SPS of Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 35335-35336 [2015-15100]
Download as PDF
Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices
Dated: June 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15111 Filed 6–18–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–156–000.
Applicants: American Transmission
Company LLC.
Description: Application of American
Transmission Company LLC for
Authority to Acquire Certain Facilities
under Section 203 of the Federal Power
Act.
Filed Date: 6/12/15.
Accession Number: 20150612–5253.
Comments Due: 5 p.m. ET 7/6/15.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG15–95–000.
Applicants: Blue Sky West, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Blue Sky West, LLC.
Filed Date: 6/11/15.
Accession Number: 20150611–5238.
Comments Due: 5 p.m. ET 7/2/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3576–011;
ER11–3401–010.
Applicants: Golden Spread Electric
Cooperative, Inc., Golden Spread
Panhandle Wind Ranch, LLC.
Description: Notice of Non-material
Change in Status of Golden Spread
Electric Cooperative, Inc.
Filed Date: 6/12/15.
Accession Number: 20150612–5254.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1913–000..
Applicants: Ameren Illinois Company
Description: Section 205(d) Rate
Filing: Cancellation of Rate Schedule
106 to be effective 3/30/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5228.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1914–000.
Applicants: 87RL 8me LLC.
Description: Baseline eTariff Filing:
87RL 8me LLC MBR Tariff to be
effective 8/1/2015.
Filed Date: 6/12/15.
Accession Number: 20150612–5229.
Comments Due: 5 p.m. ET 7/6/15.
Docket Numbers: ER15–1915–000.
Applicants: Clean Energy Future—
Lordstown, LLC.
Description: Request for Limited
Waiver of Clean Energy Future—
Lordstown, LLC.
Filed Date: 6/12/15.
Accession Number: 20150612–5252.
Comments Due: 5 p.m. ET 7/6/15.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES15–34–000.
Applicants: Central Maine Power
Company.
Description: Application for
Authorization to Issue Short-term Debt
Instruments of Central Maine Power
Company.
Filed Date: 6/12/15.
Accession Number: 20150612–5255.
Comments Due: 5 p.m. ET 7/6/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
35335
Dated: June 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15103 Filed 6–18–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–28–000]
SPS of Oregon; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On June 4, 2015, SPS of Oregon filed
a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA), as amended by section
4 of the Hydropower Regulatory
Efficiency Act of 2013 (HREA). The
proposed SPS2 Hydro project would
have an installed capacity of 13
kilowatts (kW) and would be located on
the existing Westside Ditch, used for
irrigation, and will be enclosed with a
10-inch-diameter pipe. The project
would be located near Wallowa in
Wallowa County, Oregon.
Applicant Contact: Kyle Petrocine,
SPS of Oregon, 401 NE First St., Suite
A, Enterprise, OR 97828, Phone No.
(541) 398–0018.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) 2,500 feet
of 10-inch PVC pipe located on the
existing Westside Ditch; (2) a proposed
5′x8′ powerhouse containing one
generating unit with an installed
capacity of 13 kW; (3) a short tailrace
exhausting flow back into the irrigation
ditch; and (4) appurtenant facilities. The
proposed project would have an
estimated annual generating capacity of
81.895 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
Y
VerDate Sep<11>2014
19:33 Jun 18, 2015
Jkt 235001
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
E:\FR\FM\19JNN1.SGM
19JNN1
35336
Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(C)(i), as amended by HREA
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
asabaliauskas on DSK5VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
1 18
19:33 Jun 18, 2015
Dated: June 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15100 Filed 6–18–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14513–001]
Idaho Irrigation District, New Sweden
Irrigation District; Notice of Intent To
File License Application, Filing of PreApplication Document (PAD),
Commencement of Pre-Filing Process,
and Scoping; Request for Comments
on the PAD and Scoping Document,
and Identification of Issues and
Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for an Original
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–28–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Jkt 235001
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Y
Y
License and Commencing Pre-filing
Process.
b. Project No.: 14513–001.
c. Date Filed: April 20, 2015.
d. Submitted By: Idaho Irrigation
District, New Sweden Irrigation District
(the Districts).
e. Name of Project: County Line Road
Hydroelectric Project.
f. Location: On the Snake River, in
Jefferson and Bonneville Counties,
Idaho. The project would occupy 0.1
acre of United States lands under the
jurisdiction of the U.S. Bureau of Land
Management.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Applicant Contact: Nicholas Josten,
2742 Saint Charles Ave, Idaho Falls,
Idaho 83404; (208) 528–6152 or email at
gsense@cableone.com.
i. FERC Contact: Matt Cutlip at (503)
552–2762 or email at matt.cutlip@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item n. below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or
National Marine Fisheries Service under
section 7 of the Endangered Species Act
and the joint agency regulations
thereunder at 50 CFR part 402 and (b)
the State Historic Preservation Officer,
as required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. The Districts filed with the
Commission a Pre-Application
Document (PAD), pursuant to 18 CFR
5.6 of the Commission’s regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 80, Number 118 (Friday, June 19, 2015)]
[Notices]
[Pages 35335-35336]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-15100]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-28-000]
SPS of Oregon; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On June 4, 2015, SPS of Oregon filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed SPS2
Hydro project would have an installed capacity of 13 kilowatts (kW) and
would be located on the existing Westside Ditch, used for irrigation,
and will be enclosed with a 10-inch-diameter pipe. The project would be
located near Wallowa in Wallowa County, Oregon.
Applicant Contact: Kyle Petrocine, SPS of Oregon, 401 NE First St.,
Suite A, Enterprise, OR 97828, Phone No. (541) 398-0018.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) 2,500 feet of 10-inch PVC pipe located on
the existing Westside Ditch; (2) a proposed 5'x8' powerhouse containing
one generating unit with an installed capacity of 13 kW; (3) a short
tailrace exhausting flow back into the irrigation ditch; and (4)
appurtenant facilities. The proposed project would have an estimated
annual generating capacity of 81.895 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the facility Y
HREA. uses is a tunnel,
canal, pipeline,
aqueduct, flume, ditch,
or similar manmade
water conveyance that
is operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity.
[[Page 35336]]
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for such
generation only the
hydroelectric potential
of a non-federally
owned conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity that
does not exceed 5
megawatts.
FPA 30(a)(3)(C)(iii), as amended On or before August 9, Y
by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD15-28-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: June 15, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15100 Filed 6-18-15; 8:45 am]
BILLING CODE 6717-01-P