City of Adak, Alaska; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 34396-34397 [2015-14745]

Download as PDF 34396 Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 10, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–14744 Filed 6–15–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15–76–000] Grid Assurance LLC; Notice of Petition for Declaratory Order Take notice that on June 9, 2015, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Grid Assurance LLC (Grid Assurance), filed a petition for declaratory order requesting that the Commission make certain regulatory findings for the benefit of prospective subscribers to the spare transmission equipment service to be offered by Grid Assurance, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on July 9, 2015. Dated: June 10, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–14742 Filed 6–15–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alaska, filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA), as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed Adak Water System Project would have an installed capacity of 1.7 kilowatts (kW), and would be located along the existing 8-inch-diameter pipeline between the city’s water treatment plant and the treated water storage tanks. The project would be located in the City of Adak, Alaska. Applicant Contact: City of Adak, c/o Layton Lockett, City Manager, 100 Mechanics Way, Adak, AK 99546, Phone No. (907) 592–4500. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) The existing approximately 100-square-foot PRV2 building; (2) a short 4-inchdiameter intake pipe receiving water from the existing approximately 4,535foot-long, 8-inch-diameter pipeline from the city’s water treatment plant; (3) one turbine/generator unit with an installed capacity of 1.7 kW; (4) a short 4-inchdiameter discharge pipe returning water to a short existing 8-inch-diameter pipeline that provides water to the existing treated water storage tanks; and (5) appurtenant facilities. The proposed project would have a total installed capacity of 1.7 kW. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. [Docket No., CD15–25–000] City of Adak, Alaska; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On May 26, 2015, and supplemented on May 26, 2015, the City of Adak, asabaliauskas on DSK5VPTVN1PROD with NOTICES TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .. The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. Y FPA 30(a)(3)(C)(i), as amended by HREA VerDate Sep<11>2014 17:18 Jun 15, 2015 Jkt 235001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1 Y Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices 34397 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued Description Satisfies (Y/N) by The facility has an installed capacity that does not exceed 5 megawatts .................. Y by On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y Statutory provision asabaliauskas on DSK5VPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended HREA. FPA 30(a)(3)(C)(iii), as amended HREA. Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 1 18 CFR 385.2001–2005 (2014). VerDate Sep<11>2014 17:18 Jun 15, 2015 Jkt 235001 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD15–25) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: June 8, 2015. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. IS14–607–000, et al.] Zydeco Pipeline Company, LLC; Notice of Informal Settlement Conference Take notice that an informal settlement conference will be convened in this proceeding commencing at 10:00 a.m. on June 22, 2015, at the offices of the Federal Energy Regulatory Commission, 888 1st, NE., Washington, DC 20426, for the purpose of exploring the possible settlement of the abovereferenced case. Any party, as defined by 18 CFR 385.102(c), or any participant as defined by 18 CFR 385.102(b), is invited to attend. Persons wishing to become a party must move to intervene and Frm 00035 Fmt 4703 Dated: June 10, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–14747 Filed 6–15–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–148–000] [FR Doc. 2015–14745 Filed 6–15–15; 8:45 am] PO 00000 receive intervenor status pursuant to the Commission’s regulations (18 CFR 385.214). FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an email to accessibility@ferc.gov or call toll free 1–866–208–3372 (voice) or 202–502– 8659 (TTY), or send a FAX to 202–208– 2106 with the required accommodations. For additional information, please contact Joel Cockrell Joel.Cockrell@ ferc.gov 202–502–8153 or Nicolas McTyre Nicolas.McTyre@ferc.gov 202– 502–8356. Sfmt 4703 Tennessee Gas Pipeline Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Susquehanna West Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Susquehanna West Project involving construction and operation of facilities by Tennessee Gas Pipeline Company, L.L.C. (TGP) in Tioga and Bradford Counties, Pennsylvania. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. You can make a difference by providing us with your specific comments or concerns about the project. Your E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 80, Number 115 (Tuesday, June 16, 2015)]
[Notices]
[Pages 34396-34397]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14745]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No., CD15-25-000]


City of Adak, Alaska; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On May 26, 2015, and supplemented on May 26, 2015, the City of 
Adak, Alaska, filed a notice of intent to construct a qualifying 
conduit hydropower facility, pursuant to section 30 of the Federal 
Power Act (FPA), as amended by section 4 of the Hydropower Regulatory 
Efficiency Act of 2013 (HREA). The proposed Adak Water System Project 
would have an installed capacity of 1.7 kilowatts (kW), and would be 
located along the existing 8-inch-diameter pipeline between the city's 
water treatment plant and the treated water storage tanks. The project 
would be located in the City of Adak, Alaska.
    Applicant Contact: City of Adak, c/o Layton Lockett, City Manager, 
100 Mechanics Way, Adak, AK 99546, Phone No. (907) 592-4500.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
christopher.chaney@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) The existing approximately 100-square-
foot PRV2 building; (2) a short 4-inch-diameter intake pipe receiving 
water from the existing approximately 4,535-foot-long, 8-inch-diameter 
pipeline from the city's water treatment plant; (3) one turbine/
generator unit with an installed capacity of 1.7 kW; (4) a short 4-
inch-diameter discharge pipe returning water to a short existing 8-
inch-diameter pipeline that provides water to the existing treated 
water storage tanks; and (5) appurtenant facilities.
    The proposed project would have a total installed capacity of 1.7 
kW.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.

[[Page 34397]]

 
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD15-25) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call 
(202) 502-8659.

    Dated: June 8, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-14745 Filed 6-15-15; 8:45 am]
 BILLING CODE 6717-01-P