Download as PDF 34492 Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices By Order of the Maritime Administrator Dated: June 8, 2015. Thomas M. Hudson, Jr., Acting Secretary, Maritime Administration. [FR Doc. 2015–14782 Filed 6–15–15; 8:45 am] BILLING CODE 4910–81–P DEPARTMENT OF TRANSPORTATION Maritime Administration [Docket No. MARAD–2015 0074] Requested Administrative Waiver of the Coastwise Trade Laws: Vessel ANGELA–ARGO; Invitation for Public Comments Maritime Administration, Department of Transportation. ACTION: Notice. AGENCY: As authorized by 46 U.S.C. 12121, the Secretary of Transportation, as represented by the Maritime Administration (MARAD), is authorized to grant waivers of the U.S.-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has been received by MARAD. The vessel, and a brief description of the proposed service, is listed below. DATES: Submit comments on or before July 16, 2015. ADDRESSES: Comments should refer to docket number MARAD–2015–0074. Written comments may be submitted by hand or by mail to the Docket Clerk, U.S. Department of Transportation, Docket Operations, M–30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590. You may also send comments electronically via the Internet at https://www.regulations.gov. All comments will become part of this docket and will be available for inspection and copying at the above address between 10 a.m. and 5 p.m., E.T., Monday through Friday, except federal holidays. An electronic version of this document and all documents entered into this docket is available on the World Wide Web at https:// www.regulations.gov. SUMMARY: asabaliauskas on DSK5VPTVN1PROD with NOTICES FOR FURTHER INFORMATION CONTACT: Linda Williams, U.S. Department of Transportation, Maritime Administration, 1200 New Jersey Avenue SE., Room W23–453, Washington, DC 20590. Telephone 202– 366–0903, Email Linda.Williams@ dot.gov. As described by the applicant the intended service of the vessel ANGELO–ARGO is: SUPPLEMENTARY INFORMATION: VerDate Sep<11>2014 17:18 Jun 15, 2015 Jkt 235001 Intended Commercial Use of Vessel: ‘‘Charter service for SCUBA diving on the east coast of the U.S. and Caribbean. In Addition we would offer day trips for sightseeing.’’ Geographic Region: ‘‘New York, New Jersey, Maryland, Virginia, North Carolina, South Carolina, Georgia, Florida, Puerto Rico.’’ The complete application is given in DOT docket MARAD–2015–0074 at https:// www.regulations.gov. Interested parties may comment on the effect this action may have on U.S. vessel builders or businesses in the U.S. that use U.S.-flag vessels. If MARAD determines, in accordance with 46 U.S.C. 12121 and MARAD’s regulations at 46 CFR part 388, that the issuance of the waiver will have an unduly adverse effect on a U.S.vessel builder or a business that uses U.S.-flag vessels in that business, a waiver will not be granted. Comments should refer to the docket number of this notice and the vessel name in order for MARAD to properly consider the comments. Comments should also state the commenter’s interest in the waiver application, and address the waiver criteria given in § 388.4 of MARAD’s regulations at 46 CFR part 388. Privacy Act Anyone is able to search the electronic form of all comments received into any of our dockets by the name of the individual submitting the comment (or signing the comment, if submitted on behalf of an association, business, labor union, etc.). You may review DOT’s complete Privacy Act Statement in the Federal Register published on April 11, 2000 (65 FR 19477). By Order of the Maritime Administrator. Dated: June 8, 2015. Thomas M. Hudson, Jr., Acting Secretary, Maritime Administration. [FR Doc. 2015–14784 Filed 6–15–15; 8:45 am] BILLING CODE 4910–81–P DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Special Permit Renewal Requests Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: This Notice pertains to the renewal requests for Special Permits with the following Docket Numbers: AGENCY: PHMSA–2008–0257 Transmission. PO 00000 Frm 00130 Fmt 4703 Texas Eastern Sfmt 4703 PHMSA–2010–0063 Anchor Point Energy SUMMARY: Pursuant to the Federal pipeline safety laws, PHMSA is publishing this notice of special permit renewal requests that we have received from two natural gas transmission pipeline operators, seeking relief from compliance with certain requirements in the Federal pipeline safety regulations. This notice seeks public comments on these requests, including comments on any safety or environmental impacts the renewal of these special permits would have. For each listed Special Permit renewal request, an Environmental Assessment is available in the respective docket for review and comment. At the conclusion of the 30-day comment period, PHMSA will evaluate the comments received and the technical analysis of the renewal requests to determine whether to grant or deny the renewal requests. DATES: Submit any comments regarding these special permit requests by July 16, 2015. ADDRESSES: Comments should reference the specific docket number for which the comment applies. Comments may be submitted in the following ways: • At the E-Gov Web site: https:// www.Regulations.gov. This site allows the public to enter comments on any Federal Register notice issued by any agency. • By Mail: Docket Management System: U.S. Department of Transportation, Docket Operations, M– 30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590. • By Hand Delivery: DOT Docket Management System: U.S. Department of Transportation, Docket Operations, M–30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590 between 9:00 a.m. and 5:00 p.m., Monday through Friday, except Federal holidays. Instructions: At the beginning of your comments, please identify the docket number for the special permit renewal request you are commenting on. If you submit your comments by mail, please submit two copies. To receive confirmation that PHMSA has received your comments, please include a selfaddressed stamped postcard. Internet users may submit comments at https:// www.Regulations.gov. Note: Please read the privacy statement published on https://www.Regulations.gov. Comments, including any personal information provided, are posted without changes or edits to https://www.Regulations. gov. E:\FR\FM\16JNN1.SGM 16JNN1 Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices Contacts for general or technical information: General: Kay McIver by telephone at (202) 366–0113; or by email at kay.mciver@dot.gov. Technical: Steve Nanney by telephone at (713) 272–2855; or by email at steve.nanney@dot.gov. SUPPLEMENTARY INFORMATION: PHMSA has received the following special permit renewal requests from two pipeline operators who seek relief from compliance with certain federal pipeline safety regulations. Each request includes a technical analysis provided by the respective operators, and filed under the original issued special permit number in the Federal Docket Management System (FDMS) at https:// www.Regulations.gov. PHMSA invites 34493 interested persons to participate by reviewing these special permit renewal requests and submitting written comments, data or other views in the FDMS. Please include comments on any potential environmental impacts that may result if these special permit renewals are granted. Details of Special Permit renewals received: Requesters Regulations Nature of special permit PHMSA–2008–0257 .... Texas Eastern Transmission, LP (TETLP) ..... 49 CFR § 192.611 ...... PHMSA–2010–0063 .... asabaliauskas on DSK5VPTVN1PROD with NOTICES Docket Nos. Cook Inlet Energy LLC (CIE) formerly issued to Anchor Point Energy § 192.121 .................... To reauthorize an increase in the maximum allowable operating pressure (MAOP) on the TETLP pipeline operation as defined in the original Special Permit issued on October 28, 2010. This special permit renewal will allow TETLP to increase the MAOP of the special permit segments to the alternative MAOP design factors specified in 49 CFR § 192.620, of up to 80 percent of the specified minimum yield strength (SMYS) in Class 1, 67 percent of SMYS in Class 2 location, and 56 percent of SMYS in Class 3 location, provided that certain alternative measures are implemented and numerous conditions and safety requirements are met as described in the Special Permit renewal conditions. The renewal request seeks to waive compliance from §§ 192.112(a)(1); 192.112(c); 192.112(d)(2)(i); 192.112(f)(1), and 192.620(d)(5)(iii) of the Federal Pipeline Safety Regulations. The original special permit did not include a waiver from the requirements of § 192.620(d)(11)(ii)(A). Since the special permit included dent response and repair criteria that differ from the criteria in § 192.620(d)(11)(ii)(A), TETLP requests that this section be noted in the special permit renewal. The Special Permit renewal pertains to the 36-inch, approximately 268 miles of Lines 1 and 2 TETLP pipelines starting from the Bedford Compressor Station in Pennsylvania to the Chambersburg, Compressor Station in Pennsylvania. There are no class 4 locations in the system and the current segments operate at an MAOP of 1,112 psig. The pipeline segments are located in Fayette, Somerset, Bedford, Fulton, Franklin, Adams, York and Lancaster Counties in Pennsylvania. To reauthorize the continued operation of 4.5-inch diameter, 8-mile reinforced thermoset plastic material FS LPJ (Fiberspar) pipeline built in the Kenai, Peninsula Borough near Anchor Point, Alaska. The renewal request seeks to waive compliance from § 192.121. The Anchor Point pipeline transports natural gas from the North Fork Unit and delivers it to a Sales Pipeline operated by Enstar Natural Gas Company. The MAOP of this pipeline is 1,328 psig. This special permit would only apply to Class 1 locations and areas outside of high consequence areas. Before acting on the special permit renewal requests, PHMSA will evaluate all comments received on or before the comments closing date in its decision to VerDate Sep<11>2014 17:18 Jun 15, 2015 Jkt 235001 grant or deny the renewal requests. Comments will be evaluated after this date only if it is possible to do so PO 00000 Frm 00131 Fmt 4703 Sfmt 4703 without incurring additional expense or delay. Authority: 49 U.S.C. 60118 (c)(1) and 49 CFR 1.53. E:\FR\FM\16JNN1.SGM 16JNN1 34494 Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices Issued in Washington, DC, on June 10, 2015. Alan K. Mayberry, Deputy Associate Administrator for Policy and Programs. [FR Doc. 2015–14720 Filed 6–15–15; 8:45 am] BILLING CODE 4910–60–P DEPARTMENT OF TRANSPORTATION Surface Transportation Board Senior Executive Service Performance Review Board (PRB) and Executive Resources Board (ERB) Membership AGENCY: Surface Transportation Board, DOT. Senior Executive Service Performance Review Board (PRB) and Executive Resources Board (ERB) Membership. ACTION: Effective immediately, the membership of the PRB and ERB is as follows: SUMMARY: Performance Review Board Leland L. Gardner, Chairman Rachel D. Campbell, Member Craig M. Keats, Member Lucille Marvin, Alternate Member Executive Resources Board Rachel D. Campbell, Chairman Lucille Marvin, Member Joseph H. Dettmar, Member William Huneke, Alternate Member FOR FURTHER INFORMATION CONTACT: If you have any questions, please contact Paula Chandler at paula.chandler@ stb.dot.gov or (202) 245–0340. Dated: June 8, 2015. Jeffrey Herzig, Clearance Clerk. [FR Doc. 2015–14697 Filed 6–15–15; 8:45 am] BILLING CODE 4915–01–P DEPARTMENT OF THE TREASURY Bureau of the Fiscal Service Proposed Collection of Information: Application for Issue of United States Mortgage Guaranty Insurance Company Tax and Loss Bonds Notice and request for comments. asabaliauskas on DSK5VPTVN1PROD with NOTICES ACTION: The Department of the Treasury, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on a proposed and/or continuing information collection, as required by the Paperwork SUMMARY: VerDate Sep<11>2014 17:18 Jun 15, 2015 Jkt 235001 Reduction Act of 1995, Public Law 104– performance of the functions of the 13 (44 U.S.C. 3506(c)(2)(A). Currently agency, including whether the the Bureau of the Fiscal Service within information shall have practical utility; the Department of the Treasury is (b) the accuracy of the agency’s estimate soliciting comments concerning the of the burden of the collection of ‘‘Application For Issue Of United States information; (c) ways to enhance the Mortgage Guaranty Insurance Company quality, utility, and clarity of the Tax And Loss Bonds’’. information to be collected; (d) ways to minimize the burden of the collection of DATES: Written comments should be information on respondents, including received on or before August 17, 2015 through the use of automated collection to be assured of consideration. techniques or other forms of information ADDRESSES: Direct all written comments technology; and (e) estimates of capital and requests for further information to or start-up costs and costs of operation, Bureau of the Fiscal Service, Bruce A. maintenance, and purchase of services Sharp, 200 Third Street A4–A, to provide information. Parkersburg, WV 26106–1328, or Dated: June 11, 2015. bruce.sharp@fiscal.treasury.gov. Bruce A. Sharp, FOR FURTHER INFORMATION CONTACT: Requests for additional information or Bureau Clearance Officer. copies of the form(s) and instructions [FR Doc. 2015–14692 Filed 6–15–15; 8:45 am] should be directed to Dwayne Boothe, BILLING CODE 4810–AS–P Branch Manager, Special Investments Branch; 200 Third Street Room 119, Parkersburg, WV 26106–1328, or DEPARTMENT OF THE TREASURY dwayne.boothe@fiscal.treasury.gov. Internal Revenue Service SUPPLEMENTARY INFORMATION: Titles: Application For Issue Of Proposed Collection; Comment United States Mortgage Guaranty Request for Form 8932 Insurance Company Tax And Loss Bonds. AGENCY: Internal Revenue Service (IRS), OMB Number: 1530–0052 (Previously Treasury. approved as 1535–0126 as a collection ACTION: Notice and request for conducted by Department of the comments. Treasury/Bureau of the Public Debt.) Transfer of OMB Control Number: The SUMMARY: The Department of the Bureau of Public Debt (BPD) and the Treasury, as part of its continuing effort Financial Management Service (FMS) to reduce paperwork and respondent have consolidated to become the Bureau burden, invites the general public and of the Fiscal Service (Fiscal Service). other Federal agencies to take this Information collection requests opportunity to comment on proposed previously held separately by BPD and and/or continuing information FMS will now be identified by a 1530 collections, as required by the prefix, designating Fiscal Service. Paperwork Reduction Act of 1995, Form Number: FS Form 3871. Public Law 104–13 (44 U.S.C. Abstract: The information is 3506(c)(2)(A)). Currently, the IRS is requested to obtain a creditor’s consent soliciting comments concerning Form to dispose of savings bonds/notes in 8932, Credit for Employer Differential settlement of a deceased owner’s estate Wage Payments. without administration. DATES: Written comments should be Current Actions: Extension of a received on or before August 17, 2015 currently approved collection. to be assured of consideration. Type of Review: Regular. ADDRESSES: Direct all written comments Affected Public: Business or other forto Christie Preston, Internal Revenue profit. Service, Room 6129, 1111 Constitution Estimated Number of Respondents: Avenue NW., Washington, DC 20224. 33. FOR FURTHER INFORMATION CONTACT: Estimated Time per Respondent: 15 Requests for additional information or minutes. copies of the form and instructions Estimated Total Annual Burden should be directed to Sara Covington, at Hours: 8. Internal Revenue Service, Room 6129, Request For Comments: Comments submitted in response to this notice will 1111 Constitution Avenue NW., Washington, DC 20224, or through the be summarized and/or included in the internet at Sara.L.Covington@irs.gov. request for OMB approval. All comments will become a matter of SUPPLEMENTARY INFORMATION: public record. Comments are invited on: Title: Credit for Employer Differential (a) Whether the collection of Wage Payments. OMB Number: 1545–2126. information is necessary for the proper PO 00000 Frm 00132 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 80, Number 115 (Tuesday, June 16, 2015)]
[Notices]
[Pages 34492-34494]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-14720]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Pipeline and Hazardous Materials Safety Administration


Pipeline Safety: Special Permit Renewal Requests

AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); 
DOT.

ACTION: This Notice pertains to the renewal requests for Special 
Permits with the following Docket Numbers:

-----------------------------------------------------------------------

PHMSA-2008-0257 Texas Eastern Transmission.
PHMSA-2010-0063 Anchor Point Energy
SUMMARY: Pursuant to the Federal pipeline safety laws, PHMSA is 
publishing this notice of special permit renewal requests that we have 
received from two natural gas transmission pipeline operators, seeking 
relief from compliance with certain requirements in the Federal 
pipeline safety regulations. This notice seeks public comments on these 
requests, including comments on any safety or environmental impacts the 
renewal of these special permits would have. For each listed Special 
Permit renewal request, an Environmental Assessment is available in the 
respective docket for review and comment. At the conclusion of the 30-
day comment period, PHMSA will evaluate the comments received and the 
technical analysis of the renewal requests to determine whether to 
grant or deny the renewal requests.

DATES: Submit any comments regarding these special permit requests by 
July 16, 2015.

ADDRESSES: Comments should reference the specific docket number for 
which the comment applies. Comments may be submitted in the following 
ways:
     At the E-Gov Web site: https://www.Regulations.gov. This 
site allows the public to enter comments on any Federal Register notice 
issued by any agency.
     By Mail: Docket Management System: U.S. Department of 
Transportation, Docket Operations, M-30, West Building Ground Floor, 
Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590.
     By Hand Delivery: DOT Docket Management System: U.S. 
Department of Transportation, Docket Operations, M-30, West Building 
Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 
20590 between 9:00 a.m. and 5:00 p.m., Monday through Friday, except 
Federal holidays.
    Instructions: At the beginning of your comments, please identify 
the docket number for the special permit renewal request you are 
commenting on. If you submit your comments by mail, please submit two 
copies. To receive confirmation that PHMSA has received your comments, 
please include a self-addressed stamped postcard. Internet users may 
submit comments at https://www.Regulations.gov.

    Note: Please read the privacy statement published on https://www.Regulations.gov. Comments, including any personal information 
provided, are posted without changes or edits to https://www.Regulations.gov.


[[Page 34493]]


    Contacts for general or technical information:
    General: Kay McIver by telephone at (202) 366-0113; or by email at 
kay.mciver@dot.gov.
    Technical: Steve Nanney by telephone at (713) 272-2855; or by email 
at steve.nanney@dot.gov.

SUPPLEMENTARY INFORMATION: PHMSA has received the following special 
permit renewal requests from two pipeline operators who seek relief 
from compliance with certain federal pipeline safety regulations. Each 
request includes a technical analysis provided by the respective 
operators, and filed under the original issued special permit number in 
the Federal Docket Management System (FDMS) at https://www.Regulations.gov. PHMSA invites interested persons to participate by 
reviewing these special permit renewal requests and submitting written 
comments, data or other views in the FDMS. Please include comments on 
any potential environmental impacts that may result if these special 
permit renewals are granted.
    Details of Special Permit renewals received:

----------------------------------------------------------------------------------------------------------------
                                                                                            Nature of special
             Docket Nos.                      Requesters              Regulations                 permit
----------------------------------------------------------------------------------------------------------------
PHMSA-2008-0257......................  Texas Eastern             49 CFR Sec.   192.611.  To reauthorize an
                                        Transmission, LP                                  increase in the
                                        (TETLP).                                          maximum allowable
                                                                                          operating pressure
                                                                                          (MAOP) on the TETLP
                                                                                          pipeline operation as
                                                                                          defined in the
                                                                                          original Special
                                                                                          Permit issued on
                                                                                          October 28, 2010. This
                                                                                          special permit renewal
                                                                                          will allow TETLP to
                                                                                          increase the MAOP of
                                                                                          the special permit
                                                                                          segments to the
                                                                                          alternative MAOP
                                                                                          design factors
                                                                                          specified in 49 CFR
                                                                                          Sec.   192.620, of up
                                                                                          to 80 percent of the
                                                                                          specified minimum
                                                                                          yield strength (SMYS)
                                                                                          in Class 1, 67 percent
                                                                                          of SMYS in Class 2
                                                                                          location, and 56
                                                                                          percent of SMYS in
                                                                                          Class 3 location,
                                                                                          provided that certain
                                                                                          alternative measures
                                                                                          are implemented and
                                                                                          numerous conditions
                                                                                          and safety
                                                                                          requirements are met
                                                                                          as described in the
                                                                                          Special Permit renewal
                                                                                          conditions. The
                                                                                          renewal request seeks
                                                                                          to waive compliance
                                                                                          from Sec.  Sec.
                                                                                          192.112(a)(1);
                                                                                          192.112(c);
                                                                                          192.112(d)(2)(i);
                                                                                          192.112(f)(1), and
                                                                                          192.620(d)(5)(iii) of
                                                                                          the Federal Pipeline
                                                                                          Safety Regulations.
                                                                                          The original special
                                                                                          permit did not include
                                                                                          a waiver from the
                                                                                          requirements of Sec.
                                                                                          192.620(d)(11)(ii)(A).
                                                                                          Since the special
                                                                                          permit included dent
                                                                                          response and repair
                                                                                          criteria that differ
                                                                                          from the criteria in
                                                                                          Sec.
                                                                                          192.620(d)(11)(ii)(A),
                                                                                          TETLP requests that
                                                                                          this section be noted
                                                                                          in the special permit
                                                                                          renewal. The Special
                                                                                          Permit renewal
                                                                                          pertains to the 36-
                                                                                          inch, approximately
                                                                                          268 miles of Lines 1
                                                                                          and 2 TETLP pipelines
                                                                                          starting from the
                                                                                          Bedford Compressor
                                                                                          Station in
                                                                                          Pennsylvania to the
                                                                                          Chambersburg,
                                                                                          Compressor Station in
                                                                                          Pennsylvania. There
                                                                                          are no class 4
                                                                                          locations in the
                                                                                          system and the current
                                                                                          segments operate at an
                                                                                          MAOP of 1,112 psig.
                                                                                          The pipeline segments
                                                                                          are located in
                                                                                          Fayette, Somerset,
                                                                                          Bedford, Fulton,
                                                                                          Franklin, Adams, York
                                                                                          and Lancaster Counties
                                                                                          in Pennsylvania.
PHMSA-2010-0063......................  Cook Inlet Energy LLC    Sec.   192.121.........  To reauthorize the
                                        (CIE) formerly issued                             continued operation of
                                        to Anchor Point Energy                            4.5-inch diameter, 8-
                                                                                          mile reinforced
                                                                                          thermoset plastic
                                                                                          material FS LPJ
                                                                                          (Fiberspar) pipeline
                                                                                          built in the Kenai,
                                                                                          Peninsula Borough near
                                                                                          Anchor Point, Alaska.
                                                                                          The renewal request
                                                                                          seeks to waive
                                                                                          compliance from Sec.
                                                                                          192.121. The Anchor
                                                                                          Point pipeline
                                                                                          transports natural gas
                                                                                          from the North Fork
                                                                                          Unit and delivers it
                                                                                          to a Sales Pipeline
                                                                                          operated by Enstar
                                                                                          Natural Gas Company.
                                                                                          The MAOP of this
                                                                                          pipeline is 1,328
                                                                                          psig. This special
                                                                                          permit would only
                                                                                          apply to Class 1
                                                                                          locations and areas
                                                                                          outside of high
                                                                                          consequence areas.
----------------------------------------------------------------------------------------------------------------

    Before acting on the special permit renewal requests, PHMSA will 
evaluate all comments received on or before the comments closing date 
in its decision to grant or deny the renewal requests. Comments will be 
evaluated after this date only if it is possible to do so without 
incurring additional expense or delay.

    Authority: 49 U.S.C. 60118 (c)(1) and 49 CFR 1.53.


[[Page 34494]]


    Issued in Washington, DC, on June 10, 2015.
Alan K. Mayberry,
Deputy Associate Administrator for Policy and Programs.
[FR Doc. 2015-14720 Filed 6-15-15; 8:45 am]
 BILLING CODE 4910-60-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.