City of Adak, Alaska; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 34396-34397 [2015-14745]
Download as PDF
34396
Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14744 Filed 6–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–76–000]
Grid Assurance LLC; Notice of Petition
for Declaratory Order
Take notice that on June 9, 2015,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2014),
Grid Assurance LLC (Grid Assurance),
filed a petition for declaratory order
requesting that the Commission make
certain regulatory findings for the
benefit of prospective subscribers to the
spare transmission equipment service to
be offered by Grid Assurance, all as
more fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on July 9, 2015.
Dated: June 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14742 Filed 6–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Alaska, filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Adak
Water System Project would have an
installed capacity of 1.7 kilowatts (kW),
and would be located along the existing
8-inch-diameter pipeline between the
city’s water treatment plant and the
treated water storage tanks. The project
would be located in the City of Adak,
Alaska.
Applicant Contact: City of Adak, c/o
Layton Lockett, City Manager, 100
Mechanics Way, Adak, AK 99546,
Phone No. (907) 592–4500.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) The
existing approximately 100-square-foot
PRV2 building; (2) a short 4-inchdiameter intake pipe receiving water
from the existing approximately 4,535foot-long, 8-inch-diameter pipeline from
the city’s water treatment plant; (3) one
turbine/generator unit with an installed
capacity of 1.7 kW; (4) a short 4-inchdiameter discharge pipe returning water
to a short existing 8-inch-diameter
pipeline that provides water to the
existing treated water storage tanks; and
(5) appurtenant facilities.
The proposed project would have a
total installed capacity of 1.7 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
[Docket No., CD15–25–000]
City of Adak, Alaska; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On May 26, 2015, and supplemented
on May 26, 2015, the City of Adak,
asabaliauskas on DSK5VPTVN1PROD with NOTICES
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
VerDate Sep<11>2014
17:18 Jun 15, 2015
Jkt 235001
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
E:\FR\FM\16JNN1.SGM
16JNN1
Y
Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices
34397
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Description
Satisfies
(Y/N)
by
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
Statutory provision
asabaliauskas on DSK5VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
1 18
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
17:18 Jun 15, 2015
Jkt 235001
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–25) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: June 8, 2015.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. IS14–607–000, et al.]
Zydeco Pipeline Company, LLC; Notice
of Informal Settlement Conference
Take notice that an informal
settlement conference will be convened
in this proceeding commencing at 10:00
a.m. on June 22, 2015, at the offices of
the Federal Energy Regulatory
Commission, 888 1st, NE., Washington,
DC 20426, for the purpose of exploring
the possible settlement of the abovereferenced case.
Any party, as defined by 18 CFR
385.102(c), or any participant as defined
by 18 CFR 385.102(b), is invited to
attend. Persons wishing to become a
party must move to intervene and
Frm 00035
Fmt 4703
Dated: June 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–14747 Filed 6–15–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–148–000]
[FR Doc. 2015–14745 Filed 6–15–15; 8:45 am]
PO 00000
receive intervenor status pursuant to the
Commission’s regulations (18 CFR
385.214).
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
1–866–208–3372 (voice) or 202–502–
8659 (TTY), or send a FAX to 202–208–
2106 with the required
accommodations.
For additional information, please
contact Joel Cockrell Joel.Cockrell@
ferc.gov 202–502–8153 or Nicolas
McTyre Nicolas.McTyre@ferc.gov 202–
502–8356.
Sfmt 4703
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Susquehanna West Project
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Susquehanna West Project involving
construction and operation of facilities
by Tennessee Gas Pipeline Company,
L.L.C. (TGP) in Tioga and Bradford
Counties, Pennsylvania. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 80, Number 115 (Tuesday, June 16, 2015)]
[Notices]
[Pages 34396-34397]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14745]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No., CD15-25-000]
City of Adak, Alaska; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On May 26, 2015, and supplemented on May 26, 2015, the City of
Adak, Alaska, filed a notice of intent to construct a qualifying
conduit hydropower facility, pursuant to section 30 of the Federal
Power Act (FPA), as amended by section 4 of the Hydropower Regulatory
Efficiency Act of 2013 (HREA). The proposed Adak Water System Project
would have an installed capacity of 1.7 kilowatts (kW), and would be
located along the existing 8-inch-diameter pipeline between the city's
water treatment plant and the treated water storage tanks. The project
would be located in the City of Adak, Alaska.
Applicant Contact: City of Adak, c/o Layton Lockett, City Manager,
100 Mechanics Way, Adak, AK 99546, Phone No. (907) 592-4500.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) The existing approximately 100-square-
foot PRV2 building; (2) a short 4-inch-diameter intake pipe receiving
water from the existing approximately 4,535-foot-long, 8-inch-diameter
pipeline from the city's water treatment plant; (3) one turbine/
generator unit with an installed capacity of 1.7 kW; (4) a short 4-
inch-diameter discharge pipe returning water to a short existing 8-
inch-diameter pipeline that provides water to the existing treated
water storage tanks; and (5) appurtenant facilities.
The proposed project would have a total installed capacity of 1.7
kW.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
[[Page 34397]]
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD15-25) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: June 8, 2015.
Kimberly D. Bose,
Secretary.