Riverdale Power and Electric Company, Inc.; Notice Soliciting Applications, 34633-34634 [2015-14873]
Download as PDF
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 116 / Wednesday, June 17, 2015 / Notices
Docket Numbers: ER10–3223–005;
ER10–2351–004; ER10–2875–011; ER10–
2368–004; ER10–2352–004; ER10–2264–
003; ER10–1581–013; ER10–2353–006;
ER10–2876–011; ER10–2878–011; ER10–
2354–005; ER10–2355–006; ER10–2879–
011; ER10–2384–005; ER10–2383–005;
ER10–2880–011; ER11–2107–005; ER11–
2108–005; ER10–2888–014; ER13–1745–
006; ER13–1803–007; ER13–1788–006;
ER13–1789–006; ER13–1790–007; ER10–
2896–011; ER10–2913–011; ER13–1791–
006; ER13–1746–008; ER13–1799–006;
ER13–1801–006; ER13–1802–006; ER10–
2916–011; ER10–2915–011; ER12–1525–
011; ER12–2019–010; ER10–2266–002;
ER12–2398–010; ER11–3459–010; ER10–
2931–011; ER13–1965–008; ER10–2969–
011; ER11–4351–006; ER11–4308–014;
ER11–2805–013; ER10–1580–013; ER10–
2382–005; ER11–2856–016; ER10–2356–
004; ER10–2357–005; ER13–2107–006;
ER13–2020–006; ER13–2050–006; ER11–
2857–016; ER10–2359–004; ER10–2360–
004; ER10–2369–004; ER10–2947–011;
ER10–2381–004; ER10–2575–004; ER10–
2361–005.
Applicants: Indian River Power LLC,
Jeffers Wind 20, LLC, Keystone Power
LLC, Laredo Ridge Wind, LLC,
Larswind, LLC, Long Beach Generation
LLC, Long Beach Peakers LLC, Lookout
WindPower LLC, Louisiana Generating
LLC, Middletown Power, LLC, MidwaySunset Cogeneration Company, Midwest
Generation LLC, Montville Power LLC,
Mountain Wind Power LLC, Mountain
Wind Power II LLC, NEO Freehold-Gen
LLC, North Community Turbines LLC,
North Wind Turbines LLC, Norwalk
Power LLC, NRG Bowline LLC, NRG
California South LP, NRG Canal LLC,
NRG Chalk Point LLC, NRG Delta LLC,
NRG Energy Center Dover LLC, NRG
Energy Center Paxton LLC, NRG Florida
LP, NRG Marsh Landing LLC, NRG
Potomac River LLC, NRG Power
Midwest LP, NRG REMA LLC, NRG
Rockford LLC, NRG Rockford II LLC,
NRG Solar Alpine LLC, NRG Solar Avra
Valley LLC, NRG Solar Blythe LLC, NRG
Solar Borrego I LLC, NRG Solar
Roadrunner LLC, NRG Sterlington
Power LLC, NRG Wholesale Generation
LP, Oswego Harbor Power LLC,
Pinnacle Wind, LLC, Reliant Energy
Northeast LLC, RRI Energy Services,
LLC, Saguaro Power Company, a Ltd.
Partnership, San Juan Mesa Wind
Project, LLC, Sand Drag LLC, Sierra
Wind, LLC, Sleeping Bear, LLC, Solar
Partners I, LLC, Solar Partners II, LLC,
Solar Partners VIII, LLC, Sun City
Project LLC, Sunrise Power Company,
LLC, TAIR Windfarm, LLC, Taloga
Wind, LLC, Vienna Power LLC, Walnut
Creek Energy, LLC, Watson
VerDate Sep<11>2014
18:47 Jun 16, 2015
Jkt 235001
Cogeneration Company, Wildorado
Wind, LLC.
Description: Notice of Non-Material
Change in Status of NRG MBR Sellers
[Part 2].
Filed Date: 6/8/15.
Accession Number: 20150608–5266.
Comments Due: 5 p.m. ET 6/29/15.
Docket Numbers: ER15–1494–001.
Applicants: Convergent Energy and
Power Inc.
Description: Tariff Amendment per
35.17(b): Petition for Acceptance of
Initial Tariff, Waivers and Blanket
Authority to be effective 6/15/2015.
Filed Date: 6/9/15.
Accession Number: 20150609–5135.
Comments Due: 5 p.m. ET 6/30/15.
Docket Numbers: ER15–1892–000.
Applicants: PacifiCorp.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): PacifiCorp Energy
Construction Agmt—Paisley to be
effective 6/1/2015.
Filed Date: 6/9/15.
Accession Number: 20150609–5103.
Comments Due: 5 p.m. ET 6/30/15.
Docket Numbers: ER15–1893–000.
Applicants: Censtar Energy Corp.
Description: Tariff Withdrawal per
35.15: CenStar Energy Corp.
Cancellation of MBR Tariff to be
effective 6/10/2015.
Filed Date: 6/9/15.
Accession Number: 20150609–5110.
Comments Due: 5 p.m. ET 6/30/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–14892 Filed 6–16–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
34633
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9100–036]
Riverdale Power and Electric
Company, Inc.; Notice Soliciting
Applications
On May 31, 2012, Riverdale Power
and Electric Company, Inc. (Riverdale or
licensee) filed a Notice of Intent (NOI)
to file an application for an exemption
from licensing for its Riverdale Mills
Project, No. 9100, pursuant to section
16.19(b) of the Commission’s
regulations. The existing license for
Project No. 9100 expires on May 31,
2017.
The Riverdale Mills Project currently
operates with a capacity of 150kilowatts (kW); however, in its NOI, the
licensee indicated that it intends to
increase capacity to 420 kW. The project
is located on the Blackstone River, in
the town of Northbridge, Worcester
County, Massachusetts. The project does
not occupy any federal lands.
The principal project works consist
of: (1) A 10-foot-high, 142-foot-long dam
with 6 bays containing stoplogs and
flashboards with a crest elevation of
262.35 feet above mean sea level; (2) an
11.8-acre impoundment; (3) three
sluiceways; (4) a 150-kilowatt turbinegenerator unit located in a mill building;
(5) a 231-foot-long tailrace; and (6)
appurtenant facilities.
Pursuant to section 16.20(c) of the
Commission’s regulations, an existing
licensee with a minor license not
subject to sections 14 and 15 of the
Federal Power Act must file an
application for a subsequent license at
least 24 months prior to the expiration
of the current license. As stated above,
Riverdale’s NOI indicated it would be
filing an application for an exemption
from licensing; however, it did not file
an application for a subsequent license
or an application for exemption from
licensing for the Riverdale Mills Project
by the May 31, 2015, deadline.
Therefore, pursuant to section
16.24(b)(2) of the Commission’s
regulations, Riverdale is prohibited from
filing an application either individually
or in conjunction with other entities for
the Riverdale Mills Project.
Pursuant to section 16.25 of the
Commission’s regulations, we are
soliciting applications from potential
applicants other than the existing
licensee. Interested parties have 90 days
from the date of this notice to file a NOI
to file an application for a subsequent
license or exemption from licensing. An
application for subsequent license or
E:\FR\FM\17JNN1.SGM
17JNN1
34634
Federal Register / Vol. 80, No. 116 / Wednesday, June 17, 2015 / Notices
exemption for the Riverdale Mills
Project (No. 9100) must be filed within
18 months of the date of filing the NOI.
Questions concerning this notice
should be directed to Dr. Nicholas Palso
at (202) 502–8854 or nicholas.palso@
ferc.gov.
Dated: June 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14873 Filed 6–16–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–506–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
Take notice that on June 1, 2015,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Highway 56,
Owensboro, Kentucky 42301, filed in
Docket No. CP15–506–000, a prior
notice request pursuant to sections
157.205, 157.210 and 157.211 of the
Commission’s regulations under the
Natural Gas Act (NGA) as amended,
requesting authorization to construct its
Ameren Delivery Project to provide an
additional 3,650 dekatherms per day of
firm transportation service to Union
Electric Company d/b/a Ameren
Missouri (Ameren) in Boone County,
Missouri. Southern Star proposes to: (i)
increase Turbine T1402 by 200
horsepower through a combustor
replacement at the Columbia
Compressor Station located in Boone
County, Missouri; (ii) modify Engine #
2 at the Concordia Compressor Station
located in Johnson County, Missouri;
(iii) modify SCADA and load controls
for both compressor stations; and (iv)
construct a new delivery interconnect
with Ameren. Southern Star estimates
the cost of the Ameren Delivery Project
to be $1,966,000, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to David N.
Roberts, Regulatory Compliance Analyst
VerDate Sep<11>2014
20:08 Jun 16, 2015
Jkt 235001
Staff, Southern Star Central Gas
Pipeline, Inc., 4700 State Highway 76,
Owensboro, Kentucky 42301, by
telephone at (270) 852–4654, or by
email at David.N.Roberts@sscgp.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: June 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14867 Filed 6–16–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Public Availability of FY 2014
Service Contract Inventories and
Supplemental Data
Federal Energy Regulatory
Commission.
ACTION: Notice of public availability of
FY 2014 service contract inventories
and supplemental data.
AGENCY:
In accordance with Section
743 of Division C of the Consolidated
Appropriations Act of 2010 (Pub. L.
111–117), the Federal Energy Regulatory
Commission (FERC) is publishing this
notice to advise the public on the
availability of the FY 2014 Service
Contract Inventory, a report that
analyzes the Commission’s FY 2014
Service Contract Inventory and an
inventory supplement that identifies the
amount invoiced and direct labor hours
for covered service contract actions.
The service contract inventory
provides information on service contract
actions over $25,000 that FERC
completed in FY 2014. The information
is organized by function to show how
contracted resources are distributed
throughout the agency. The inventory
has been developed in accordance with
guidance issued on November 5, 2010,
by the Office of Management and
Budget’s Office of Federal Procurement
Policy (OFPP).
OFPP’s guidance is available at
https://www.whitehouse.gov/sites/
default/files/omb/procurement/
memo/service-contract-inventoriesguidance-11052010.pdf. On
December 19, 2011, OFPP issued
additional guidance available at
https://www.whitehouse.gov/
SUMMARY:
E:\FR\FM\17JNN1.SGM
17JNN1
Agencies
[Federal Register Volume 80, Number 116 (Wednesday, June 17, 2015)]
[Notices]
[Pages 34633-34634]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14873]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9100-036]
Riverdale Power and Electric Company, Inc.; Notice Soliciting
Applications
On May 31, 2012, Riverdale Power and Electric Company, Inc.
(Riverdale or licensee) filed a Notice of Intent (NOI) to file an
application for an exemption from licensing for its Riverdale Mills
Project, No. 9100, pursuant to section 16.19(b) of the Commission's
regulations. The existing license for Project No. 9100 expires on May
31, 2017.
The Riverdale Mills Project currently operates with a capacity of
150-kilowatts (kW); however, in its NOI, the licensee indicated that it
intends to increase capacity to 420 kW. The project is located on the
Blackstone River, in the town of Northbridge, Worcester County,
Massachusetts. The project does not occupy any federal lands.
The principal project works consist of: (1) A 10-foot-high, 142-
foot-long dam with 6 bays containing stoplogs and flashboards with a
crest elevation of 262.35 feet above mean sea level; (2) an 11.8-acre
impoundment; (3) three sluiceways; (4) a 150-kilowatt turbine-generator
unit located in a mill building; (5) a 231-foot-long tailrace; and (6)
appurtenant facilities.
Pursuant to section 16.20(c) of the Commission's regulations, an
existing licensee with a minor license not subject to sections 14 and
15 of the Federal Power Act must file an application for a subsequent
license at least 24 months prior to the expiration of the current
license. As stated above, Riverdale's NOI indicated it would be filing
an application for an exemption from licensing; however, it did not
file an application for a subsequent license or an application for
exemption from licensing for the Riverdale Mills Project by the May 31,
2015, deadline. Therefore, pursuant to section 16.24(b)(2) of the
Commission's regulations, Riverdale is prohibited from filing an
application either individually or in conjunction with other entities
for the Riverdale Mills Project.
Pursuant to section 16.25 of the Commission's regulations, we are
soliciting applications from potential applicants other than the
existing licensee. Interested parties have 90 days from the date of
this notice to file a NOI to file an application for a subsequent
license or exemption from licensing. An application for subsequent
license or
[[Page 34634]]
exemption for the Riverdale Mills Project (No. 9100) must be filed
within 18 months of the date of filing the NOI.
Questions concerning this notice should be directed to Dr. Nicholas
Palso at (202) 502-8854 or nicholas.palso@ferc.gov.
Dated: June 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-14873 Filed 6-16-15; 8:45 am]
BILLING CODE 6717-01-P