield compressor station and related
facilities located in Livingston County, Illinois (Chicago Market
Expansion Project). The Chicago Market Expansion Project will add
30,000 horsepower of new compression to Natural's system. The proposed
project is in response to market demand and will support an
[[Page 35344]]
additional 238,000 dekatherms per day of firm transportation service to
the Chicago market area, all as more fully described in the application
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Any questions regarding this application should be directed to
Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of
America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515 or
call (630) 725-3070 or by email bruce_newsome@kindermorgan.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made in the proceeding with the Commission
and must mail a copy to the applicant and to every other party. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on July 6, 2015.
Dated: June 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15105 Filed 6-18-15; 8:45 am]